Manuel Alvarez

Dr. Manuel Alvarez


Research Focus & Metrics

Academic Career Length

21Years (2006-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
2 November 2021 in IEEE Access
Verified
Journal Article
Open access
KAKazi Main Uddin Ahmed
Kazi Main Uddin Ahmed
MBMath Bollen
Math Bollen
MAManuel Alvarez
Manuel Alvarez
Enhancing the efficiency and the reliability of the data center are the technical challenges for maintaining the quality of services for the end-users in the data center operation. The energy consumption models of the data center components are pivotal for ensuring the optimal design of the internal facilities and limiting the energy consumption of the data center. The reliability modeling of the data center is also important since the end-user’s satisfaction depends on the availability of the data center services. In this review, the state-of-the-art and the research gaps of data center energy consumption and reliability modeling are identified, which could be beneficial for future research on data center design, planning, and operation. The energy consumption models of the data center components in major load sections i.e., information technology (IT), internal power conditioning system (IPCS), and cooling load section are systematically reviewed and classified, which reveals the advantages and disadvantages of the models for different applications. Based on this analysis and related findings it is concluded that the availability of the model parameters and variables are more important than the accuracy, and the energy consumption models are often necessary for data center reliability studies. Additionally, the lack of research on the IPCS consumption modeling is identified, while the IPCS power losses could cause reliability issues and should be considered with importance for designing the data center. The absence of a review on data center reliability analysis is identified that leads this paper to review the data center reliability assessment aspects, which is needed for ensuring the adaptation of new technologies and equipment in the data center. The state-of-the-art of the reliability indices, reliability models, and methodologies are systematically reviewed in this paper for the first time, where the methodologies are divided into two groups i.e., analytical and simulation-based approaches. There is a lack of research on the data center cooling section reliability analysis and the data center components’ failure data, which are identified as research gaps. In addition, the dependency of different load sections for reliability analysis of the data center is also included that shows the service reliability of the data center is impacted by the IPCS and the cooling section.


1 February 2013 in Electric Power Systems Research
Verified
Journal Article
Closed access
PAULO M DE OLIVEIRA-DE JESUSPAULO M DE OLIVEIRA-DE JESUS
PAULO M DE OLIVEIRA-DE JESUS
MAManuel Alvarez
Manuel Alvarez
Jose M. YustaJose M. Yusta
Jose M. Yusta

13 September 2022 in Renewable Energy
Verified
Journal Article
Open access
HBHamed Bakhtiari
Hamed Bakhtiari
JZJin Zhong
Jin Zhong
MAManuel Alvarez
Manuel Alvarez

16 September 2021 in Electrical Engineering
Verified
Journal Article
Closed access
PDF file
AAA. E. Avila-Rojas
A. E. Avila-Rojas
PAULO M DE OLIVEIRA-DE JESUSPAULO M DE OLIVEIRA-DE JESUS
PAULO M DE OLIVEIRA-DE JESUS
MAManuel Alvarez
Manuel Alvarez

19 September 2017 in IEEE Transactions on Smart Grid
Verified
Journal Article
Closed access
MAManuel Alvarez
Manuel Alvarez
SRSarah Rönnberg
Sarah Rönnberg
JBJuan Bermudez
Juan Bermudez
JZJin Zhong
Jin Zhong
MBMath H. J. Bollen
Math H. J. Bollen
This work presents a generic storage model (GSM) inspired by the scheduling of hydraulic reservoirs. The model for steady state short-term (ST) operational studies interlaces with the long-term (LT) energy scheduling through a piecewise-linear Future Cost Function (FCF). Under the assumption that a Stochastic Dual Dynamic Programming (SDDP) approach has been used to solve the energy schedule for the LT, the FCF output from that study will be processed to obtain an equivalent marginal opportunity cost for the storage unit. The linear characteristic of a segment of the future cost function (FCF) will allow a linear modeling of the storage unit production cost. This formulation will help to coordinate the renewable resource along with storage facilities in order to find the optimal operation cost while meeting end-point conditions for the long-term plan of the energy storage. The generic model will be implemented to represent a battery storage and a pumped-hydro storage. A stochastic unit commitment (SUC) with the GSM will be formulated and tested to assess the day-ahead scheduling strategy of a Virtual Power Plant (VPP) facing uncertainties from production, consumption, and market prices.