Rusdi Usman Latief

Dr. Rusdi Usman Latief


Research Focus & Metrics

Academic Career Length

4Years (2023-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 March 2023 in Civil Engineering Journal
Verified
Journal Article
Open access
PDF file
RLRusdi Usman Latief
Rusdi Usman Latief
NAN. M. Anditiaman
N. M. Anditiaman
IRI. R. Rahim
I. R. Rahim
RAR. Arifuddin
R. Arifuddin
MTM. Tumpu
M. Tumpu
Productivity is one of the fundamental factors affecting competitiveness in the construction industry. Construction and productivity are two things that are interrelated. This study aims to identify the factors and model relationship these factors that affect labor productivity using the Structural Equation Modelling (SEM) in road construction projects in Indonesia as seen from each side area I, II, and III, respectively. The results obtained the factors that influence labor productivity in road construction projects in Indonesia, namely field conditions, time, financial factors, and internal labor. The study's findings indicate that internal labor is one of the elements influencing labor productivity in Indonesian construction projects, particularly road maintenance work. Labor productivity research in Indonesia is conducted by comparing planned and realized labor productivity calculations, which are conducted by collecting project data and making firsthand observations of work in the field. Labor productivity is measured using characteristics other than the variables used in the research, as well as a larger population and sample coverage. The findings of this study can be utilized as input for government agencies in determining the ability of specialists to carry out work in the field connected to the preservation of non-structural flood handling roads on Indonesian territory. Doi: 10.28991/CEJ-2023-09-03-07 Full Text: PDF

4 June 2025 in Engineering, Technology & Applied Science Research
Verified
Journal Article
Open access
PDF file
MIMuhammad Idris
Muhammad Idris
MRMuhammad Isran Ramli
Muhammad Isran Ramli
RLRusdi Usman Latief
Rusdi Usman Latief
SASumarni Hamid Aly
Sumarni Hamid Aly
This study develops a model to evaluate the economic feasibility of urban road network development by incorporating land value changes as a key component of the evaluation process. The model addresses the limitations of conventional approaches that focus solely on transportation efficiency by integrating transportation benefits, such as Vehicle Operating Cost (VOC) savings and Value of Time (VoT), with long-term fiscal benefits derived from increases in Taxable Value of Objects (TVO) and Land and Building Tax (LBT). The methodology includes Cost-Benefit Analysis (CBA), traffic simulation using PTV Visum, and a log-linear regression model to quantify the impact of improved accessibility on land value. The model is applied and validated through a case study of the Mamminasata bypass road project in South Sulawesi, Indonesia. The project shows a Benefit-Cost Ratio (BCR) of 2.86, a Net Present Value (NPV) of 7,329.47 million IDR, and an Internal Rate of Return (IRR) of 12.05%, with full payback of the investment within 12 years. This model provides a more integrated, sustainable, and forward-looking approach to assessing the economic viability of road infrastructure development by linking transport efficiency with land value dynamics.

13 July 2023 in International Journal on Advanced Science, Engineering and Information Technology
Verified
Journal Article
Open access
PDF file
RLRusdi Usman Latief
Rusdi Usman Latief
DPDaisy Pangemanan
Daisy Pangemanan
In the development of modern construction, the sustainable construction approach has grown in importance. Economic, environmental, and social factors have been identified as influencing its implementation. The use of the sustainable construction method is affected by several additional factors. This study aimed to determine how the Likupang SEZ’s local cultural factors affected sustainable construction methods. The method used is a quantitative study with a sample of the Likupang SEZ in North Sulawesi. The results of this study indicate an influence of local cultural factors of 0.264 on the implementation of the sustainable construction approach in the Likupang SEZ. The results of this study also indicate that local cultural factors are important to consider in implementing sustainable construction. Things that focus on local culture in planting trees as materials for construction, local heritage, Work Culture, and the migrant community environment should be of particular concern in implementing a sustainable construction approach in the Likupang SEZ area. Cultural factors have an important role in ensuring development with this sustainable construction approach considering environmental, social, and economic factors as well as cultural factors as new factors identified as having an influence. This study concludes that it is very important to pay attention to local cultural factors that influence the implementation of a sustainable construction approach in the Likupang SEZ project in North Minahasa Regency, North Sulawesi, Indonesia.

