Hansol Shin

Dr. Hansol Shin

orcid

Research Focus & Metrics

Academic Career Length

8Years (2019-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
7 November 2022 in Energy
Verified
Journal Article
Closed access
KKKyuhyeong Kwag
Kyuhyeong Kwag
HSHansol Shin
Hansol Shin
HOHyobin Oh
Hyobin Oh
SYSangmin Yun
Sangmin Yun
TKTae Hyun Kim
Tae Hyun Kim
WKWook Kim
Wook Kim

1 October 2019 in Applied Energy
Verified
Journal Article
Open access
HSHansol Shin
Hansol Shin
TKTae Hyun Kim
Tae Hyun Kim
HKHyoungtae Kim
Hyoungtae Kim
SLSungwoo Lee
Sungwoo Lee
WKWook Kim
Wook Kim


13 January 2025 in Applied Sciences
Verified
Journal Article
Open access
PDF file
KKKYUHYEONG KWAG
KYUHYEONG KWAG
HSHansol Shin
Hansol Shin
HOhyobin oh
hyobin oh
HYHyeongseok Yun
Hyeongseok Yun
HYHyojeong Yoon
Hyojeong Yoon
WKWook Kim
Wook Kim
Electricity markets are transitioning to zonal and nodal pricing to maximize social welfare, improve price signals, and enhance congestion management. South Korea, traditionally reliant on uniform pricing, is evaluating this transition but lacks a detailed impact analysis. This study assessed the impacts of various zonal and nodal pricing schemes on power systems and provided policy implications for this transition. We (1) modeled the power system at various levels of granularity, obtaining a detailed 4579-node representation; (2) constructed a set of zonal and nodal pricing schemes reflecting changes in market-clearing models and pricing mechanisms; and (3) performed quantitative analyses through simulations for each scheme. Under the current system marginal price (SMP)-based uniform pricing, the schemes with the least market impact are SMP-based zonal pricing with two bidding zones and extended locational marginal pricing. These results can guide the development of an appropriate pricing transition pathway, although a market price reduction of 4.8–7.0% appears inevitable. Within the Korean electricity market, wherein a Transco is a monopoly retailer, we identified potential conflicts of interest for the Transco in zonal and nodal pricing. By focusing on South Korea, this study offers valuable insights into any electricity market considering the transition to zonal and nodal pricing.

9 June 2021 in Energies
Verified
Journal Article
Open access
PDF file
HSHansol Shin
Hansol Shin
TKTae Hyun Kim
Tae Hyun Kim
KKKYUHYEONG KWAG
KYUHYEONG KWAG
WKWook Kim
Wook Kim
Under marginal-cost pricing, some generators cannot recover their production costs at the market price due to non-convexities in the electricity market. For this reason, most electricity markets pay side-payments to generators whose costs are not sufficiently recovered, but side-payments present the problem of deteriorating transparency in the market. Recently, convex hull pricing and extended locational marginal pricing have been reviewed or gradually introduced to reduce side-payments. Another method is to include non-convex costs in the market price, which is applied in the Korean electricity market. Although it is not generally considered in the electricity market, the Vickrey auction method is also one of the pricing mechanisms that can reduce side-payments. The main purpose of this study is to analyze the financial impact of these alternative pricing mechanisms on market participants through rigorous simulation. We applied the alternative pricing schemes to the Korean electricity market, and the impacts are analyzed by comparing the cost aspect of an electricity sales company and the profit aspect of generation companies. As a result of the simulation study, each pricing mechanism not only differed in the degree to which side-payments are reduced but also has different effects on the type of generators.

13 December 2019 in Energies
Verified
Journal Article
Open access
PDF file
SLSungwoo LEE
Sungwoo LEE
HKHyoungtae Kim
Hyoungtae Kim
TKTae Hyun Kim
Tae Hyun Kim
HSHansol Shin
Hansol Shin
WKWook Kim
Wook Kim
In the transmission expansion planning (TEP) problem, it is challenging to consider a fault current level constraint due to the time-consuming update process of the bus impedance matrix, which is required to calculate the fault currents during the search for the optimal solution. In the existing studies, either a nonlinear update equation or its linearized version is used to calculate the updated bus impedance matrix. In the former case, there is a problem in that the mathematical formulation is derived in the form of mixed-integer nonlinear programming. In the latter case, there is a problem in that an error due to the linearization may exist and the change of fault currents in other buses that are not connected to the new transmission lines cannot be detected. In this paper, we use a method to obtain the exact updated bus impedance matrix directly from the inversion of the bus admittance matrix. We propose a novel method based on the inverse matrix modification lemma (IMML) and a valid inequality is proposed to find a better solution to the TEP problem with fault current level constraint. The proposed method is applied to the IEEE two-area reliability test system with 96 buses to verify the performance and effectiveness of the proposed method and we compare the results with the existing methods. Simulation results show that the existing TEP method based on impedance matrix modification method violates the fault current level constraint in some buses, while the proposed method satisfies the constraint in all buses in a reasonable computation time.