The effectiveness of collaboration in distributed networks, such as sensor networks and multi-agent systems, relies on nodes’ ability to exchange information. The availability of various communication protocols with different technical properties opens the possibility to guarantee connectivity during a system’s operation in any condition. A communication network can be represented by a graph on which connectivity can be expressed by a well-known algebraic connectivity value or Fiedler value. It is one of the most important tools used in many applications where connectivity preservation is required. In this paper, a trust-based consensus algorithm for algebraic connectivity estimation has been implemented. To guarantee the accomplishment of the global objective and the system’s performance, our contributions include: (i) a novel decentralized framework for combining multiple communication channels in a resulting channel and (ii) a decentralized algebraic connectivity control law that dynamically changes the number of agents in the system during operation. The proposed algebraic connectivity control strategy has been evaluated in simulations and in a real multi-robot system using two channels with different properties and initial topologies.
Rapid changes in electricity power markets have increased the production costs of coal-fired power plants and pushed their production to the limits of profitability. For power plants currently in operation, a possible approach to cope with this issue is to introduce novel methods that increase the plant’s reliability and availability. Coal mills are a subsystem that should ensure a plant’s availability without unexpected breakdowns. Remediation-based maintenance is defined as a set of actions performed after fault detection that do not require instant shutdown due to safety reasons. The aim of this paper was to provide a scientific confirmation that by implementing a novel remediation-based maintenance strategy, electricity production breakdowns can be significantly reduced. First, the performance of the proposed maintenance method was proved in simulation where coal mills were modeled by generalized stochastic Petri nets. The maintenance strategy was then experimentally verified in a 220 MW coal-fired power plant located in Croatia, where the plant’s availability, reliability and efficiency were increased.