Bartosz Wachnik

Dr. Bartosz Wachnik

orcid

Research Focus & Metrics

Academic Career Length

12Years (2015-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
12 February 2022 in Production Engineering Archives
Verified
Journal Article
Open access
PDF file
BWBartosz Wachnik
Bartosz Wachnik
Artificial Intelligence (AI) supports project management in industry projects increasingly more often. The article documents research results regarding the use of AI in Industry 4.0 projects. The aim of the article is to define the range of AI use in Industry 4.0 projects throughout their entire life cycle and to indentify the main stages of AI development in project management. Additionally, the article indicates the main barriers to AI use in project management identified in the studied projects. In order to identify and systemise the range of AI use, the Conceptual Framework of Using AI in Project Management presented in literature is applied. Research results indicate that we are in the early stages of AI use in projects. The studied projects use AI mainly in project administration, i.e. to complete the following tasks: simple automation of routine activities, support, and, to a very limited extent, in the area of project management, i.e. in identifying anomalies and predicting the phenomena where the anomalies will occur. The research uses the case study method, where four projects were studied: an ERP system upgrade, an implementation of an IT system supporting high-bay warehouse management, an implementation of an IoT as a data-collection sensor platform and an E-learning platform implementation. The study was conducted between 2019 and 2021, and covered the entire project life cycle, including its three stages, i.e. preparation, implementation and operation.

2 February 2022 in Energies
Verified
Journal Article
Open access
PDF file
BWBartosz Wachnik
Bartosz Wachnik
Michał KłodawskiMichał Kłodawski
Michał Kłodawski
EKEwa Kardas-Cinal
Ewa Kardas-Cinal
Reducing energy consumption should be treated as crucial for contemporary information and communication technology (ICT) projects under conditions of Industry 4.0. This research proposes a wider look at the factors influencing the success of ICT industry projects, considering not only technological and procedural conditions or implementation methods but also information and competency resources, thus allowing for correct decisions to be taken during project implementation. The article analyzes the information gap in Industry 4.0 projects completed in enterprises based in Poland, following the concept of sustainable development and minimization of energy consumption. The research was completed between 2018 and 2021 in medium enterprises, and the result is a qualitative characteristic of the information gap in ICT projects from the client’s perspective. The research can help develop a complete methodology for Industry 4.0 ICT projects to limit the level of uncertainty and risk while reducing energy consumption.


7 December 2021 in Energies
Verified
Journal Article
Open access
PDF file
BWBartosz Wachnik
Bartosz Wachnik
ZCZbigniew Chyba
Zbigniew Chyba
Nowadays photovoltaic trade in Poland is growing rapidly due to contemporary challenges in sustainable energy. The first Polish photovoltaic firms were established in the second decade of XXI century. It was the answer of looking for new innovative energy sources including solar energy. It was necessary to change the structure of energy sources in Poland mainly based on carbon and oil & gas. The aim of this article was the identification and assessment the key opportunities and barriers to photovoltaic industry enterprises in Poland in the context of technology entrepreneurship under conditions of information asymmetry. The paper was prepared based on the results of qualitative research using the case study method. A comparative analysis was performed based on results of a study of four purposefully selected enterprises. All of them are SMEs. The research was done in 2021. The case study method allowed for comparing the analysed enterprises in pairs, which is discussed more extensively further on in the text. The research performed will lead to conclusions and recommendations for the photovoltaic sector enterprises in Poland which will allow them to act more effectively and efficiently in conditions of competing on the global market. This paper contains the characteristics of photovoltaic trade in Poland, its macro and micro environment, the opportunities and threats of this trade and key strengths and weaknesses of characterized photovoltaic enterprises in Poland. Finally, the conclusion and recommendations of discussed Polish photovoltaic trade firms in future are evaluated.

31 March 2021 in Przegląd Organizacji
Verified
Journal Article
Closed access
PDF file
BWBartosz Wachnik
Bartosz Wachnik
EGEryk Głodziński
Eryk Głodziński
Zgodnie z teorią luki informacyjnej, jej występowanie u interesariuszy wewnętrznych może determinować w istotnym zakresie ryzyko oraz niepewność w podejmowaniu decyzji w projektach IT. Według badań, istotnym czynnikiem mającym wpływ na sukces przedsięwzięcia informatycznego może być zjawisko luki informacyjnej występującej u wybranych członków grupy projektowej dostawcy. W artykule opisano komponenty informacyjne, których znajomość może wspomagać kierownika projektu wdrożeniowego IT ze strony integratora w redukcji luki informacyjnej. W badaniach zidentyfikowano 38 różnych komponentów, które pogrupowano w ramach cyklu życia projektu. Wyodrębnione komponenty wspomagające kierownika projektu integratora porównano ze zdefiniowanymi w literaturze przedmiotu komponentami wspierającymi kierownika projektu ze strony klienta.