Xiao LI

Dr. Xiao LI

Department of Building and Real Estate, The Hong Kong Polytechnic University, Hong Kong
orcid

Research Focus & Metrics

Academic Career Length

12Years (2015-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 February 2018 in Automation in Construction
Verified
Journal Article
Closed access
Xiao LIXiao LI
Xiao LI
WYWen Yi
Wen Yi
HCHung-Lin Chi
Hung-Lin Chi
XWXiangyu Wang
Xiangyu Wang
Albert ChanAlbert Chan
Albert Chan

1 May 2018 in Automation in Construction
Verified
Journal Article
Closed access
Clyde Zhengdao LiClyde Zhengdao Li
Clyde Zhengdao Li
Fan XueFan Xue
Fan Xue
Xiao LIXiao LI
Xiao LI
JHJingke Hong
Jingke Hong
Geoffrey Qiping ShenGeoffrey Qiping Shen
Geoffrey Qiping Shen

Verified
Journal Article
Open access
PDF file
XLXin Liu
Xin Liu
XWXiangyu Wang
Xiangyu Wang
GWGraeme Wright
Graeme Wright
JCJack C.P. Cheng
Jack C.P. Cheng
Xiao LIXiao LI
Xiao LI
RLRui Liu
Rui Liu
The integration of Building Information Modeling (BIM) and Geographic Information System (GIS) has been identified as a promising but challenging topic to transform information towards the generation of knowledge and intelligence. Achievement of integrating these two concepts and enabling technologies will have a significant impact on solving problems in the civil, building and infrastructure sectors. However, since GIS and BIM were originally developed for different purposes, numerous challenges are being encountered for the integration. To better understand these two different domains, this paper reviews the development and dissimilarities of GIS and BIM, the existing integration methods, and investigates their potential in various applications. This study shows that the integration methods are developed for various reasons and aim to solve different problems. The parameters influencing the choice can be summarized and named as “EEEF” criteria: effectiveness, extensibility, effort, and flexibility. Compared with other methods, semantic web technologies provide a promising and generalized integration solution. However, the biggest challenges of this method are the large efforts required at early stage and the isolated development of ontologies within one particular domain. The isolation problem also applies to other methods. Therefore, openness is the key of the success of BIM and GIS integration.

1 December 2017 in Automation in Construction
Verified
Journal Article
Closed access
Xiao LIXiao LI
Xiao LI
PWPeng Wu
Peng Wu
Geoffrey Qiping ShenGeoffrey Qiping Shen
Geoffrey Qiping Shen
XWXiangyu Wang
Xiangyu Wang
YTYue Teng
Yue Teng

1 February 2022 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
PDF file
Xiao LIXiao LI
Xiao LI
WLWeisheng Lu
Weisheng Lu
Fan XueFan Xue
Fan Xue
LWLiupengfei Wu
Liupengfei Wu
RZRui Zhao
Rui Zhao
JXJinying Xu
Jinying Xu
Configuring a trustworthy Internet of Things (IoT)–enabled building information modeling (BIM) platform (IBP) is significant for modular construction to ensure transparency, traceability, and immutability throughout its fragmented supply chain management. However, most current IBPs are designed adopting a centralized system architecture, which fails to achieve a decentralized and effective one to ensure a single point of truth in BIM and prevent a single point of failure in IoT networks. To address this challenge, this study introduces permissioned blockchain with IBP and proposes a novel service-oriented system architecture of blockchain-enabled IoT-BIM platform (BIBP) for the data-information-knowledge (DIK)–driven supply chain management in modular construction. First, infrastructure as a service (IaaS) is designed with hardware, core technologies, and protocols to offer accurate data from daily practice to blockchain BIM. Blockchain BIM as a service (BaaS) is then developed within the permissioned blockchain to ease the interoperability of the information, semantics, and meaningful inferences. Furthermore, software as a service (SaaS) is configured with decentralized applications to achieve knowledgeable operations or processes with a crash fault-tolerant consensus mechanism. The demonstrative case study in a modular student residence project evaluates the proposed BIBP system prototype with the performance analysis of storage cost, throughput, latency, privacy, and feedback from stakeholders. The results indicate that BIBP has an effective system architecture with acceptable throughput and latency, can save storage costs to achieve a single point of truth in BIM, and avoid a single point of failure for IoT networks with privacy and security-preserving mechanisms.

1 April 2019 in Automation in Construction
Verified
Journal Article
Closed access
Xiao LIXiao LI
Xiao LI
Geoffrey Qiping ShenGeoffrey Qiping Shen
Geoffrey Qiping Shen
PWPeng Wu
Peng Wu
TYTeng Yue
Teng Yue