This article presents an interactive method of computer-aided assembly planning. It is estimated that such planning will be more and more desirable due to the increasing use of prefabrication in construction. Prefabrication meets the trends of sustainable development and digitization as it enables the application of intelligent control systems at the stage of highly specialized production, assembly and facility maintenance. The presented planning method is based on the Monte Carlo simulations and logical algorithms for assembly work planning. It was determined on the basis of the literature studied and our own observations. The paper introduces a detailed model of assembly works planning and is an example of using a computer application developed on the basis of the described model. The example confirms the correctness of the algorithm and indicates its usefulness in the scope of analyzing many decision variants. Further research on labor productivity rates for assembly works, implementation of digital databases of assembly machines and prefabricated elements, as well as integration of the proposed application with the BIM environment should make it easier to commercialize the developed application.
Man or machine hours needed by various resources to complete construction works are the basis for work estimation and scheduling. In particular, they enable the planner to estimate labor costs or time needed to complete the task, review the resource of workload and availability of resources assigned to particular task, check the possibility of sharing resources across various tasks and determine other rates and factors useful in works scheduling. The project schedule can be analyzed both without or with and in consideration of risk of the end date of the project being pushed out or going over budget on the project. Issues presented above are the subject of this paper. The methods of solving described problems consider the optimization of a loss that derives from partial utilization of assigned the resources.
23 May 2017 in Scientific Review Engineering and Environmental Sciences (SREES)
The article discusses some important issues of constraints modeling in teams’ work planning in linear scheduling method. It also introduces a concept of a flexible method of planning in which constraints and optimization criteria are defined flexibly during the interactive and simulative planning. The method consists in determining quasi-optimal schedules with an interaction of Planner who amends the constraints and optimization criteria.
23 February 2019 in IOP Conference Series: Materials Science and Engineering
Schedule optimization is closely associated with the utilization of resources. Basing on Adamiecki's Law of Harmony, it is proposed that the schedule quality should be assessed by the effects of resources' downtime. According to authors' approach, scheduling consists in allocation of resources' work. All available resources generate total availability of work. Schedule quality assessment should be made by evaluating under-allocated work. It is a difference between total work available and work that is actually allocated as a result of the analysed schedule. Therefore, under-allocated work stands for resources' underutilization. Under-allocated work should be cost-evaluated over time with regard to particular resources or whole groups of resources (i.e. particular contractor's resources – if construction is performed by several contractors). The goal of the schedule optimization is to minimize cost of under-allocated work, especially in short-term planning horizon. The proposed method of harmonization assessment can be used in order to assess and compare any schedules, even those planned by independent schedulers for the same scope of works.
The paper presented the model of a problem of choosing the location of a car crane for the installation of prefabricated elements in a given assembly situation with the solution proposal. The issue relates to the situation, in which the dimensions of the shielding structure (assembled) are specified, sizes and weights of the prefabricated elements with their location on the structure. The solution seeks the best location of a crane from the point of view of the parameters of the crane, scope and height of the lift.
This article refers to the analytical researching of the processes of work to establish the rational manners for realizations and standardization models for work planning.