8 December 2025 in Engineering, Technology & Applied Science Research
Verified
Journal Article
Open access
FRFatmawaty Rachim
Fatmawaty Rachim
RLRusdi Usman Latief
Rusdi Usman Latief
RARosmariani Arifuddin
Rosmariani Arifuddin
Quality assessment is a critical part of a building's maintenance procedures, indicating its functionality. Measuring the level of damage in a building can be used as reference in decision making during repairs. The building's damage is influenced by structural, material, and environmental factors. However, the extent to which each criterion contributes to the damage is yet to be studied. This study analyzes the criteria that influence building quality damage by calculating their weight on the building's damage through the Analytic Hierarchy Process (AHP) method. Data were collected through in-depth interviews of experts in the field of building construction. The results reveal 6 main criteria and 33 sub-criteria that influence building quality damage. Further analysis indicated that the main structural criterion had the highest weight (0.4334) in determining the level of building quality deterioration, followed by the main architectural criterion (0.2074), electrical (0.1257), mechanical (0.0938), exterior layout (0.0708), and general building components (0.0690).

1 November 2025 in Journal of Engineering and Sustainable Development
Verified
Journal Article
Open access
PDF file
RLRusdi Usman Latief
Rusdi Usman Latief
IOIsmira Justy Ohorella
Ismira Justy Ohorella
RARosmariani Arifuddin
Rosmariani Arifuddin
MFMuh Rifan Fadlillah
Muh Rifan Fadlillah
The implementation of e-tenders in the construction industry in the era of globalization faces several challenges in many countries, including Indonesia. Maluku Island, one of Indonesia's main islands, is experiencing growth in the construction sector. However, it faces challenges, especially in improving the quality of contractor companies in implementing tenders. This research attempts to examine the issue of tender failure more comprehensively. This study aims to identify and analyze the dominant factors that can affect contractor failure in the tender process. The research methodology includes a literature study developed through relative importance index analysis to determine the dominant factors. The results showed that 36 factors affected contractor failure in the tender process for government construction projects in Maluku province. Factors affecting contractor failure in tendering for government projects are divided into four main categories: administrative document evaluation with an RII value of 0.65, qualification with an RII value of 0.71, technical with an RII value of 0.73, and price with an RII value of 0.73. Technical and price evaluation are the most crucial factors. This research is expected to help contractors prepare better strategies in the tender process, especially in terms of technical and price documents.

4 April 2026 in Engineering, Technology & Applied Science Research
Verified
Journal Article
Open access
PDF file
MYMuh Yusuf
Muh Yusuf
MAM. Asad Abdurrahman
M. Asad Abdurrahman
RLRusdi Usman Latief
Rusdi Usman Latief
This study explores how construction-phase design changes affect constructability performance in large-scale dam projects, using the Jenelata Dam Project in Indonesia as a case study. Three questions are tackled: (1) how design process factors relate to constructability, (2) how much these factors impact constructability performance, and (3) how design adaptations during construction influence time, cost, and constructability. A mixed-method approach was used, combining a survey of 32 project stakeholders (owners, consultants, and contractors), field observations, and document analysis. Quantitative analysis included Pearson correlation and multiple linear regression, with an R² of 0.786, showing strong explanatory power of design process variables. The results indicate that all design process factors are positively and significantly related to constructability, with Iterative and Adaptive Design being the most influential (β = 0.408). Qualitative validation shows that early and systematic design adaptations, such as replacing frame beams and hydroseeding with Geomat Type III for slope protection, and changing foundation treatment from vertical to rim grouting, led to significant improvements, including a 70% reduction in construction time and cost savings up to 61.3%. These findings provide empirical evidence that well-managed construction-phase design changes can improve constructability when coordinated and driven by data. The study offers practical insights for better integration of design and construction, and for managing design changes adaptively in complex dam projects.