Jinpeng Liu

Dr. Jinpeng Liu


Research Focus & Metrics

Academic Career Length

18Years (2009-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
19 May 2019 in Energies
Verified
Journal Article
Open access
PDF file
TYTao Yi
Tao Yi
XCXiao-bin Cheng
Xiao-bin Cheng
HZHao Zheng
Hao Zheng
JLJinpeng Liu
Jinpeng Liu
The development of electric vehicles has significant value for the sustainable utilization of energy resources. However, the unreasonable construction of charging stations causes problems such as low user satisfaction, waste of land resources, unstable power systems, and so on. Reasonable planning of the location and capacity of charging stations is of great significance to users, investors and power grids. This paper synthetically considers three indicators of user satisfaction: charging convenience, charging cost and charging time. Considering the load and charging requirements, the model of electric vehicle charging station location and volume is established, and the model based on artificial immune algorithm is used to optimize the solution. An empirical analysis was conducted based on a typical regional survey. The research results show that increasing the density of charging stations, lowering the charging price and shortening the charging time can effectively improve user satisfaction. The constructed site and capacity selection optimization solving model can scientifically guide charging station resource allocation under the constraints of the optimal user comprehensive satisfaction target, improve the capacity of scientific planning and resource allocation of regional electric vehicle charging stations, and support the large-scale promotion and application of electric vehicles.

21 July 2017 in Energies
Verified
Journal Article
Open access
PDF file
JLJinpeng Liu
Jinpeng Liu
QYQian-Ru Yang
Qian-Ru Yang
LHLin He
Lin He
Under the background of a new round of power market reform, realizing the goals of energy saving and emission reduction, reducing the coal consumption and ensuring the sustainable development are the key issues for thermal power industry. With the biggest economy and energy consumption scales in the world, China should promote the energy efficiency of thermal power industry to solve these problems. Therefore, from multiple perspectives, the factors influential to the energy efficiency of thermal power industry were identified. Based on the economic, social and environmental factors, a combination model with Data Envelopment Analysis (DEA) and Malmquist index was constructed to evaluate the total-factor energy efficiency (TFEE) in thermal power industry. With the empirical studies from national and provincial levels, the TFEE index can be factorized into the technical efficiency index (TECH), the technical progress index (TPCH), the pure efficiency index (PECH) and the scale efficiency index (SECH). The analysis showed that the TFEE was mainly determined by TECH and PECH. Meanwhile, by panel data regression model, unit coal consumption, talents and government supervision were selected as important indexes to have positive effects on TFEE in thermal power industry. In addition, the negative indexes, such as energy price and installed capacity, were also analyzed to control their undesired effects. Finally, considering the analysis results, measures for improving energy efficiency of thermal power industry were discussed widely, such as strengthening technology research and design (R&D), enforcing pollutant and emission reduction, distributing capital and labor rationally and improving the government supervision. Relative study results and suggestions can provide references for Chinese government and enterprises to enhance the energy efficiency level.

17 December 2018 in Mathematical Problems in Engineering
Verified
Journal Article
Open access
PDF file
TYTao Yi
Tao Yi
HZHao Zheng
Hao Zheng
YTYu Tian
Yu Tian
JLJinpeng Liu
Jinpeng Liu
In order to meet the demand of power supply, the construction of transmission line projects is constantly advancing, and the level of cost control is constantly improving, which puts forward higher requirements for the accuracy of cost prediction. This paper proposes an intelligent cost prediction model based on least squares support vector machine (LSSVM) optimized by particle swarm optimization (PSO). Originally extracting natural, technological, and economic indexes from the perspective of cost composition, principal component analysis (PCA) is used to reduce the dimension of indexes. And PSO is innovatively introduced to optimize the parameters of LSSVM model to obtain the optimal parameters. The obtained principal component data are imported into empirical parameter LSSVM prediction model and the optimized parameter PSO-LSSVM prediction model, respectively, for modeling and prediction, and then comparing the prediction results to analyze the effect of model optimization. The results show that the absolute deviation of the optimized parameter prediction model is less than 9%. And the prediction accuracy of the optimized parameter prediction model is better than that of the empirical parameter model, which can provide a reliable basis for investment decision-making of transmission line projects.

7 December 2017 in Energies
Verified
Journal Article
Open access
PDF file
JLJinpeng Liu
Jinpeng Liu
CLChang-Ling Li
Chang-Ling Li
QNQing-Yun Nie
Qing-Yun Nie
JLJinpeng Liu
Jinpeng Liu
HSHai Shao
Hai Shao
JZJiang Zhu
Jiang Zhu
In line with the constraints of environmental problems and economic development, large-scale renewable-generation projects have been planned and constructed in recent years. In order to achieve sustainable power development and improve the power supply structure, China’s government has focused on distributed photovoltaic (PV) generation projects due to their advantages of clean emission and local consumption. However, their unstable output power still brings a series of problems concerning reliability, investment income, and available substitution proportion to traditional power, and so on. Therefore, it is imperative to understand the competitive development abilities of distributed PV generation projects and measure them effectively. First, through various investigation methods such as literature reviews, feasibility report analysis and expert interviews, the factors that influence the core abilities of distributed PV-generation projects were explored based on the micro-grid structure. Then, with the indexed exploration results, the factors were classified into 6 dimensions, i.e., investment and earning ability, production and operation ability, power-grid coordination ability, energy-conservation and emission-reduction ability, sustainable development ability, and society-serving ability. Meanwhile, an evaluation index system for core abilities of distributed PV-generation project was constructed using all quantitative indicators. Third, for examining the availability of the evaluation index system, combination weighting and techniques for order preference by similarity to an ideal solution (TOPSIS) methods were adopted to assess the practical distributed PV-generation projects. The case study results showed that installed capacity, local economy development, and grid-connected power quantity will influence the core abilities of distributed PV-generation project, obviously. The conclusions of the evaluation analysis on core abilities can provide useful references to operate and manage distributed PV-generation projects and promote their sustainable and health advantages. The proposed evaluation index system can also be used to assess power-generation projects in other types of energy, such as wind power and hydropower.


1 January 2019 in Mathematical Problems in Engineering
Verified
Journal Article
Open access
PDF file
TLTongyao Lin
Tongyao Lin
TYTao Yi
Tao Yi
CZChao Zhang
Chao Zhang
JLJinpeng Liu
Jinpeng Liu
To establish and consummate the electric power network, the construction and investment scale of power substation projects is expanding every year. As a capital‐technology‐intensive project, it has high requirements for power substation project management. Accurate cost forecasting can help to reduce the project cost, improve the investment efficiency, and optimize project management. However, affected by many factors, the construction cost of a power substation project usually presents strong nonlinearity and uncertainty, which make it difficult to accurately forecast the cost. This paper presents a new hybrid substation project cost forecasting method called PCA‐PSO‐SVM model, which is a support vector machine (SVM) model optimized by a particle swarm optimization (PSO) algorithm with principal component analysis (PCA). In this intelligent prediction model, the PCA method is introduced to reduce the data dimension. Furthermore, the PSO algorithm is used to optimize the model parameters. In the example, 65 sets of substation construction data are input into PCA‐PSO‐SVM model for construction cost prediction, and the prediction results are compared with other prediction methods to verify the forecasting accuracy. The results show that the MAPE and RMSE of the PCA‐PSO‐SVM model is 6.21% and 3.62, respectively. And, the prediction accuracy of this model is better than that of other models, which can provide a reliable basis for investment decision‐making of substation projects.