Jorge Martínez-Crespo

Dr. Jorge Martínez-Crespo

orcid

Research Focus & Metrics

Academic Career Length

21Years (2006-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
22 September 2009 in IEEE Transactions on Power Delivery
Verified
Journal Article
Closed access
HKH. M. Khodr
H. M. Khodr
JMJorge Martínez-Crespo
Jorge Martínez-Crespo
MMM. A. Matos
M. A. Matos
JPJ. Pereira
J. Pereira
This paper presents a new and efficient methodology for distribution network reconfiguration integrated with optimal power flow (OPF) based on a Benders decomposition approach. The objective minimizes power losses, load balancing among feeders, and is subject to constraints: capacity limit of branches, minimum and maximum power limits of substations or distributed generators, minimum deviation of bus voltages, and radial optimal operation of networks. A specific approach of the generalized Benders decomposition algorithm is applied to solve the problem. The formulation can be embedded under two stages: the first one is the master problem and is formulated as a mixed integer nonlinear programming problem. This stage determines the radial topology of the distribution network. The second stage is the slave problem and is formulated as a nonlinear programming problem. This stage is used to determine the feasibility of the Master problem solution by means of an OPF and provides information to formulate the linear Benders cuts that connect both problems. The model is programmed in the general algebraic modeling system. The effectiveness of the proposal is demonstrated through three examples extracted from the literature.

1 July 2009 in Electric Power Systems Research
Verified
Journal Article
Open access
JAJorge L. Angarita
Jorge L. Angarita
JUJulio Usaola
Julio Usaola
JMJorge Martínez-Crespo
Jorge Martínez-Crespo
Present regulatory trends are promoting the irect participation of wind energy in electricity markets. The final result of these markets sets the production scheduling for the operation time, including a power commitment from the wind generators. However, wind resources are uncertain, and the final power delivered usually differs from the initial power committed. This imbalance produces an overcost in the system, which must be paid by those who produce it, e.g., wind generators among others. As a result, wind farm revenue decreases, but it could increase by allowing wind farms to submit their bids to the markets together with a hydro generating unit, which may easily modify its production according to the expected imbalance. This paper presents a stochastic optimization technique that maximizes the joint profit of hydro and wind generators in a pool-based electricity market, taking into account the uncertainty of wind power prediction.En prens

30 January 2006 in IEEE Transactions on Power Systems
Verified
Journal Article
Closed access
JMJorge Martínez-Crespo
Jorge Martínez-Crespo
JUJulio Usaola
Julio Usaola
JFJ.L. Fernandez
J.L. Fernandez
This paper presents an approach to determine the optimal daily generation scheduling based on the Spanish electricity market rules. The Spanish power system considers the pool-based daily market and the technical constraints resolution as two different and consecutive processes. After the daily market has been cleared, a centralized constraints resolution process is applied to this initial scheduling through the redispatch of previously matched energy. In this paper, an algorithm based on Benders decomposition, arranged in three levels, is proposed to solve the technical constraints solution process in order to define a preventive secure dispatch. The constraints resolution process includes a full ac network and security model. This method determines the active power committed to each generating unit so as to minimize the energy redispatch cost subject to dispatch, network, and security constraints. The solution also provides the reactive power output of the generating units, the value of the transformers taps, and the committed voltage control devices. The model has been tested in an actual example of the Spanish power system. Some relevant results are reported.

8 June 2009 in IET Generation, Transmission & Distribution
Verified
Journal Article
Closed access
HKH.M. Khodr
H.M. Khodr
JMJorge Martínez-Crespo
Jorge Martínez-Crespo
A new and efficient methodology for distribution network reconfiguration integrated with optimal power flow (OPF) based on a Benders decomposition approach is presented. The objective minimises power losses, balancing load among feeders and subject to constraints such as capacity limit of branches, minimum and maximum power limits of substations or distributed generators, minimum deviation of bus voltages and radial optimal operation of networks. A variant of the generalised Benders decomposition algorithm is applied to solve the problem. The formulation can be embedded under two stages; the first one is the master problem and is formulated as a mixed integer non-linear programming problem. This stage determines the radial topology of the distribution network. The second stage is the slave problem and is formulated as a non-linear programming problem. This stage is used to determine the feasibility of the master problem solution by means of an OPF and provides information to formulate the linear Benders cuts that connect both problems. The model is programmed in GAMS mathematical modelling language. The effectiveness of the proposal is demonstrated through two examples extracted from the specialised literature.

1 May 2007 in Electric Power Systems Research
Verified
Journal Article
Closed access
JMJorge Martínez-Crespo
Jorge Martínez-Crespo
JUJulio Usaola
Julio Usaola
JFJosé L. Fernández
José L. Fernández

15 May 2024 in Building and Environment
Verified
Journal Article
Open access
Daniel Sánchez-GarcíaDaniel Sánchez-García
Daniel Sánchez-García
DBDavid Bienvenido-Huertas
David Bienvenido-Huertas
JMJorge Martínez-Crespo
Jorge Martínez-Crespo
RDRichard de Dear
Richard de Dear