Ahmed Azab

Dr. Ahmed Azab

Industrial and Manufacturing Systems Engineering, University of Windsor, Windsor, Ontario, Canada
orcid

Research Focus & Metrics

Academic Career Length

20Years (2007-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 January 2007 in CIRP Annals
Verified
Journal Article
Closed access
Ahmed AzabAhmed Azab
Ahmed Azab
HEH.A. ElMaraghy
H.A. ElMaraghy

1 February 2014 in Journal of Cleaner Production
Verified
Journal Article
Closed access
AZA. Ziout
A. Ziout
Ahmed AzabAhmed Azab
Ahmed Azab
MAM. Atwan
M. Atwan

1 December 2014 in Expert Systems with Applications
Verified
Journal Article
Closed access
BNB. Naderi
B. Naderi
Ahmed AzabAhmed Azab
Ahmed Azab

15 August 2013 in International Journal of Production Research
Verified
Journal Article
Closed access
VRV. Roshanaei
V. Roshanaei
Ahmed AzabAhmed Azab
Ahmed Azab
HEH. ElMaraghy
H. ElMaraghy
This study develops new solution methodologies for the flexible job shop scheduling problem (F-JSSP). As a first step towards dealing with this complex problem, mathematical modellings have been used; two novel effective position- and sequence-based mixed integer linear programming (MILP) models have been developed to fully characterise operations of the shop floor. The developed MILP models are capable of solving both partially and totally F-JSSPs. Size complexities, solution effectiveness and computational efficiencies of the developed MILPs are numerically explored and comprehensively compared vis-à-vis the makespan optimisation criterion. The acquired results demonstrate that the proposed MILPs, by virtue of its structural efficiencies, outperform the state-of-the-art MILPs in literature. The F-JSSP is strongly NP-hard; hence, it renders even the developed enhanced MILPs inefficient in generating schedules with the desired quality for industrial scale problems. Thus, a meta-heuristic that is a hybrid of Artificial Immune and Simulated Annealing (AISA) Algorithms has been proposed and developed for larger instances of the F-JSSP. Optimality gap is measured through comparison of AISA’s suboptimal solutions with its MILP exact optimal counterparts obtained for small- to medium-size benchmarks of F-JSSP. The AISA’s results were examined further by comparing them with seven of the best-performing meta-heuristics applied to the same benchmark. The performed comparative analysis demonstrated the superiority of the developed AISA algorithm. An industrial problem in a mould- and die-making shop was used for verification.

17 August 2022 in Expert Systems with Applications
Verified
Journal Article
Closed access
ZMZain Mustafa
Zain Mustafa
AAAhmed S.A. Awad
Ahmed S.A. Awad
MAMaher Azzouz
Maher Azzouz
Ahmed AzabAhmed Azab
Ahmed Azab

1 January 2020 in Journal of Manufacturing Systems
Verified
Journal Article
Closed access
Alejandro Vital-SotoAlejandro Vital-Soto
Alejandro Vital-Soto
Ahmed AzabAhmed Azab
Ahmed Azab
MBMohammed Fazle Baki
Mohammed Fazle Baki