Stay cable is the major load-carrying element in cable-stayed bridges. The process of monitoring cable forces would be beneficial to ensure the safety of bridges. The conventional sensor-based approaches to measure stay cable forces is complicated in operation, time-consuming and relatively expensive. In order to confront these disadvantages, a lightweight measurement method using smartphone imagery was proposed in this paper. The video data acquisition process was first standardized by using a pre-designed target. Then, a novel algorithm to extract the vibration displacement of stay cables under complex condition was developed. An automatic correction algorithm was provided to further improve the displacement results. On top of that, a smartphone-based software for determining cable forces was developed and tested on a real-life bridge. The results showed a maximum error of 1.99% compared with the cable force obtained by using a dynamic tester. The developed software is proven to be feasible in real-life projects and can achieve high accuracy in cable force determination. At the same time, the proposed method does not require a fixed camera for measurement and is not limited by personnel experience and measurement time, facilitating real-time monitoring of multiple projects, multiple cable surfaces and multiple personnel in a visual vibration environment.
Particle size exerts a significant influence on the mechanical behavior of soil. However, insufficient research has been carried out on red clay formations, which are widespread in some Chinese provinces. Here, using unconfined compressive strength (UCS) tests, wetting–drying (WD) tests, and low-temperature nitrogen adsorption tests, we examined the relationship between the particle size and a number of mechanical and microstructural characteristics of a red clay outcropping at a construction site in China. Our results suggest that, depending on the surface area, porosity, particle size, and dry density, the failure mechanism in UCS tests will be different. That is, as the particle size increases, the failure mode of soil changes from split failure into shear failure. In addition, as the dry density increases, the UCS of the soil sample is significantly improved, and its total porosity and fractal dimension decrease. We also evaluated a dependence on particle size and the number of WD cycles on the distribution and size of cracks in WD tests. We conclude by suggesting that particle size, dry density, and WD behavior should all be taken into account in roadbed designs in red clay formations.
The accuracy of instructions for the extraction of large open caissons directly affects the construction quality and safety. This study is focused on developing a smart construction methodology for predicting open caisson excavation instructions. The proposed approach aims to reduce the errors in excavation instructions attributable to the subjective and varying experiences of decision‐makers. The multilabel classification task of predicting the instructions of large open caisson excavation is accomplished through the problem analysis. The study conducted a comparative analysis of a multilayer perceptron model, a classifier chain model, and a multilabel K‐nearest neighbor model (MLKNN) based on Hamming loss and accuracy. The results revealed that MLKNN exhibits significant differences from the other models and is most suitable for predicting open caisson excavation instructions. Furthermore, the traditional MLKNN model was improved by refining the normalization and distance measurement methods for the open caisson scenario. The prediction accuracy of the improved MLKNN model is 89.04% for the excavation instructions and 98.63% for the nonexcavation decisions. The successful prediction of excavation instructions for a large open caisson can compensate for the lack of data mining capability of the existing monitoring system. This can reduce construction risks. Finally, this study discussed the robustness of the improved MLKNN in a real project, highlighting the model’s high accuracy during the midstage of open caisson construction.