Pierre Henneaux

Dr. Pierre Henneaux

École polytechnique de Bruxelles, Université libre de Bruxelles, 1050 Bruxelles, Belgium
orcid

Research Focus & Metrics

Academic Career Length

17Years (2010-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
11 February 2016 in IEEE Transactions on Power Systems
Verified
Journal Article
Open access
JBJanusz Bialek
Janusz Bialek
ECEmanuele Ciapessoni
Emanuele Ciapessoni
DCDiego Cirio
Diego Cirio
ECEduardo Cotilla-Sanchez
Eduardo Cotilla-Sanchez
CDChris Dent
Chris Dent
DWDee Wu
Dee Wu
Cascading failure in electric power systems is a complicated problem for which a variety of models, software tools, and analytical tools have been proposed but are difficult to verify. Benchmarking and validation are necessary to understand how closely a particular modeling method corresponds to reality, what engineering conclusions may be drawn from a particular tool, and what improvements need to be made to the tool in order to reach valid conclusions. The community needs to develop the test cases tailored to cascading that are central to practical benchmarking and validation. In this paper, the IEEE PES working group on cascading failure reviews and synthesizes how benchmarking and validation can be done for cascading failure analysis, summarizes and reviews the cascading test cases that are available to the international community, and makes recommendations for improving the state of the art.

17 June 2015 in IEEE Transactions on Power Systems
Verified
Journal Article
Closed access
Pierre HenneauxPierre Henneaux
Pierre Henneaux
PLPierre-Etienne Labeau
Pierre-Etienne Labeau
JMJean-Claude Maun
Jean-Claude Maun
LHLiisa Haarla
Liisa Haarla
Cascading outages in power systems can lead to major power disruptions and blackouts and involve a large number of different mechanisms. The typical development of a cascading outage can be split in two phases with different dominant cascading mechanisms. As a power system is usually operated in N-1 security, an initiating contingency cannot entail a fast collapse of the grid. However, it can trigger a thermal transient, increasing significantly the likelihood of additional contingencies, in a “slow cascade.” The loss of additional elements can then trigger an electrical instability. This is the origin of the subsequent “fast cascade,” where a rapid succession of events can lead to a major power disruption. Several models of probabilistic simulations exist, but they tend to focus either on the slow cascade or on the fast cascade, according to mechanisms considered, and rarely on both. We propose in this paper a decomposition of the analysis in two levels, able to combine probabilistic simulations for the slow and the fast cascades. These two levels correspond to these two typical phases of a cascading outage. Models are developed for each of these phases. A simplification of the overall methodology is applied to two test systems to illustrate the concept.

16 March 2015 in IEEE Transactions on Power Systems
Verified
Journal Article
Closed access
Pierre HenneauxPierre Henneaux
Pierre Henneaux
DKDaniel S. Kirschen
Daniel S. Kirschen
Optimal transmission switching (OTS) optimizes simultaneously the generation dispatch and the topology of a power system. It has been shown that taking some transmission lines out of service can significantly reduce the operating cost of the system while respecting the traditional deterministic N-1 security criterion of operational reliability. However, topology modifications could adversely affect probabilistic security metrics. The operational reliability of a power system can be translated into a cost by multiplying the expected energy not served by the value of lost load. This paper therefore explores whether it is possible to maintain a positive economic balance with OTS when considering not only the cost of generation but also the expected socio-economic cost of disruptions in the supply. This is done in two steps: the computation of an N-1 secure OTS and then the calculation of a probabilistic estimate of the operational reliability of the OTS solution. Based on the results obtained with two test systems, it is shown that OTS tends to significantly degrade probabilistic measures of security. It is thus not obvious that OTS can lead to a positive economic balance, even when N-1 security is enforced. Consequently, a probabilistic security analysis should be performed before implementing an OTS solution.

4 June 2013 in IEEE Transactions on Power Systems
Verified
Journal Article
Closed access
Pierre HenneauxPierre Henneaux
Pierre Henneaux
PLPierre-Etienne Labeau
Pierre-Etienne Labeau
JMJean-Claude Maun
Jean-Claude Maun
Renewable energy integration and deregulation imply that the electric grid will be operated near its limits in the future, and that the variability of cross-border flows will increase. Therefore, it is becoming more and more crucial to study the impact of these changes on the risk of cascading failures leading to blackout. We propose in this paper to emphasize important factors leading to blackouts, to review methodologies which were developed to simulate cascading failure mechanisms and to study specifically the impact of thermal effects on the risk of blackout for several changes in generation (variations in cross-border flows, wind farms penetration, shut-down of power plants). This is studied by applying to a test system the first level of a dynamic probabilistic blackout risk assessment developed previously. We show that taking into account thermal effects in cascading failures is important not only to have a good estimation of the risk of blackout in different grid configurations, but also to determine if a specific change in generation has a positive or a negative impact on the blackout risk.

1 June 2012 in Reliability Engineering & System Safety
Verified
Journal Article
Closed access
Pierre HenneauxPierre Henneaux
Pierre Henneaux
PLPierre-Etienne Labeau
Pierre-Etienne Labeau
JMJean-Claude Maun
Jean-Claude Maun

1 December 2015 in International Journal of Electrical Power & Energy Systems
Verified
Journal Article
Closed access
Pierre HenneauxPierre Henneaux
Pierre Henneaux