Jia Luo

Dr. Jia Luo


Research Focus & Metrics

Academic Career Length

8Years (2019-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
8 April 2019 in arXiv
Verified
Preprint
Open access
PDF file
JLJia Luo
Jia Luo
DBDidier Jean-François El Baz
Didier Jean-François El Baz
There have been extensive works dealing with genetic algorithms (GAs) for seeking optimal solutions of shop scheduling problems. Due to the NP hardness, the time cost is always heavy. With the development of high performance computing (HPC) in last decades, the interest has been focused on parallel GAs for shop scheduling problems. In this paper, we present the state of the art with respect to the recent works on solving shop scheduling problems using parallel GAs. It showcases the most representative publications in this field by the categorization of parallel GAs and analyzes their designs based on the frameworks.

26 March 2019 in arXiv
Verified
Preprint
Open access
PDF file
JLJia Luo
Jia Luo
DBDidier El Baz
Didier El Baz
The flexible flow shop scheduling problem is an NP-hard problem and it requires significant resolution time to find optimal or even adequate solutions when dealing with large size instances. Thus, this paper proposes a dual island genetic algorithm consisting of a parallel cellular model and a parallel pseudo model. This is a two-level parallelization highly consistent with the underlying architecture and is well suited for parallelizing inside or between GPUs and a multi-core CPU. At the higher level, the efficiency of island GAs is improved by exploring new regions within the search space utilizing different methods. In the meantime, the cellular model keeps the population diversity by decentralization and the pseudo model enhances the search ability by the complementary parent strategy at the lower level. To encourage the information sharing between islands, a penetration inspired migration policy is designed which sets the topology, the rate, the interval and the strategy adaptively. Finally, the proposed method is tested on some large size flexible flow shop scheduling instances in comparison with other parallel algorithms. The computational results show that it cannot only obtain competitive results but also reduces execution time.