Pornrapeepat Bhasaputra

Dr. Pornrapeepat Bhasaputra


Research Focus & Metrics

Academic Career Length

18Years (2009-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
17 August 2021 in Energies
Verified
Journal Article
Open access
PDF file
NUNarongkorn Uthathip
Narongkorn Uthathip
PBPornrapeepat Bhasaputra
Pornrapeepat Bhasaputra
WPWoraratana Pattaraprakorn
Woraratana Pattaraprakorn
Electric Vehicle (EV) technology is one of the most promising solutions to reduce dependence on fossil fuels and greenhouse gas (GHG) emissions in the transportation sector. However, a large increase of EVs raises concerns about negative impacts on electricity generation, transmission, and distribution systems. This study analyzes the benefits and trade-offs for EV penetration in Thai road transport based on EV penetration scenarios from 2019 to 2036. Two charging strategies are considered to assess the impact of EV charging: free charging and off-peak charging. Uncertainty variables are considered by a stochastic approach based on Monte-Carlo simulation (MCS). The simulation results shown that the adoption of EVs can reduce both energy consumption and GHG emissions. The results also indicate that the increased load due to EV charging demand in all scenarios is still within the buffer level, compared to the installed generation capacity in the Power Development Plan 2018 revision 1 (PDP2018r1), and the off-peak charging strategy is more beneficial than the free-charging strategy. However, the increased load demand caused by all EV charging strategies has a direct impact on the power generating schedule, and also decreases the system reliability level.

28 July 2010 in ECTI Transactions on Electrical Engineering, Electronics, and Communications
Verified
Journal Article
Open access
PDF file
PBPornrapeepat Bhasaputra
Pornrapeepat Bhasaputra
SASumeth Anantasate
Sumeth Anantasate
WPWoraratana Pattaraprakorn
Woraratana Pattaraprakorn
This paper presents a multiobjective bees algorithm (MOBA) for solving the multiobjective optimal power flow. The multiobjective optimal power flow is to simultaneously minimize total fuel cost and environmental pollution of generation with considering various constraints i.e. limits on generator real and reactive power outputs, bus voltages, transformer tap-setting and power flow of transmission lines. The proposed multiobjective bees algorithm is developed by using principle of multiobjective optimization. A clustering algorithm is applied for multiobjective bees algorithm in order to manage the size of the Pareto-optimal set. The proposed approach has been tested on the standard IEEE 30-bus system. The multiobjective bees algorithm produces true and well-distributed Pareto-optimal fronts in a single run. The results show that multiobjective bees algorithm has effectiveness and potential for solving multiobjective optimal power flow problem.

31 July 2009 in ECTI Transactions on Electrical Engineering, Electronics, and Communications
Verified
Journal Article
Open access
PDF file
SASumeth Anantasate
Sumeth Anantasate
CCChaimongkon Chokpanyasuwan
Chaimongkon Chokpanyasuwan
PBPornrapeepat Bhasaputra
Pornrapeepat Bhasaputra
WPWoraratana Pattaraprakorn
Woraratana Pattaraprakorn
When power demand is foreseen to rapidly increase in near future, the need to upgrade the electrical system/ equipment becomes apparent. When operation must proceed while any change is in progress, the revision is very di±cult. Parallel operation of electrical equipment of various vintages and ratings is inevitable for some extent of time. The special considerations and review on the monitoring, metering and control of new master PLC controller called power management system (PMS) are discussed. Electrical distribution system design and equipment modi¯cation and upgrade which improve system operability, enhance reliability and contribute to safety are described. Furthermore, hazard is evaluated for electrical design of a system upgrade. The primary technique for the hazard evaluation was a hazard and operability study, which is a brainstorming approach conducted by a multidisciplinary team. The approach simulates creativity of the team member to generate new ideas. As a result of this study, numerous and qualitative recommendations have been made to electrical design the safety and operability problem out of the major power system upgrade. Among the recommendations are suggestions on protection and control strategy, materials of construction, process material releases, alternative design options, and maintenance of this power system upgrade.

1 August 2011 in ECTI Transactions on Electrical Engineering, Electronics, and Communications
Verified
Journal Article
Open access
PDF file
PTPanuwat Teansri
Panuwat Teansri
PBPornrapeepat Bhasaputra
Pornrapeepat Bhasaputra
WPWoraratana Pattaraprakorn
Woraratana Pattaraprakorn
The optimization in reliability cost-benefit analysis for distribution investment planning has been more attended on energy delivery services in Thailand. In this research, the reliability costs for the customer point of views represented as the interruption costs are presented. The data for analysis is provided from customer survey-based method during 2008-2009. Due to the direct and indirect impacts for electric customer in each category are different, the concept and methodology for data collecting based on customer survey is described. According to interruption costs are different for each sector, the customer survey results are classified into four customer sectors. In each sector, the individual customer damage function derived from survey is aggregated to develop sector customer damage function. The composite customer damage function utilized in regional reliability investment planning is also presented. In addition, the reliability cost evaluation in term of interrupted energy assessment rate for the selected industrial estate is determined in order to investigate industrial customer impact at the level of microeconomics scale. Application areas of reliability cost indices to enhance the effectiveness planning and operation of power distribution system are also recommended.