Pauline Teo

Dr. Pauline Teo

orcid

Research Focus & Metrics

Academic Career Length

12Years (2015-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
15 January 2018 in Production Planning & Control
Verified
Journal Article
Closed access
PLPeter Love
Peter Love
PTPauline Teo
Pauline Teo
FAFran Ackermann
Fran Ackermann
JSJim Smith
Jim Smith
JAJames Alexander
James Alexander
JMJohn Morrison
John Morrison
A positive association between rework and safety events that arise during the construction process has been identified. In-depth semi-structured interviews with operational and project-related employees from an Australian construction organisation were undertaken to determine the precursors to rework and safety events. The analysis enabled the precursors of error to examined under the auspices of: (1) People, (2) Organisation, and (3) Project. It is revealed that the precursors to error for rework and safety incidents were similar. A conceptual framework to simultaneously reduce rework and safety incidents is proposed. It is acknowledged that there is no panacea that can be used to prevent rework from occurring, but from the findings presented indicate that a shift from a position of ‘preventing’ to ‘managing’ errors is required to enable learning to become an embedded feature of an organisation’s culture. As a consequence, this will contribute to productivity and performance improvements being realised.

1 February 2018 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
PLPeter Love
Peter Love
PTPauline Teo
Pauline Teo
JMJohn Morrison
John Morrison
Quality failure costs have been reported to range from less than 1 to over 20% of a project’s original contract’s value (OCV). Inconsistencies in their definition and determination have rendered such costs often being cited inappropriately to support a case for addressing poor quality in construction. Quality failure costs, which are expressed in the form of nonconformances (NCRs) costs, are derived and analyzed for 218 projects delivered by a contractor between 2006 and 2015. A total of 7,082 NCRs are categorized and quantified in accordance to their cost, and the differences among project type, procurement, and contract size are statistically examined. The analysis revealed that (1) mean NCR costs were 0.18% of OCV; (2) structural steel and concrete subcontracted works had the highest levels of NCRs; and (3) differences were found in the cost of NCRs among different procurement methods and contract sizes. The research provides the international construction community with invaluable insight into the real costs of quality failure that have been borne by a contractor. Thus, the paper makes a call to reinvigorate the need to engage with performance benchmarking so as to engender process improvement throughout the international construction industry.

20 September 2018 in Production Planning & Control
Verified
Journal Article
Closed access
PLPeter Love
Peter Love
JSJim Smith
Jim Smith
FAFran Ackermann
Fran Ackermann
ZIZahir Irani
Zahir Irani
PTPauline Teo
Pauline Teo
During the production of artefacts in construction, there is a likelihood for errors to be committed, which may need to be rectified so that they conform to defined contractual requirements and standards. In doing so, this initiates a process of rework, which is a problem that the industry has incessantly aimed to redress for decades with limited success. Rework is a ‘known-unknown’, but there remains a high degree of uncertainty about its costs. Such uncertainty occurs as there is a proclivity for the costs associated with rework to be largely ignored, concealed or considered to be normal function of operations. This paper presents the results from the first longitudinal and in-depth study of rework costs in construction. Based on a sample of 19,605 rework events derived from 346 construction projects delivered by a contractor between the years 2009 and 2015, it was revealed that their mean yearly profit over the period of analysis was reduced by a staggering 28%. In addition, 88 (0.45%) of the total 19,605 rework events accounted for 34% of the total costs that were incurred. The complete cost data for 98 of the 346 projects was made available, which enabled a mean rework cost of 0.39% of contract value to be determined. The research provides construction organizations with an improved understanding of the nature and likelihood of rework costs enabling them to move from a position of being a ‘known-unknown’ to becoming a ‘known-known’. Being able to ‘anticipate what might go wrong’ and ensure that risk management and controls are put in place throughout the construction process will contribute to their dynamic capability.

1 March 2018 in Safety Science
Verified
Journal Article
Closed access
PLPeter Love
Peter Love
PTPauline Teo
Pauline Teo
JMJohn Morrison
John Morrison

1 October 2016 in International Journal of Project Management
Verified
Journal Article
Closed access
PLPeter Love
Peter Love
PTPauline Teo
Pauline Teo
MDMurray Davidson
Murray Davidson
SCShaun Cumming
Shaun Cumming
JMJohn Morrison
John Morrison

1 November 2015 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
PLPeter Love
Peter Love
FAFran Ackermann
Fran Ackermann
PTPauline Teo
Pauline Teo
JMJohn Morrison
John Morrison