Máté Hegyháti

Dr. Máté Hegyháti

orcid

Research Focus & Metrics

Academic Career Length

18Years (2009-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 February 2009 in Chemical Engineering Science
Verified
Journal Article
Closed access
MHMáté Hegyháti
Máté Hegyháti
Thokozani MajoziThokozani Majozi
Thokozani Majozi
Tibor HolczingerTibor Holczinger
Tibor Holczinger
Ferenc FriedlerFerenc Friedler
Ferenc Friedler

30 June 2023 in Central European Journal of Operations Research
Verified
Journal Article
Open access
PDF file
MHMáté Hegyháti
Máté Hegyháti
Krisztián Attila BakonKrisztián Attila Bakon
Krisztián Attila Bakon
Tibor HolczingerTibor Holczinger
Tibor Holczinger
The optimization of manufacturing systems is rarely a deterministic task in practice, as uncertainties of various origins often have significant impact on the feasibility or quality of a production plan. The decision making process is often a complex multi-stage mechanism that anticipates and reacts to numerous parameter changes, both internal and external. Such optimization problems and the corresponding approaches are often classified and categorized based on the features of the addressed uncertainties and the desired objective. The goal of this paper is twofold. First, a systematic approach is presented to enumerate the possible optimization problems for a given set of uncertainties and degree of freedom in the planning. This approach is illustrated via a scheduling example that is inspired by literature case studies and focuses on financial objectives with varying demands and prices in the market. Then, selected problem classes identified by the approach are discussed in detail, illustrating and examining the available techniques to tackle them, citing literature studies applying the same or similar approaches.

27 April 2011 in Industrial & Engineering Chemistry Research
Verified
Journal Article
Closed access
MHMáté Hegyháti
Máté Hegyháti
Ferenc FriedlerFerenc Friedler
Ferenc Friedler

4 August 2020 in Optimization and Engineering
Verified
Journal Article
Open access
PDF file
MHMáté Hegyháti
Máté Hegyháti
Tibor HolczingerTibor Holczinger
Tibor Holczinger
Olivér ŐszOlivér Ősz
Olivér Ősz
Storage planning and utilization are among the most important considerations of practical batch process scheduling. Modeling the available storage options appropriately can be crucial in order to find practically applicable solutions with the best objective value. In general, there are two main limitations on storage: capacity and time. This paper focuses on the latter and investigates different techniques to tackle limited storage time within the S-graph framework. The S-graph framework is a collection of combinatorial algorithms and a directed graph based model that has been introduced three decades ago and has been under development ever since. In this work, several options for addressing storage time limitations within the framework were implemented and tested for efficiency. The empirical results over a huge number of tests have unequivocally favored one of the approaches, which will be applied in later developments.

24 November 2020 in Process Integration and Optimization for Sustainability
Verified
Journal Article
Closed access
PDF file
Olivér ŐszOlivér Ősz
Olivér Ősz
Dominic FooDominic Foo
Dominic Foo
MHMáté Hegyháti
Máté Hegyháti

30 March 2023 in Central European Journal of Operations Research
Verified
Journal Article
Open access
PDF file
Olivér ŐszOlivér Ősz
Olivér Ősz
BDBalázs Dávid
Balázs Dávid
MHMáté Hegyháti
Máté Hegyháti
With the growing significance of environmental awareness, the role of renewable materials and their reuse and recycling possibilities have become increasingly important. Wood is one of the best examples for this, as it is a material that has a variety of primary uses, while also being a prime candidate for reuse and recycling. An important phase in most waste wood value chains is the processing of bulk waste from various sources, usually by means of shredding. This paper presents methods for scheduling the machines in such a waste wood processing facility, where incoming deliveries of different types of wood are processed by a series of treatment and transformation steps to produce shredded wood. Two mathematical models are developed for the problem that both allow overlaps between consecutive steps to optimize resource flow through the system. One of these is a more traditional discrete-time model, while the other is precedence-based and uses continuous-time variables for the timing of the various tasks. Both modeling techniques have their advantages and shortcomings with regard to the ease of integration of further problem-specific parameters and requirements. Next to providing a sound approach for the identified problem class, another aim is to evaluate, which technique suits better for this problem class, and should be used as a basis for extended and integrated cases in the future. Thus, the performance of these models is compared on instances that were randomly generated based on real-world distributions from the literature.