The construction of NIMBY (Not in my backyard) facilities has caused many conflicts but is struggling to reduce it in China. With the background of public participation in social governance in the future, effective public participation is extremely helpful to solve this issue. Promoting public participation and scientifically evaluating the implementation effect of public participation are urgent problems to be solved at present. This study aims to analysis the factors hindering public participation and improve the implementation effect. Therefore, an evaluation system with 16 factors is established based on literature review and questionnaire survey, namely the basis of participation, participation process, external support, and cost-effectiveness. Interactions among the 16 factors are further evaluated by expert opinions. The objective and subjective weights of indicators are determined and combined by introducing Decision-Making Trial and Evaluation Laboratory (DEMATEL) and entropy weight method (EWM). Considering the uncertainty and randomness of subjective judgment, cloud model is introduced to evaluate the implementation effect of public participation. Finally, this framework is applied to evaluate the project of Jiu Feng waste-to-energy (WTE) plant in Hangzhou, China, which verifies the applicability of the evaluation framework for the implementation effect of public participation in NIMBY facilities. The results indicate that the implementation of public participation is between "average" and "good", with significant room for improvement in the involvement of NGOs and the influence of public opinion on decision-making. Additionally, the participation process has a significant impact on the whole system. The framework can provide government departments with guidance in implementing public participation.
14 March 2022 in Environmental Science and Pollution Research
Purpose: This paper improves the evaluation index system of green building operation effect and establishes the evaluation model of green building operation effect. It is expected to promote energy saving and emission reduction and provide a more scientific evaluation method for green building operation effect evaluation.Design/methodology/approach: First, 20 key evaluation indexes are selected to establish the operation effective evaluation index system. Then, the combined weight method is proposed to determine the weight of each evaluation index. Next, the gray clustering-fuzzy comprehensive evaluation method is used to construct the green building operation effective evaluation model. Finally, the feasibility and validity of the selected model were verified by taking Shenzhen Bay One green building in Shenzhen as an example.Findings: This paper establishes the evaluation system of green building operational effect, and evaluates green building from the angle of operational effect. Taking Shenzhen Bay One project as an example, the rationality and applicability of the model are verified.Originality/value: In this paper, for the first time, relevant indexes of user experience are included in the evaluation system of green building operational effect, which makes the evaluation system more perfect. In addition, a more scientific fuzzy gray clustering method is used to evaluate the operational effect of green building, and a new evaluation model is established.
Purpose: The purpose of this paper is to evaluate green buildings from the angle of greenness and improve the evaluation system. And the matter-element extension method is used to evaluate the greenness of green buildings, in order to provide useful references for the evaluation system of green buildings.Design/methodology/approach: First, this paper studies the aspects of safety and durability, health and comfort, living convenience, resource-saving, environmental liability and ecological quality, etc. For the first time, carbon emission is included in the evaluation system, 18 key evaluation indexes are determined by using the Delphi method, and the green building evaluation index system is established. Then, the combined weight method is proposed to determine the weight of each evaluation index, and the greenness evaluation model of green building is established with the matter-element extension method. Finally, taking Beijing Daxing International Airport as an example, the evaluation model of green building greenness was established to evaluate the building.Findings: In this paper, the greenness evaluation model of green building established by the matter-element extension method solves the problem of incompatibility between qualitative and quantitative material elements in multi-factor evaluation. It makes the evaluation indexes more accurate and objective relative to the affiliation calculation of the evaluation set and improves the scientific, accuracy and reliability of the evaluation model.Originality/value: In this paper, for the first time, carbon emission-related indicators are included in the green building evaluation system, which makes the evaluation system more perfect. In addition, a more scientific extension matter-element method is used to evaluate the greenness of green buildings, breaking the previous rough star evaluation method.
Construction of not in my back yard (NIMBY) facility Public Private Partnership (PPP) projects are feasible measures to realize sustainable urbanization. In order to ensure the smooth development of the NIMBY facility PPP projects, the problem of choosing the most suitable operation mode among many PPP modes is still scarce and unscientific. In order to select the operation mode of the PPP projects that best fits the characteristics of the project, this paper constructs the operation mode selection of the NIMBY facility PPP project. Firstly, the index system of operation mode selection of the NIMBY facility PPP project is determined. G1 subjective weighting method and information entropy objective weighting method are introduced to solve the optimal weight of each index. Grey correlation theory is used to improve TOPSIS method, and the calculation form of relative proximity degree is optimized to determine the most suitable operation mode for the project. In this paper, combined weighting and TOPSIS method are applied to the research of NIMBY facility PPP project, and the operation mode selection of NIMBY facility PPP project is established, which makes up the blank of this part. Finally, a PPP project in Qingdao, Shandong Province, China, is taken as an example to verify the applicability of the model. The effectiveness of this model was tested by comparing the results of TOPSIS method, Grey target model, Extended matter-element mode and GRA-TOPSIS. It is hoped to provide useful reference for the operation mode selection of NIMBY facility PPP project.