28 February 2025 in Sustainability
Verified
Journal Article
Open access
PDF file
SDSizi Dong
Sizi Dong
MAMukhtar Ahmed
Mukhtar Ahmed
VCVuttichai Chatpattananan
Vuttichai Chatpattananan
Cost overruns are prevalent in global construction industries, propelled by the swift expansion of the construction sector. To tackle this difficulty, it is essential to comprehend the primary elements leading to these overruns. This research examines the correlation between systematic elements affecting construction costs via a literature review, expert interviews, exploratory factor analysis (EFA), and structural equation modeling (SEM). A theoretical framework analyzes contract management, resource distribution, and external environmental factors affecting cost overruns. Twenty-four criteria were selected via literature review and expert consultation, and data from 212 questionnaires were analyzed. The results identify 22 critical elements classified into project management, resources, supply chain, and external and environmental influences. Project management and resources, together with supply chain, exerted the most significant influence. SEM study indicates that management inadequacies intensify resource problems, whereas proficient internal management alleviates external difficulties. This research offers practical recommendations for mitigating budget excesses and enhancing project cost-effectiveness.

21 November 2023 in Applied Sciences
Verified
Journal Article
Open access
PDF file
Yossakorn ChonratanaYossakorn Chonratana
Yossakorn Chonratana
VCVuttichai Chatpattananan
Vuttichai Chatpattananan
In this paper, a suitable damage index is demonstrated to assess the seismic-resistant design of masonry wall buildings reinforced with double x-bracing concrete frames. As a criterion indicative of the damage level that might occur after an earthquake, the damage index can be calculated by using analytic results, by using the Park–Ang formula on masonry wall buildings reinforced with concrete structures, and by adjusting the index values in accordance with the results of the analysed models. The data used in this study are collected from the results of four-storey concrete structures with masonry walls under cyclical lateral forces. To simulate the masonry walls’ structural behaviours for damage assessment, x-bracings placed as crosses on each bracing are used to support the compressive strength. Then, the analysis results are used to assess the damage that occurs to the masonry wall building structure by considering deformation and energy decay; additionally, a suitable damage index is calculated for each damage level. The damage index can be considered in the seismic-resistant design of masonry walls reinforced with x-bracing concrete frames.

27 May 2026 in Buildings
Verified
Journal Article
Open access
PDF file
SLSophon Lithanarung
Sophon Lithanarung
LLLaemthong Laokhongthavorn
Laemthong Laokhongthavorn
MAMukhtar Ahmed
Mukhtar Ahmed
VCVuttichai Chatpattananan
Vuttichai Chatpattananan
Construction projects continue to experience persistent schedule delays that adversely affect cost efficiency, quality, productivity, and stakeholder satisfaction. Although prior studies have extensively examined the causes of delays, limited empirical evidence explains how integrated managerial success conditions proactively improve delay mitigation capability. This study investigates the structural relationships among Key Success Factors (KSF), Project Readiness (PR), and Delay Mitigation (DM) in construction projects. The analysis primarily focuses on delay mitigation during the construction execution phase, where managerial capability and project readiness directly influence schedule performance and disruption response. A quantitative research design was employed using questionnaire data collected from 308 construction professionals in Thailand. KSF was conceptualized as a higher-order construct reflected by Project Execution Capability, Managerial and Digital Support, and Supply Chain Capability. Data was analyzed using Exploratory Factor Analysis, Confirmatory Factor Analysis, and Structural Equation Modeling. The findings indicate that KSF significantly enhances both Project Readiness and Delay Mitigation, while Project Readiness positively contributes to delay mitigation performance and partially mediates the relationship between managerial capability and project delay mitigation outcomes. The study provides an integrated capability-based framework and practical guidance for improving project delivery performance in uncertain construction environments.

15 April 2026 in Sustainability
Verified
Journal Article
Open access
PDF file
MAMukhtar Ahmed
Mukhtar Ahmed
VCVuttichai Chatpattananan
Vuttichai Chatpattananan
In response to increasing demand for environmental sustainability, construction firms are progressively adopting green-oriented management approaches to enhance long-term project success. This study examines the relationship between Green Human Resource Management (GHRM), Green Human Capital (GHC) and Sustainable Project Success (SPS) within the construction sector, with Green Work Climate (GWC) as moderator and Green Construction Practices (GCP) as mediator. Drawing upon the Resource-Based View (RBV), Natural Resource-Based View (NRBV), and Ability-Motivation-Opportunity (AMO) theory, the study explains how green human competencies and HR systems are associated with project sustainability. Data were collected from 436 construction professionals in Bangkok, Thailand, through online questionnaires, and analyzed using SmartPLS 4 and Structural Equation Modeling (SEM) analysis. The findings indicate that GHRM is positively associated with SPS, while GHC demonstrates an indirect relationship with SPS through GCP. The moderating effect of GHC was not supported. These results contribute to sustainable construction management literature by clarifying the mechanisms through which green human resources are converted to sustainability, offering practical implications for construction firms seeking to institutionalize sustainability through structured HR policies and operational practices.

5 August 2021 in Preprints.org
Verified
Preprint
Open access
PDF file
Yossakorn ChonratanaYossakorn Chonratana
Yossakorn Chonratana
VCVuttichai Chatpattananan
Vuttichai Chatpattananan
Sustainability is very important in business. The residential high-rise building all firms wanted to successful and sustainability in business. There is need the construction to completed low time, low cost and high quality in construction work. Therefore, real estate developers must find various strategies to use in construction projects to achieve goals and success of the firm. The purpose of this study was to indicate the very importance of knowledge management can lead to sustainability in business. Analyze 14 critical success to sustainability in residential high-rise building projects, collected questions from literature review, and survey in deep interview senior managers of 15 projects real estate development firms listed on the stock market of Thailand. Budget building more than 1000 million baht per project. From conceptual frame work five foundations integrated to knowledge management of critical success (KMITL PROCESS) used made tool survey in deep interview the critical success to sustainability in residential high-rise building project from project managers. Used IBM SPSS evaluated the critical success to sustainability. Found was one very important of critical success to sustainability, which was quality of products x̄ = 4.83. All 14 critical success to sustainability was found can applied made the knowledge management of critical success to sustainability in residential high-rise building project in firm. Especially in the field of construction managements project can used improve of all construction projects.