Christoph Streuling

Mr. Christoph Streuling

orcid

Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 August 2021 in International Journal of Hydrogen Energy
Verified
Journal Article
Open access
SHSebastian Herwartz
Sebastian Herwartz
JPJohannes Pagenkopf
Johannes Pagenkopf
CSChristoph Streuling
Christoph Streuling

23 July 2021 in Sustainability
Verified
Journal Article
Open access
PDF file
CSChristoph Streuling
Christoph Streuling
JPJohannes Pagenkopf
Johannes Pagenkopf
MSMoritz Schenker
Moritz Schenker
KLKim Lakeit
Kim Lakeit
Battery electric multiple units (BEMU) are an effective path towards a decarbonized regional rail transport on partly electrified rail lines. As a means of sector coupling, the BEMU recharging energy demand provided through overhead line islands can be covered from decentralized renewable energy sources (RES). Thus, fully carbon-free electricity for rail transport purposes can be obtained. In this study, we analyze cost reduction potentials of efficient recharging infrastructure positioning and the feasibility of covering BEMU energy demand by direct-use of locally produced renewable electricity. Therefore, we set up a model-based approach which assesses relevant lifecycle costs (LCC) of different trackside electrification alternatives comparing energy supply from local RES and grid consumption. The model-based approach is applied to the example of a German regional rail line. In the case of an overhead line island, the direct-use of electricity from adjacent wind power plants with on-site battery storage results in relevant LCC of EUR 173.4 M/30a, while grid consumption results in EUR 176.2 M/30a whereas full electrification results in EUR 224.5 M/30a. Depending on site-specific factors such as existing electrification and line lengths, BEMU operation and partial overhead line extension can lead to significant cost reductions of recharging infrastructure as compared to full electrification.