Centralized Charging Station (CCS) provides a convenient charging and maintenance platform for providing battery charging and delivery services to serve Electric Vehicles (EVs)' battery swapping demands at battery swapping points. This pa-per proposes an operational planning framework for a CCS with integration of photovoltaic solar power sources and an Echelon Battery System (EBS) comprising batteries retired from EVs (known as CCS-PV-EBS). The system is characterized by second-ary using retired batteries to support the centrally charging ser-vices to the serving batteries. A rolling horizon-based operation strategy is proposed for the CCS-PV-EBS, which consists of a battery charging demand determination process and a multi-objective optimization process. An effective solving approach based on Multi-Objective Natural Aggregation Algorithm (MO-NAA) is developed for the proposed model. Extensive numerical simulations are conducted to validate the proposed method.
3 May 2023 in IEEE Transactions on Intelligent Transportation Systems
This paper presents a bilevel planning framework to coordinate truck mobile chargers (TMCs) and fixed chargers (FCs) on highways to promote charging flexibility and provide more choices for electric vehicle (EV) users. A collaborative location optimization (CLO) approach is developed at the upper level to optimize the location of charging stations. Furthermore, a collaborative capacity optimization (CCO) approach is formulated at the lower level to optimize the capacity of TMC and FC at candidate stations. In the proposed framework, origin-destination (OD) analysis, Floyd algorithm and Monte Carlo simulation (MCS) are employed to generate the spatial-temporal distribution of charging demand based on historical data. An improved income approach (IIA) is then developed to well capture the heterogeneity of EV users’ charging behavior. The waiting cost of EV users is estimated by their value of time (VOT), which helps them to make a better choice between TMC and FC. To solve the optimal model easily, the big-M method is applied to linearize and convert the nonlinear problem into a mixed-integer linear programming (MILP) model. Meanwhile, the analytical target cascading (ATC) technique is employed to realize the data exchange process between the upper and lower layers. Finally, numerical study demonstrates the effectiveness of the proposed framework and method.
26 December 2021 in IET Energy Systems Integration
It is recognized by academia and industry that second‐life batteries retired from electric vehicles still have use values and can be effectively used for supporting less demanding applications. At present, there lacks investigation on the applications of re‐using retired batteries on serving residential sector's energy management. Motivated by this, this paper studies the scenario of assembling retired batteries to be second‐life battery energy storage systems (SL‐BESSs) and using them to serve the energy demand of residential communities in an affordable manner. Based on an established SL‐BESS model, a two‐level community energy management framework is proposed, which optimizes the schedules of a SL‐BESS and other energy resources in a community subjected to a variety of short‐term operational objectives. In the upper level, a many‐objective optimization model is formulated, which comprehensively integrates four objectives covering the community's multi‐scale operational considerations. A NSGA‐III‐based solving approach is developed to find the non‐dominated solutions of the model. In the lower level, the optimal community scale load reshaping decisions and energy costs obtained from the upper level are allocated to individual houses. Extensive numerical case studies are conducted, and the results show that the proposed system can realize better trade‐off among the different operational considerations with less computational cost.
Solar photovoltaic (PV) generation is a promising energy cost-saving selection for depots that use electric vehicles (EVs) to deliver goods; however, the intermittency of power output renders it challenging to realize reliable and economical operations. This paper proposes a two-stage hierarchical operation management method of EVs for depots with on-site PV generation. In the day-ahead stage, considering real road networks and battery swapping mode, a coordinated scheduling model of delivery service and charging/discharging for EVs is constructed to minimize the overall energy cost and logistics delivery cost by using the forecasted PV power output. Moreover, an effective solution approach based on the natural aggregation algorithm and Floyd algorithm is developed for the model. In the actual operation stage, a model prediction control (MPC)-based rolling horizon operation strategy is proposed to correct EVs’ charging/discharging decisions with the realization of real-time PV power output, aiming at to minimize the deviation in the actual and day-ahead scheduled interactive power between the depot and upper grid. Finally, simulations are conducted to validate the proposed methods.