Construction and demolition waste represents a growing environmental, social, and economic problem, and has become a priority for European and worldwide policies. The early quantification of construction waste is essential for the minimisation of its production and the improvement of waste management. This requires the development of design-based tools that enable a better understanding of the expected waste produced during the construction phase. Building Information Modelling (BIM) methodologies have gained recognition in the Architecture, Engineering, Construction, and Operations (AECO) sector, largely due to their capacity for data simulation, storage, and management during the building design phase. This study presents a software application, called WE-BIM Add-in, to quantify construction waste (CW) while designing the BIM model in Revit. A validated CW quantification model which enables waste types and quantities per building element to be predicted in detail according to the European List of Waste (LoW) is integrated into the Revit workflow. Design alternatives could be effortlessly simulated in real time to assist practitioners in decision-making during the early design stages. Two alternative structural systems of a Spanish residential building were compared: a reinforced concrete structure, Option 1 (O1), and a steel structure, Option 2 (O2). The results were obtained automatically: O2, in addition to reducing 56% of O1′s waste, would have increased the waste recycling rate by 49%; and displayed in Revit, thereby remaining consistent with those of other studies that compare prefabricated systems with in situ systems. This work provides a basis for future research into the automated estimation of construction waste in BIM which could become a useful tool in waste-prevention policies.
Construction waste (CW) is a prime contributor to the stream of total waste worldwide. One of the biggest challenges of the construction industry is to minimise CW and to develop practices of a more sustainable nature for its management and recycling in order to promote its transition towards a more effective circular economy. The implementation of these practices contributes towards mitigating the scarcity of natural resources and the environmental impact of CW. Thus, a preceding and essential step is the estimation of CW during building design, which will allow the adoption of measures for its early reduction and optimisation. For this purpose, Building Information Modelling (BIM) has become a useful methodology to predict waste during the early stages of design. There remains, however, a lack of instrumental development. Therefore, this study proposes a BIM-based method to estimate CW during building design by integrating a consolidated construction waste quantification model in three different BIM platforms. For its validation, the method is applied to the structural system of a Spanish residential building. The results provide evidence that the proposed method is vendor-neutral and enables the automatic identification and quantification of the waste generated by each building element during the design stage in multiple BIM platforms.
The scientific community has revealed the environmental benefits of recycling construction waste (CW) versus its disposal, and its contribution to circularity. The Life Cycle Assessment (LCA) method enables the environmental impact of CW management to be quantified and facilitates the comparison of recycling versus alternative disposal scenarios. However, due to its complexity, LCA is seldom used by technicians during the design phase, which constitutes a crucial stage in the prevention of environmental impacts. This paper therefore proposes an LCA-based tool, integrated into the Building Information Modelling (BIM) methodology, that helps designers to automate the environmental assessment of recycling versus disposal. The CW-LCA-BIM tool uses impact factors obtained from an LCA model applied to CW and was applied to the structural system of a building in Spain. Up to 99% of the non-hazardous waste was recyclable or reusable. The management of three types of recyclable waste was assessed: concrete (27.2 t), plastics (4.2 t), and steel (1.5 t). Recycling is shown to be the best option since it prevents 1.4 times (14.6 t) the emissions of the disposal scenario and saves 85 times (148.5 GJ) its energy consumption. This tool can be developed in other waste management systems and infrastructures. It can be useful both for designers for the reduction of the environmental impact of their buildings, and for policy managers for waste-prevention policies.