Dorel Ramos

Dr. Dorel Ramos

orcid

Research Focus & Metrics

Academic Career Length

15Years (2012-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 January 2022 in Energy
Verified
Journal Article
Open access
Julian D HuntJulian D Hunt
Julian D Hunt
ANAndreas Nascimento
Andreas Nascimento
CCCarla Schwengber Ten Caten
Carla Schwengber Ten Caten
FTFernanda Munari Caputo Tomé
Fernanda Munari Caputo Tomé
PSPaulo Smith Schneider
Paulo Smith Schneider
RSRodrigo Senne
Rodrigo Senne

17 October 2020 in Energy Efficiency
Verified
Journal Article
Open access
PDF file
Julian D HuntJulian D Hunt
Julian D Hunt
BZBehnam Zakeri
Behnam Zakeri
ANAndreas Nascimento
Andreas Nascimento
BGBruno Garnier
Bruno Garnier
Marcio PereiraMarcio Pereira
Marcio Pereira
DRDorel Ramos
Dorel Ramos
The rapid increase in cooling demand for air-conditioning worldwide brings the need for more efficient cooling solutions based on renewable energy. Seawater air-conditioning (SWAC) can provide base-load cooling services in coastal areas utilizing deep cold seawater. This technology is suggested for inter-tropical regions where demand for cooling is high throughout the year, and it has been implemented in islands with short distances from the coast and the deep sea. This paper proposes adjustments to the conventional design of SWAC plants to reduce implementation risks and costs. The approach is named high velocity SWAC and consists of increasing the excavation depth of the seawater pump station up to 20 m below the sea level, compared to 2 to 5 m in conventional SWAC projects. This allows a twofold increase in the speed of inlet pipeline seawater and cooling load of the plant. The cooling load can be expanded twofold with only 55% capital cost and 83% project costs, compared with the costs of a new system. In addition, this article shows that high velocity SWAC plants with thermal energy storage will have an important role supporting the dissemination of intermittent renewable sources of energy in regions where SWAC is a viable cooling alternative.

9 January 2025 in Case Studies on Transport Policy
Verified
Journal Article
Closed access
RARafael Herrero Alonso
Rafael Herrero Alonso
UCUbiratan Francisco Castellano
Ubiratan Francisco Castellano
DTDavid Tsai
David Tsai
IGIngrid Graces
Ingrid Graces
DRDorel Ramos
Dorel Ramos

1 January 2021 in Production
Verified
Journal Article
Open access
MPMargareth de Cássia Oliveira Pavan
Margareth de Cássia Oliveira Pavan
DRDorel Ramos
Dorel Ramos
MSMunir Yones Soares
Munir Yones Soares
CBClara Barufi
Clara Barufi
MCMarly Carvalho
Marly Carvalho

13 June 2022 in Energies
Verified
Journal Article
Open access
PDF file
LJLuiz Moreira Coelho Junior
Luiz Moreira Coelho Junior
AFAmadeu Junior da Silva Fonseca
Amadeu Junior da Silva Fonseca
RCRoberto Castro
Roberto Castro
JMJoao Carlos Oliveira Mello
Joao Carlos Oliveira Mello
VSVictor Hugo Ribeiro dos Santos
Victor Hugo Ribeiro dos Santos
DRDorel Ramos
Dorel Ramos
This article analyzed the cost of capital under risk conditions for thermoelectric plants in Brazil, applying the Capital Asset Pricing Model—CAPM and the Weighted Average Capital Cost—WACC. To estimate the local CAPM, we used information from the Electric Energy Index—IEE of publicly traded companies in the electricity sector in Brazil and for the global CAPM, we observed the companies associated with the Edison Electric Institute—EEI, listed on the New York Stock Exchange—NYSE and at the National Association of Securities Dealers Automated Quotations—NASDAQ—USA. The risk conditions for capital costs were represented by Monte Carlo simulation using, as a basis, the WACC of a fuel oil thermoelectric plant and the local and global CAPM. The main results show that the IEE and EEI companies obtained a positive average daily return. Due to the Brazil risk, under deterministic conditions, the local WACC (11.13% p.a.) was more attractive to investors when compared to the global WACC (10.32% p.a.) and the regulatory WACC of 10.55% p.a., established by the National Electric Energy Agency—ANEEL. The most risk-sensitive input variables were: unleveraged beta, net debt and equity. Under risk conditions observed by the market from the point of view of Brazilian companies, the chances of the WACC of the fuel oil thermoelectric plant being 11.1% p.a. was 68.30% and from a global perspective, the chance of WACC being 10.32% p.a. was 99.51%. It is concluded that the cost of capital under risk conditions provides a more realistic view of decision-making for privately held companies.

20 November 2023 in Energies
Verified
Journal Article
Open access
PDF file
MVMatheus Sabino Viana
Matheus Sabino Viana
DRDorel Ramos
Dorel Ramos
GJGiovanni Manassero Junior
Giovanni Manassero Junior
MUMIGUEL EDGAR UDAETA
MIGUEL EDGAR UDAETA
The increasing penetration of Distributed Energy Resources (DERs) in Distribution Systems (DSs) has motivated studies on Virtual Power Plants (VPPs). However, few studies have jointly assessed the sizing and economic attractiveness of VPPs from the entrepreneur’s perspective and the potential benefits and impacts on power systems while maintaining the scope to DSs. This study proposes a methodology for sizing VPPs and simulating their economic optimal dispatch and economic attractiveness with a focus on the entrepreneur’s viewpoint. In addition, it also evaluates VPPs’ potential benefits and impacts on a DS or Transmission System (TS) while considering the interface between the Distribution System Operator (DSO) and the Transmission System Operator (TSO). The methodology employs optimization to minimize the Net Present Cost (NPC) of the project, in relation to sizing the DERs, and to obtain the economic optimal dispatch of the BESSs that comprise the VPP. Moreover, a power flow analysis and probabilistic reliability assessment are used to evaluate the benefits and impacts on the power system. The methodology was applied to a case study involving Photovoltaic (PV) systems and Battery Energy Storage Systems (BESSs) used by aggregated medium voltage consumers, which configure Technical Virtual Power Plants (TVPPs) participating in Demand Response (DR) via incentives, with a network model of the Brazilian National Interconnected System (SIN) adapted from the 2030 Ten-Year Energy Expansion Plan (PDE) of the Energy Research Office (EPE), along with data from the Geographic Database of the Distribution Utility (BDGD). The results indicate the economic attractiveness of DERs according to the premises adopted and indicate improvements in TS reliability indexes with the possibility of TVPPs’ dispatch after transmission contingencies.