Arunava Majumder

Dr. Arunava Majumder

orcid

Research Focus & Metrics

Academic Career Length

10Years (2017-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 September 2021 in Mathematics and Computers in Simulation
Verified
Journal Article
Closed access
AHAbubakar Sani Halilu
Abubakar Sani Halilu
AMArunava Majumder
Arunava Majumder
MWMohammed Yusuf Waziri
Mohammed Yusuf Waziri
KAKabiru Ahmed
Kabiru Ahmed

1 January 2017 in Journal of Industrial and Management Optimization
Verified
Journal Article
Open access
PDF file
Biswajit SarkarBiswajit Sarkar
Biswajit Sarkar
AMArunava Majumder
Arunava Majumder
MSMitali Sarkar
Mitali Sarkar
Bikash Koli DeyBikash Koli Dey
Bikash Koli Dey
GRGargi Roy
Gargi Roy
For quality improvement purposes often times, a manufacturing unit has to change certain parts of equipment. Any such changes in the assembly line manufacturing system or production process involves a cost known as the setup cost. Minimizing the setup cost and improving the product quality is of prime importance in today's competitive business arena. This paper develops the effects of setup cost reduction and quality improvement in a two-echelon supply chain model with deterioration. The objective is to minimize the total cost of the entire supply chain model (SCM) by simultaneously optimizing setup cost, process quality, number of deliveries, and lot size. Numerical examples are provided to illustrate the model.

5 January 2021 in International Journal of Fuzzy Systems
Verified
Journal Article
Closed access
PDF file
RKRakesh Kumar
Rakesh Kumar
RCRajesh Kumar Chandrawat
Rajesh Kumar Chandrawat
Biswajit SarkarBiswajit Sarkar
Biswajit Sarkar
VJVarun Joshi
Varun Joshi
AMArunava Majumder
Arunava Majumder

8 September 2021 in Computational and Applied Mathematics
Verified
Journal Article
Closed access
PDF file
ASAbubakar Sani sani
Abubakar Sani sani
AMArunava Majumder
Arunava Majumder
MWMohammed Yusuf Waziri
Mohammed Yusuf Waziri
AAAliyu Muhammed Awwal
Aliyu Muhammed Awwal
KAKabiru Ahmed
Kabiru Ahmed

2 August 2023 in Journal of Retailing and Consumer Services
Verified
Journal Article
Closed access
RCRuchi Chauhan
Ruchi Chauhan
AMArunava Majumder
Arunava Majumder
VKVarun Kumar
Varun Kumar

12 April 2024 in Processes
Verified
Journal Article
Open access
PDF file
GKGurpreet Kaur
Gurpreet Kaur
Bikash Koli DeyBikash Koli Dey
Bikash Koli Dey
PPPankaj Pandey
Pankaj Pandey
AMArunava Majumder
Arunava Majumder
SGSachin Gupta
Sachin Gupta
Most textile manufacturing companies in the world heavily rely on manual labor, particularly in the fabric inspection section, especially for cotton fabric. Establishing smart manufacturing systems like industrial automation in the textile industry for cotton fabric inspection is important for error-free inspection. The proposed make-to-order (MTO) inventory model focuses on the strategic development of a supply chain network under fuzzy uncertainty. The distinctiveness of this research lies in integrating a methodology that involves human and machine interaction, along with allocating resources to investment in smart manufacturing. This article presents a case study of the Jagatjit Cotton Textiles (JCT) manufacturing company in Punjab, India, as an example to validate the model and check the performance of SMT in the fabric inspection process in cotton TC mills. This paper contributes by developing four distinct textile supply chain models with industrial automation under triangular and trapezoidal fuzzy demand. A numerical analysis is conducted to verify the effectiveness of installing automated fabric inspection machines in the cotton plant. This article proposes an iterative solution algorithm (KDPMG) to obtain the global optimum for the proposed model. A comparative study of the proposed algorithm, KDPMG, and the genetic algorithm (GA) is presented in this study to verify the credibility of the obtained results. It is observed that KDPMG provides more appropriate solutions to the problem compared to the GA. Moreover, the computational time of KDPMG is significantly less than that of the GA. The rigorous analysis reveals that maximum profit can be achieved under trapezoidal fuzzy demand with fully automated fabric inspection technology. Using a triangular fuzzy demand pattern, the model with fully automated smart manufacturing achieves an 8.62% higher profit compared to a traditional system. Similarly, in the case of a trapezoidal fuzzy demand pattern, the adoption of automation in cotton plants can achieve an 8.69% higher profit. Hence, the implementation of smart manufacturing systems in the mending section of the cotton textile industry proves to be more profitable compared to the traditional inspection process.