towhid pourrostam

Dr. towhid pourrostam


Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
20 September 2021 in Infrastructures
Verified
Journal Article
Open access
PDF file
RGReza Mohajeri Borje Ghaleh
Reza Mohajeri Borje Ghaleh
TPtowhid pourrostam
towhid pourrostam
NSNaser Mansour Sharifloo
Naser Mansour Sharifloo
JSJavad Majrouhi Sardroud
Javad Majrouhi Sardroud
ESEbrahim Safa
Ebrahim Safa
Delays in the execution stage of road construction projects are one of the significant challenges. The incapability of finishing projects according to schedule has attracted many researchers’ attention to this issue. This study has been formed to investigate delays in road construction projects from a risk management perspective. In this study, risks have been identified by structured interviews with experts. Qualitative risk analysis by a survey of experts and quantitative risk analysis by analytical hierarchy process (AHP) technique have been performed. Research results show that financial and credit problems, lands’ funding, management problems, technical problems, and natural disasters have the highest risk among the main criteria. Among the subcriteria of the risk, incomplete funding with a weight of 0.188, gardens and land price with 0.114 are the most critical risk, and ground operations with 0.017, asphalt problems with 0.009, and accident insurance with a weight of 0.006 are the least essential risk. In the following, critical criteria analysis has been performed, and solutions to reduce or eliminate these delays in road construction projects are presented.

15 November 2022 in Iranian Journal of Science and Technology, Transactions of Civil Engineering
Verified
Journal Article
Closed access
PDF file
EMElham Moballeghi
Elham Moballeghi
TPtowhid pourrostam
towhid pourrostam
HAHamidreza Abbasianjahromi
Hamidreza Abbasianjahromi
PMPayam Makvandi
Payam Makvandi

21 September 2024 in Heliyon
Verified
Journal Article
Open access
ATAmir Mohammad Maleki Toulabi
Amir Mohammad Maleki Toulabi
TPtowhid pourrostam
towhid pourrostam
BABabak Aminnejad
Babak Aminnejad
Construction operation is among the most high-risk sectors in terms of work-related accident, making it highly challenging to surveil the safety of such projects. In construction projects, failure to observe safety represents a leading cause of fatal accidents, not to mention the losses incurred by such accidents to national assets of the country. Accordingly, recent decades have witnessed the emergence of modern techniques for improving the occupational safety of construction projects. The main purpose of the present research is to identify and classify different preventable risk mitigation factors in mass housing projects following a building information modeling (BIM) approach. The research methodology included interviews with relevant experts and elites followed by analysis of the data on the 12 identified-as-significant variables for mitigating the preventable risk factors in mass house construction projects by means of the inferential – structural modeling (ISM) in MICMAC software. In order to explore the relationships among and succession of different criteria and further classify them at different levels, ISM was implemented, with the MICMAC software used to analyze the direct and indirect influences, develop influence/dependence maps, and judge about the role of each criterion. Findings of the present research showed that the mutual relations (H3), the reward system (H6), the reporting system (H7), and the supervisors' supervision (H8) are autonomous variables and hence impose the smallest contributions to the system. Accordingly, they can be eliminated from the model though their effects may not be completely ignored. On the other hand, the employees’ empowering (H4), the safety management system (H5), the teamwork (H9), the self-efficiency (H10), and the knowledge and awareness (H11) were identified as the linkage variables that fill in the gap between the safety and occupational accident reduction in the mass house construction projects. Further, the continuous improvement (H2) and the safe behavior (H12) were identified as dependent variables, implying that they exhibit the weakest influence coupled with highest dependence on any change in the conditions of the system. Last but not the least, the management commitment (H1) was identified as the only dependent variable which deserves lots of attention. This information can be helpful to safety decision-makers, end users, research organizations, and academic institutes who work to reduce the preventable risk factors in mass house construction projects.

3 December 2022 in Asian Journal of Civil Engineering
Verified
Journal Article
Closed access
PDF file
AKArash Gorgin Karaji
Arash Gorgin Karaji
TPtowhid pourrostam
towhid pourrostam
HAHamidreza Abbasianjahromi
Hamidreza Abbasianjahromi
SNSoheil Monajemi nejad
Soheil Monajemi nejad