Mayank Panwar

Dr. Mayank Panwar

orcid

Research Focus & Metrics

Academic Career Length

15Years (2012-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 January 2017 in International Journal of Electrical Power & Energy Systems
Verified
Journal Article
Open access
RLRen Liu
Ren Liu
MMManish Mohanpurkar
Manish Mohanpurkar
MPMayank Panwar
Mayank Panwar
RHRob Hovsapian
Rob Hovsapian
ASAnurag Srivastava
Anurag Srivastava
SSSid Suryanarayanan
Sid Suryanarayanan
Real-time (RT) simulator is a powerful tool for analyzing operational and control algorithms in electric power systems engineering. For understanding the dynamic and transient behavior of a power systems, significant RT computation capabilities are essential. A single unit of RT simulator has limited simulation capabilities. The most common way of augmenting simulation capability is using a bank of locally connected RT simulators. However, creating a large-sized bank of RT simulators involves significant financial investments and hence may not be feasible at all research facilities. Power and energy systems research facilities that use RT simulators are at diverse physical locations. In addition to RT simulators, research facilities around the world house an array of facilities with unique power, energy, and control systems for innovative research. To leverage these unique research facilities, geographically distributed RT simulation based on Wide Area Network (WAN) is required. Typical RT simulators perform simulations with time-steps in the order of milliseconds to microseconds, whereas data latency for communication on WAN may be as high as a few hundred milliseconds. Such communication latency between RT simulators may lead to inaccuracies and instabilities in geographically distributed RT simulations. In this paper, the effect of communication latency on geographically distributed RT simulation is discussed and analyzed. In order to reduce the effect of the communication latency, a Real-Time Predictor (RTP), based on linear curve fitting is developed and integrated into the distributed RT simulation environment. Two geographically distributed digital RT simulators are used to perform dynamic simulations of an electric power system with a fixed communication latency and the predictor. Empirical results demonstrate the effects of communication latency on the simulation and the performance of the RTP to improve the accuracy of simulations

1 June 2017 in International Journal of Electrical Power & Energy Systems
Verified
Journal Article
Closed access
MPMayank Panwar
Mayank Panwar
SSSid Suryanarayanan
Sid Suryanarayanan
RHRob Hovsapian
Rob Hovsapian

1 September 2013
Verified
Conference Paper
Closed access
MPMayank Panwar
Mayank Panwar
BLBlake Lundstrom
Blake Lundstrom
JLJames Langston
James Langston
SSSid Suryanarayanan
Sid Suryanarayanan
SCSudipta Chakraborty
Sudipta Chakraborty
This paper explores and presents the capabilities of real time hardware-in-the-loop (RT-HIL) digital simulation for electric microgrids. RT-HIL is used by academia and industry for the simulation and testing of power systems at both the component and system levels. A literature survey is presented to identify existing real time simulation systems and some relevant applications. Simulations using RT-HIL involve modeling the interface between the components and systems in greater detail for increased understanding of interface issues. This is aimed at de-risking and hastening the penetration of new technologies such as microgrids.

27 June 2021 in Energies
Verified
Journal Article
Open access
PDF file
RHRob Hovsapian
Rob Hovsapian
JOJulian D. Osorio
Julian D. Osorio
MPMayank Panwar
Mayank Panwar
CCChryssostomos Chryssostomidis
Chryssostomos Chryssostomidis
JOJuan Ordonez
Juan Ordonez
In this work, the integration of a grid-scale ternary-Pumped Thermal Electricity Storage (t-PTES) with a nuclear power generation to enhance operation flexibility is assessed using physics-based models and digital real time simulation. A part of the electricity from the nuclear power generation is delivered to the grid, and the balance is used to power a heat pump that can be augmented by an auxiliary resistive load element to increase the charging rate of the thermal storage. This increases the thermal potential between hot and cold thermal stores (usually solid materials or molten salts inside large storage tanks). The thermal energy is transformed back into electricity by reversing the heat pump cycle. Different transient scenarios including startup, shutdown, and power change for grid-connected operation are simulated to determine the behavior of the hybrid nuclear-t-PTES system operating under variable loads that constitute a departure from conventional, baseload nuclear plant operation schemes. Ternary refers to the three modes operation: (i) heat pump (including heating coil), (ii) heat engine, and (iii) simultaneous operation of heat pump (including heating coil) and heat engine during changeover from pumping to generation or vice-versa. The controllability of t-PTES in the short timescales as a dynamic load is used to demonstrate operational flexibility of hybrid nuclear plants for flexible operation through advanced load management. The integration of t-PTES into nuclear power systems enhances the system flexibility and is an enabler for high penetration of renewable energy resources.

1 October 2012 in The Electricity Journal
Verified
Journal Article
Closed access
MPMayank Panwar
Mayank Panwar
GDGerald P. Duggan
Gerald P. Duggan
RGRobert T. Griffin
Robert T. Griffin
SSSid Suryanarayanan
Sid Suryanarayanan
DZDaniel Zimmerle
Daniel Zimmerle
SBSteve Brunner
Steve Brunner

1 September 2017
Verified
Conference Paper
Closed access
MSMarija Stevic
Marija Stevic
MPMayank Panwar
Mayank Panwar
MMManish Mohanpurkar
Manish Mohanpurkar
RHRob Hovsapian
Rob Hovsapian
AMAntonello Monti
Antonello Monti
Interconnection of digital real-time simulators over wide-area communication networks is an innovative approach to extend local real-time simulation capabilities to enable large-scale simulations. Furthermore, it allows the integration of geographically distributed assets as Power Hardware-in-the-Loop and Controller Hardware-in-the-Loop, thus providing a flexible framework for performing unique research experiments. In most cases, it is not possible to perform large scale real-time simulations and comprehensive experiments locally due to lack of simulation capacity and unavailability of unique assets. Main challenge associated with geographically distributed real-time simulation is to ensure simulation fidelity of the same degree as in the case when the entire simulation is performed at the same location. Simulation fidelity in geographically distributed real-time simulation is investigated and an empirical characterization is provided in this paper. Fidelity degradation caused by different values of time delay and sending rate of data exchange between two digital real-time simulators is presented. Two methods for representation of interface quantities in co-simulation interface algorithms are considered for performing simulations. The first method is based on representation of interface quantities as root mean square of magnitude, frequency, and phase angle of the current and voltage waveforms. The second method utilizes representation of interface quantities in form of time-varying Fourier coefficients, known as dynamic phasors. The empirical study is performed for transmission-distribution co-simulation using two racks of Real-Time Digital Simulator (RTDS®).