Kelly  Mott Lacroix

Dr. Kelly Mott Lacroix

orcid

Research Focus & Metrics

Academic Career Length

18Years (2009-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
28 March 2016 in Water
Verified
Journal Article
Open access
PDF file
KLKelly Mott Lacroix
Kelly Mott Lacroix
Sharon MegdalSharon Megdal
Sharon Megdal
Effective stakeholder engagement is fundamental to water management, yet there are as many approaches to consultation as there are efforts. This paper provides an evaluation of, and lessons learned from three water management engagement processes, and uses this assessment to offer a framework for stakeholder engagement. The Stakeholder Engagement Wheel framework is centered on a bridging organization that ensures that the process continues to move forward, and a steering committee that guides and changes activities according to stakeholder interests and concerns. Around the Stakeholder Engagement Wheel are four steps designed to examine iteratively the water management issue driving the engagement process and expand the sphere of interests involved. Many engagement processes have limited effectiveness because of: (1) paucity of time; (2) complexity of water resources management; (3) difficulty of engaging diverse stakeholders; and (4) lack of methods for engagement that are centered on empowerment, equity, trust, and learning. In this study, we have encountered all four of these issues and have addressed all but the first through a deliberate, iterative, and flexible approach. By cycling through activities and actions as proposed in the Stakeholder Engagement Wheel, we can build a community of practitioners with the nuanced and shared understanding needed for cohesive action and robust decisions in the face our considerable challenges.

23 May 2016 in Water
Verified
Journal Article
Open access
PDF file
SESusanna Eden
Susanna Eden
Sharon MegdalSharon Megdal
Sharon Megdal
ESEylon Shamir
Eylon Shamir
KCKarletta Chief
Karletta Chief
KLKelly Mott Lacroix
Kelly Mott Lacroix
Stakeholder participation is a foundation of good water governance. Good groundwater governance typically involves the co-production of knowledge about the groundwater system. Models provide a vehicle for producing this knowledge, as well as a “boundary object” around which scientists and stakeholders can convene the co-production process. Through co-production, stakeholders and scientific experts can engage in exchanges that create system knowledge not otherwise achievable. The process involves one-way transfer of information, active two-way conversations, and integration of multiple kinds of knowledge into shared understanding. In the Upper Santa Cruz River basin in Arizona, USA, the University of Arizona Water Resources Research Center (WRRC) convened a project aimed at providing scientific underpinnings for groundwater planning and management. This project, entitled Groundwater, Climate, and Stakeholder Engagement, serves as a case study employing the first two stages of knowledge co-production using a hydrological model. Through an iterative process that included two-way communication, stakeholders provided critical input to hydrologic modeling analyses. Acting as a bridging organization, the WRRC facilitated a co-production process, involving location-specific and transferability workshops, which resulted in new knowledge and capacity for applying the model to novel problems.

29 June 2016 in Water
Verified
Journal Article
Open access
PDF file
ABAlba Ballester
Alba Ballester
KLKelly Mott Lacroix
Kelly Mott Lacroix
The benefits of public participation in water management are recognized by governments, scholars, and stakeholders. These benefits, however, do not result from all engagement endeavors. This leads to the question: What are the determinants for effective public participation? Given a list of criteria for achieving the transformational capacity of participation, we analyze the benefits (including the influence on public policies) gained through public participation and the determinant factors for obtaining these benefits in the Ebro River Basin in Spain and in the Tucson Basin in Arizona (U.S.). Furthermore, and considering that droughts and floods are major water management challenges in both case studies, we focus on the potential of participation to build adaptive capacity. Our analysis of these case studies concludes that influence on public policies is determined more by the context of the participatory process, i.e., legal framework, political leadership, and social awareness, whereas influence on adaptive capacity building depends more on the characteristics of the participatory process, particularly the existence of active on-site consultation and deliberation.

1 May 2017 in Journal of Arid Environments
Verified
Journal Article
Closed access
KLKelly Mott Lacroix
Kelly Mott Lacroix
ETElia Tapia
Elia Tapia
ASAbraham Springer
Abraham Springer

14 January 2016 in Environmental Management
Verified
Journal Article
Closed access
PDF file
KLKelly Mott Lacroix
Kelly Mott Lacroix
BXBrittany C. Xiu
Brittany C. Xiu
SMSharon B. Megdal
Sharon B. Megdal

1 August 2009 in Water Policy
Verified
Journal Article
Closed access
AGAndrea K. Gerlak
Andrea K. Gerlak
SESusanna Eden
Susanna Eden
SMSharon Megdal
Sharon Megdal
KLKelly Mott Lacroix
Kelly Mott Lacroix
ASAndrew Schwarz
Andrew Schwarz
River restoration activities are becoming increasingly common in many communities today. Such efforts in Arizona are illustrative of a larger ecosystem and river restoration trend underway nationally and internationally. This paper examines river restoration efforts in Arizona in the context of changing federal and state agency missions and local priorities. Restoration projects on four significant rivers are analyzed with a keen look at the design features they share. Multiple purpose goals, collaborative funding and support, community involvement, and monitoring and maintenance emerged as important project design features. We found that the extent to which these features were planned and implemented in any given project varied with several factors such as size, accessibility to urban populations and the mission of the principal sponsoring entity.