A novel optimization strategy is proposed to achieve a reliable hybrid plant of wind, solar, and battery (HWSPS). This strategy’s purpose is to reduce the power losses in a wind farm and at the same time reduce the fluctuations in the output of HWSPS generation. In addition, the proposed strategy is different from previous studies in that it does not involve a load demand profile. The process of defining the HWSPS capacity is carried out in two main stages. In the first stage, an optimal wind farm is determined using the genetic algorithm subject to site dimensions and spacing between the turbines, taking Jensen’s wake effect model into consideration to eliminate the power losses due to the wind turbines’ layout. In the second stage, a numerical iterative algorithm is deployed to get the optimal combination of photovoltaic and energy storage system sizes in the search space based on the wind reference power generated by the moving average. The reliability indices and cost are the basis for obtaining the optimal combination of photovoltaic and energy storage system according to a contribution factor with 100 different configurations. A case study in Thumrait in the Sultanate of Oman is used to verify the usefulness of the proposed optimal sizing approach.
Wind farm layout optimisation (WFLO) is carried out in this study considering the wake effect, and cabling connections and losses. The wind farm micro‐siting optimisation problem is formulated with the aid of Jensen's wake model. Cabling between the wind turbines and the point of common coupling is an important aspect of the wind farm design as it affects the capital investment as well as income over the lifetime of the wind farm. The cabling layout must satisfy the connection of the wind turbines to the point of common coupling in such a way that the total cable length is reduced while reliability is maintained. Introducing the cabling layout optimisation to the WFLO, further complicates the optimisation problem. An integrated tool is developed to optimise the wind farm layout and cabling simultaneously. The main contribution of this work is the development of an integrated tool that maximizes the energy production of the wind farm via optimal allocation of wind turbines with optimal cable routing. This tool considers the capital cost of wind turbines and cabling, wind farm power production, and power losses in the cabling over the lifetime of the wind farm. The proposed co‐optimisation problem is solved using genetic algorithm. The decision variables are the wind farm layout, cable paths and sizes, and the location of the point of common coupling within the land perimeter. A case study incorporating a multi‐speed and multi‐direction wind profile is carried out to demonstrate the applicability of the proposed approach. Moreover, the proposed methodology is compared to the separate optimisation method where the WFLO and cabling optimisation are solved sequentially with two separate steps. It is shown that the co‐optimisation method is superior in terms of cable power losses, overall wind farm cost, and compactness (land use).
Harnessing wind energy is one of the fastest-growing areas in the energy industry. However, wind power still faces challenges, such as output intermittency due to its nature and output reduction as a result of the wake effect. Moreover, the current practice uses the available renewable energy resources as a fuel-saver simply to reduce fossil-fuel consumption. This is related mainly to the inherently variable and non-dispatchable nature of renewable energy resources, which poses a threat to power system reliability and requires utilities to maintain power-balancing reserves to match the supply from renewable energy resources with the real-time demand levels. Thus, further efforts are needed to mitigate the risk that comes with integrating renewable resources into the electricity grid. Hence, an integrated strategy is being created to determine the optimal size of the hybrid wind-solar photovoltaic power systems (HWSPS) using heuristic optimization with a numerical iterative algorithm such that the output fluctuation is minimized. The research focuses on sizing the HWSPS to reduce the impact of renewable energy resource intermittency and generate the maximum output power to the grid at a constant level periodically based on the availability of the renewable energy resources. The process of determining HWSPS capacity is divided into two major steps. A genetic algorithm is used in the initial stage to identify the optimum wind farm. A numerical iterative algorithm is used in the second stage to determine the optimal combination of photovoltaic plant and battery sizes in the search space, based on the reference wind power generated by the moving average, Savitzky–Golay, Gaussian and locally weighted linear regression techniques. The proposed approach has been tested on an existing wind power project site in the southern part of the Sultanate of Oman using a real weather data. The considered land area dimensions are 2 × 2 km. The integrated tool resulted in 39 MW of wind farm, 5.305 MW of PV system, and 0.5219 MWh of BESS. Accordingly, the estimated cost of energy based on the HWSPS is 0.0165 EUR/kWh.