This paper aims at developing an integrated cloud-based internet of things (IoT) platform for asset management of elevated metro rail project. This platform will provide information about the various assets of the project and its location in real time which will be helpful in better management of assets. Furthermore, prototype of the platform is developed in which sensors are embedded on assets for traceability and its information can be directly accessed by stakeholders through this web based application. This platform will help reduce the amount of errors in information management. Also this would enhance collaboration amongst the various stakeholders of the project. It has been observed that by using this platform the paper works pertaining to the record keeping during the process of segment production and segment transportation can be reduced by about 30%. Furthermore, the cycle time for casting and transportation of each precast segment can be reduced by about 17% and 50% respectively. This indicates that there is an improvement of production efficiency. The results of the prototype conclude that the platform is feasible for application at construction sites for real time monitoring and management of assets.
25 January 2019 in International Journal of Technology
The “business as usual” scenario for most cities in India involves utilization of fossil fuels (diesel and CNG) for bus transit. Electric mobility is a potential solution to reduce the carbon footprint of city public transport. This paper analyzes the feasibility of this and computes the life cycle cost (LCC) of the procurement and operation of electric as opposed to diesel buses based on a functional unit of one bus driven 100 km per day. The research indicates that the total cost of ownership (TCO) of an electric bus, calculated over a life cycle of 25 years, is 5-10% less compared to a diesel bus. Sensitivity analysis is performed for the TCO of the electric bus in order to prepare a robust case to accommodate market fluctuations and the research assumptions. Component-wise analysis indicates several potential measures that may be taken to improve the viability and feasibility of electric buses. The research goal is to enable decision-making on the adoption of electric mobility by respective urban local bodies. This would promote the use of sustainable transport in urban localities and would also help in reducing the carbon footprint.
5 April 2023 in Journal of The Institution of Engineers (India): Series A
Risk identification and analysis for complex mega infrastructure projects has become an integral part of the present day project management process. This paper aims to develop an integrated Fuzzy Expected Value Method (FEVM) and Fuzzy Failure Mode and Effect Analysis (FFMEA) method for a complex infrastructure project such as the construction of an elevated corridor for metro rail in Ahmedabad, India. The design and methodology adopted in this research work was a primary data survey, where the major risky activities of an elevated metro rail infrastructure project were identified through interactions with experts, questionnaire surveys, and personal experience. The identified risks were analyzed for likelihood, impact, severity, detection, occurrence and risk priority numbers. Further computations of fuzzy risk severity (FRS), fuzzy risk priority score (FRPS), and risk rankings were carried out through the new application of integrated fuzzy EVM and fuzzy FMEA methods. It has been found that land acquisition, feasibility, tendering, segment erection, segment casting, obligatory span, construction planning, launching girder, road widening, piles and piers activities were highly risky and had very high fuzzy risk severity and FRPS values (0.605–0.775). Risk mitigation measures were proposed for all critical activities of the elevated metro project in Ahmedabad.
6 October 2020 in International Journal of Construction Management
Renewable energy sector projects like development and implementation of solar power plants are given preference and boost in India to meet the target for generation of green and clean energy. Like other complex infrastructure projects, the solar power projects also face risks and uncertainties throughout all the phases. Although new techniques and methods are introduced, risk assessment for projects remains an unstructured problem that depends on human expertise. This paper aims at identifying the risks involved and associated with all the phases of the solar power project in India and develop a methodology of risk analysis through application of Fuzzy TOPSIS (Technique for Order Preference by Similarities to Ideal Solution) methodology. Risk severity has been computed through computation of Fuzzy Positive Ideal Solution (FPIS), Fuzzy Negative Ideal Solution (FNIS) and Closeness Coefficient (CC). It has been observed that the risk severity of phase 1 ranges between moderate to high. Phase 2 ranges between high to very high, phase 3 and 4 are very high and finally phase 5 varies between moderate to high. Thereby the project authorities cannot afford to ignore any of the phases. Furthermore, suitable corrective and preventive risk mitigation measures have been recommended.