Edgar Ubaldo Pena Sanchez

Dr. Edgar Ubaldo Pena Sanchez

orcid

Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 March 2025 in International Journal of Hydrogen Energy
Verified
Journal Article
Open access
CWC. Winkler
C. Winkler
HHH. Heinrichs
H. Heinrichs
SIS. Ishmam
S. Ishmam
BBB. Bayat
B. Bayat
ALA. Lahnaoui
A. Lahnaoui
DSD. Stolten
D. Stolten

14 September 2021 in Energies
Verified
Journal Article
Open access
PDF file
ESEdgar Ubaldo Pena Sanchez
Edgar Ubaldo Pena Sanchez
SRSeverin Ryberg
Severin Ryberg
HHHeidi Ursula Heinrichs
Heidi Ursula Heinrichs
Detlef StoltenDetlef Stolten
Detlef Stolten
MRMartin Robinius
Martin Robinius
Due to the increasing global importance of decarbonizing human activities, especially the production of electricity, the optimal deployment of renewable energy technologies will play a crucial role in future energy systems. To accomplish this, particular attention must be accorded to the geospatial and temporal distribution of variable renewable energy sources (VRES), such as wind and solar radiation, in order to match electricity supply and demand. This study presents a techno-economical assessment of four energy technologies in the hypothetical context of Mexico in 2050, namely: onshore and offshore wind turbines and open-field and rooftop photovoltaics. A land eligibility analysis incorporating physical, environmental, and sociopolitical eligibility constraints and individual turbine and photovoltaic park simulations, drawing on 39 years of climate data, is performed for individual sites across the country in an effort to determine the installable potential and the associated levelized costs of electricity. The results reveal that up to 54 PWh of renewable electricity can be produced at a levelized cost of electricity of less than 70 EUR·MWh−1. Around 91% (49 PWh) of this electricity would originate from 23 TW of open-field photovoltaic parks that could occupy up to 578,000 km2 of eligible land across the country. The remaining 9% (4.8 PWh) could be produced by 1.9 TW of onshore wind installations allocated to approximately 68,500 km2 of eligible land that is almost fully adjacent to three mountainous zones. The combination of rooftop photovoltaic and offshore wind turbines accounts for a very small share of less than 0.03% of the overall techno-economical potential.

9 July 2021 in Preprints.org
Verified
Preprint
Open access
ESEdgar Ubaldo Pena Sanchez
Edgar Ubaldo Pena Sanchez
SRSeverin Ryberg
Severin Ryberg
HHHeidi Ursula Heinrichs
Heidi Ursula Heinrichs
DSDetlef Stolten
Detlef Stolten
MRMartin Robinius
Martin Robinius
Due to the increasing global importance of decarbonizing human activities, especially the production of electricity, the optimal deployment of renewable energy technologies will play a crucial role in future energy systems. To accomplish this, particular attention must be accorded to the geospatial and temporal distribution of variable renewable energy sources (VRES) such as wind and solar radiation in order to match electricity supply and demand. This study presents a techno-economical assessment of four energy technologies in the hypothetical context of Mexico in 2050, namely: onshore and offshore wind turbines, and open-field and rooftop photovoltaics. A land eligibility analysis incorporating physical, environmental, and socio-political eligibility constraints and individual turbine and photovoltaic park simulations, drawing on 39 years of climate data, is performed for individual sites across the country in an effort to determine the installable potential and the associated levelized costs of electricity. The results reveal that up to 54 PWh of renewable electricity can be produced as a cost of less than 70 EUR/MWh. Around 91% (49 PWh) of this would originate from 23 TW of open-field photovoltaic parks that could occupy up to 578,000 km2 of eligible land across the country. The remaining 9% (4.8 PWh) could be produced by 1.9 TW of onshore wind installations allocated to approximately 68,500 km2 of eligible land that is almost fully adjacent to three mountainous zones. The combination of rooftop photovoltaic and offshore wind turbines account for a very small share of less than 0.03% of the overall techno-economical potential.