Steel slag CO2 sequestration helps mitigate global warming and decrease the stockpile of steel slag (SS). Through orthogonal design tests and single-factor tests, this paper evaluated the effects of the water/solid mass ratio (w/s), gypsum ratio (G/SS), molding pressure, and curing duration on uniaxial compressive strength (UCS) and CO2 uptake of the compacts. The results indicated that high w/s enhanced both strength and CO2 capture ability. The proper addition of gypsum helps promote UCS increase and CO2 uptake of steel slag. In addition, increasing the molding pressure can significantly improve UCS without reducing CO2 uptake. The optimum conditions in the study were a w/s of 0.20, G/SS of 1/16, and molding pressure of 27 MPa, under which conditions 1 d UCS and CO2 uptake were 55.30 MPa and 12.36%, respectively. Microanalyses showed that gypsum activates mainly mayenite in steel slag. An increase in water addition also increased the hydration and carbonation products greatly, and the strengthened molding pressure had a significant densification effect on micro-pore structures. The study gives guidance in the application of steel slag in CO2 capture and manufacturing green construction material.
30 January 2024 in Construction and Building Materials
To improve the utilization of steel slag (SS) in CO2 capture and making building materials, the paper mainly discussed the effects of desulphurization gypsum (DG) and w/s ratio on strength development and CO2 capture capability of high Al content SS. It showed that 10 wt% DG enhanced the strength of hydration-curing SS by 262% at 28 days. Similarly, adding 6 wt% DG in carbonation-curing SS contributed to increases in strength and CO2 uptake by 283% and 33.54%, reaching 42.68 MPa and 19.12%, respectively. Strength decreases and CO2 uptake increases with w/s. Microanalysis (QXRD, SEM-EDS, TG-DTG, FTIR, XPS, and MIP) revealed that the main hydration products of SS were C-S-H gel and C4AH13, which transformed to ettringite with DG addition. The carbonation products were mainly calcite and aragonite. Additionally, the amount of aragonite, mechanically weaker than calcite, decreased and calcite increased significantly when DG was added in carbonation-curing samples, providing a denser structure and higher strength than those without DG. Furthermore, high Al 2p binding energies revealed the formation of monocarboaluminate in the DG-added carbonation samples, corresponding to higher CO2 uptake. This study provides guidance for the preparation of SS-DG carbide building materials.
3 August 2024 in Construction and Building Materials
This study evaluated the properties and processing of cemented paste backfills (CPBs) for potash mining through loop tests. The CPBs were made with steel slags as the binder, granulated potash tailings as the aggregate, and waste brine water as the liquid phase. The effects of solid concentration and steel slag dosage on the transport and mechanical properties of CPBs were assessed. The loop test demonstrated that all CPB slurries performed well, exhibiting strong long-distance pipeline transport capabilities. The 28-day compressive strength of the backfills exceeded 1 MPa, meeting the design requirements for backfill strength. The key rheological parameters, including yield stress (τ0) and viscosity coefficient (η), were comprehensively and theoretically analyzed based on the variations in pressure loss per unit distance of the filling slurry measured during the loop test. The empirical formulas for CPB pressure loss, accounting for varying flow rates and pipeline diameters, were derived with an error margin under 2%. The response surface analysis showed that the affecting extents of factors on pressure loss in CPB slurry were ranked as follows: solid concentration > cementing agent content > flow rate. This study offered valuable guidance for the processing of potash mine backfill operations.
Utilizing potassium salt aggregates and waste brine to produce underground cemented filling materials can address the waste storage issue. However, it is essential for the backfill materials to meet specific transport characteristics. This paper examines the transportation characteristics of lime-cemented mine backfill for a potash mine. The parameters were optimized for the cemented backfill process of potash mines through loop experiments and model simulations. Results indicate that the slump and fluidity of the backfill slurry diminished with increasing lime content and solid concentration. Additionally, the growth rate of pressure loss at the bent pipe and the pressure loss per unit distance in a horizontal pipe increased rapidly over transportation time, indicating a decline in the flowability of the backfill slurry. The lime dosage and solid concentration must align with the backfill requirements. When the lime dosage is 0.5%, the solid content is 70–75%; conversely, with a lime dosage of 0.7% and solid content of 65%, the maximum pumpable time extends to 1 h. The compressive strength of the cured backfill material after 28 days exceeds 1.01 MPa, meeting the transportation requirements for 300 m vertical pipes and 5000 m horizontal pipes. In the case study, the actual flow rate of backfill slurry surpasses the calculated critical flow rate. The estimated and measured values of on-site pressure loss per unit distance in a horizontal pipe exhibit a strong correlation. As the pressure loss per unit distance in a horizontal pipe rises, the discrepancy between the calculated and measured values also increases. When the solid content exceeds 65%, the loop test slightly enhances the compressive strength of the lime-cemented backfill. The findings from this article can aid in determining the on-site backfill process parameters with lime as a binder.