Natasa Prascevic

Dr. Natasa Prascevic


Research Focus & Metrics

Academic Career Length

13Years (2014-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
20 November 2017 in JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT
Verified
Journal Article
Open access
PDF file
NPNatasa Prascevic
Natasa Prascevic
ZPZivojin Prascevic
Zivojin Prascevic
The construction project management (CPM) is very important and large segment of entire project manage­ment (PM). Realisation of construction projects is usually long term process which requests significant financial, mate­rial, human and other resources to fulfil contracted obligations and achieve a good quality of works. Therefore, making good decisions with the satisfaction of various criteria is one of the main conditions to achieve planed business objec­tives and finish the project in contracted time with good quality. This paper proposes a new procedure for determination of the weights of criteria and alternatives in the Fuzzy analytic hierarchy process (FAHP) with trapezoidal fuzzy number using a new method for finding eigenvelues and eigenvectors of the criteria and alternatives, which is based on expected values of the fuzzy numbers and their products. Local and global fuzzy weights of the alternatives are determined using linear programming. In the paper a formula for ranking fuzzy numbers by reduced generalized fuzzy mean is also pro­posed, since ranking by the coefficient of variation is not always reliable. In the presented case study, applying proposed method, from imprecise input data are obtained enough accurate and useful results for rational ranking of alternatives related to the project realization.

Verified
Journal Article
Open access
PDF file
MPMarija Petronijević
Marija Petronijević
NVNenad Višnjevac
Nenad Višnjevac
NPNatasa Prascevic
Natasa Prascevic
BBBranislav Bajat
Branislav Bajat
The growth of densely populated urban areas has caused traditional cadastral registration systems to face many difficulties in representing complex and multilevel property situations on 2D maps. These challenges, combined with the rapid development of 3D technologies, have forced the research and progress of 3D cadastre systems. The aim of this study is to investigate how a Building Information Model (BIM) can be used as a data source for the Land Administration Domain Model (LADM) based 3D cadastre system, and how that process can be improved. The Industry Foundation Classes (IFC) format and the LADM-based model were selected because both are international open standards that have a significant impact in their own domain. The data sample for the 3D cadastre system was extracted from a BIM model. The paper proposes an IFC format extension which makes it possible to define 3D geometry according to the LADM standard. In order to demonstrate this extension, the West 65 residential and business complex, Belgrade, was selected as a case study. The IFC format extension presented here is a step towards data harmonization between BIM in the IFC format and 3D cadastre systems; it should provide more suitable data in the current IFC schema and enable easy data flow between BIM projects and 3D cadastral data.

14 June 2024 in Water Science & Technology
Verified
Journal Article
Open access
PDF file
IMIvan Milojkovic
Ivan Milojkovic
NPNatasa Prascevic
Natasa Prascevic
There are many factors to consider when designing a sewerage pumping station (SPS), such as sizing the system, pump type, cooperation between pumps, SPS elevation, wastewater discharge location, system venting, correct number of inflows into the pumping station (PS) reservoir, and chemical resistance of the installations. In this study, we developed a multi-criteria-decision-making (MCDM) fuzzy AHP–VIKOR method with the aim to contribute to the improvement and development of MCDM methods. By combining and improving the existing AHP and VIKOR methods with the application of fuzzy logic theory, a novel fuzzy AHP–VIKOR method is for easier and clearer obtaining of optimal solutions. The new method was applied to obtain the findings in the analysis of four complex design solutions for canalisation, treatment, and pumping of atmospheric wastewater in the SPS in Makiš, an urban neighbourhood of Belgrade in Serbia. The analysis was carried out in relation to the stability of the solution by way of considering the use of different methods of MCDM optimisation, while taking into account ways of channelling, treatment, and evacuation of wastewater.

1 January 2014 in Građevinski materijali i konstrukcije
Verified
Journal Article
Open access
PDF file
ZPZivojin Prascevic
Zivojin Prascevic
NPNatasa Prascevic
Natasa Prascevic
In this paper is presented and applied one fuzzy TOPSIS method for the multicriteria ranking of objects for reconstruction and maintenance. At the beginning is given short review on the genesis and development of this method and described a TOPSIS procedure with crisp input data that constitute a decision matrix and weights of criteria. This procedure is illustrated by one simple numerical example. The necessity of presentation of these parameters as triangular fuzzy numbers due to impossibility of their precise determination or assessment in the practice. The exact expressions for the determination of these products of the decision matrix and weights coefficients as triangular fuzzy numbers, that authors of this paper are derived earlier, are given in the paper. For every alternative (the object) these parameters are assumed as random fuzzy numbers for which are determined generalised expected values, variances and standard deviations. From the normalised matrix of the expected values are determined expected ideal positive and ideal negative values. For every alternative are determined generalized expected distances and relative closenesses to the ideal positive and ideal negative solution. The ranking of alternatives is performed according to these values. Mathematical expressions for coefficients of investments distribution on the alternatives (objects) are proposed in the work. One example of ranking of the bridge structures according to the risk is given at the end of the work and formulated corresponding conclusions.

1 January 2021 in Građevinski materijali i konstrukcije
Verified
Journal Article
Open access
PDF file
ADAbel Duran
Abel Duran
NPNatasa Prascevic
Natasa Prascevic
The aim of this research is focused on the problem of allocation and selection of the construction equipment when construction firms bid for construction projects. The main objective of the selection of construction equipment is to ensure the timely completion of all considered projects, while at the same time the planned budget is fulfilled. In this paper fuzzy linear programming is applied with the fuzzy objective function and fuzzy constrains. The proposed mathematical model is applied for optimal selection and allocation of equipment for five projects with different quantities of concrete works and general budget.