Yield is a very important criterion to measure the semiconductor wafer fabrication facilities (FABs) productivity. The finished products will be check by Wafer Acceptance Test (WAT) and Circuit Probe (CP) to classified into ferior goods or inferior goods. This research applied the data from WAT and CP for the selection of the most important measuring parameters to improve the yield. Three methods, namely Support Vector Regression (SVR), Group Method of Data Handling (GMDH), Genetic Algorithm-Backpropagation Neural Network (GA-BPNN), were applied to model the system and were compared to investigate the best variable combination among 164 variables. It was found that the data need to be first classified in order to enhance the performances. Also, GA-BPNN out performed other methods using only 9 variables. The results were confirmed by engineers and used in FABs to improve the yield by controlling these parameters.
In this paper, a data-driven approach was applied to improve a furnace zone of a foundry in Taiwan. Improvements are based on the historical production records, order-scheduling, and labor-scheduling data. To resolve the bottleneck provided by the company, historical data were analyzed, and the existence of large variance in the process was found. Statistical analysis was performed to identify the primal factors causing the variance, and suggestions were made and implemented to the production line. As a result, daily production increased steadily to more than 30 pots of molten metal, while the original production was 20–30 pots of molten metal and are not controllable. Such significant improvement was mainly made by standardizing the input and reducing the variance of processes. The average cycle time of each pot of molten metal was reduced from 219 min to 135 min. Our suggested improvements also reduced the foundry’s electricity consumption cost by almost $240,000NT per month. In summary, data analysis can help traditional industries in identifying the main factors causing the bottleneck.
This paper presents a new unbiased average traffic speed (UARTS) estimation method for intelligent transportation system using GPS and radar gun equipped probe vehicles. Unlike the traditional probe-vehicle-based average traffic speed (ARTS) estimation methods, in the UARTS estimation the probe vehicles send their position, time, and neighbor vehicles' speeds (which are detected by the radar gun on the probe vehicles) to the control center (CC) to proceed with the maximum-likelihood (ML) estimation. In this way, the estimation accuracy is not affected by the distribution of the probe vehicles' speed. In this paper, the UARTS scheme as well as the GPS and radar gun equipped probe vehicles are described in detail. The mean and the estimation errors of the UARTS and the ARTS estimators are derived. Through computer simulations, the accuracy of the UARTS estimator is examined under different biased speed, detection range of the radar gun, and density of the probe vehicles. Finally, a real data experiment is performed to compare the accuracy of the proposed UARTS and the traditional ARTS estimators.