A high temperature cascade heat pump (HTCHP) system using low-grade heat from waste water to generate steam for industrial processes is studied from the thermodynamic and economic view. The effects of intermediate temperature, heat source temperature, heat sink temperature, working fluids, and the pinch point temperature difference at the evaporator, condenser, and intermediate heat exchanger on the thermodynamic performance and cost-effectiveness of the HTCHP system are investigated. The PBP varying with the gas price and electricity price is evaluated as well. The results show that optimal intermediate temperatures exist under different operational conditions, not only for the COP, but also for the PBP. A high heat source temperature and low heat sink temperature are conducive to increasing the COP and shortening the PBP. Working fluid pair R1234Ze(E)-R1233zd(Z) shows a promising application in the HTCHP system for its relatively high COP, short PBP, and low GWP. A lower pinch point temperature difference will cause a higher COP and shorter PBP, but a higher SEC. The energy price has a great effect on the economic viability of the system. When the price ratio is lower than 1.81, the PBP is lower than 4.6 years.
The present study aimed at investigating the use of a drying system combining the concept of low-pressure superheated steam drying and heat pump drying for fish. The effects of various drying medium pressures on the temperature field, airflow field, drying time, equipment performance as well as the power consumption of the drying process were investigated and discussed. Four comparative tests with different initial pressures were carried out according to a specified drying process by the combined drying system. The results showed that when the vacuum was high, the temperature field and airflow field in the drying chamber were more uniform. Due to the poor heat transfer performance of the drying medium at high vacuum, the drying time increased with a decrease in initial pressure. It was also found that with the decrease in drying medium pressure, the power consumption of the heat pump and the axial fans was reduced, while the power consumption of the electric heater went up. Overall, the total power consumption is directly proportional to the drying medium pressure.
In order to develop a highly efficient and stable high-temperature heat pump to realize high-efficient electrification in the industrial sector, performance of high-temperature heat pumps with a flash tank vapor injection and sub-cooler vapor injection are compared under different evaporation temperatures, condensation temperatures, compressor suction superheat degrees, subcooling degrees and compressor isentropic efficiencies. The results show that the COP, injection mass flow ratio and VHC of the FTVC are higher than those of the SVIC-0, SVIC-5, SVIC-10 and SVIC-20 under the same working conditions, while the discharge temperature of the FTVC is approximately equal to that of the SVIC-0 and lower than those of the SVIC-5, SVIC-10 and SVIC-20. When the evaporation temperature, the condensation temperature and injection pressure are 55 °C, 125 °C and 921.4 kPa, respectively, the system COP of the FTVC is 4.49, which is approximately 6.7%, 7.3%, 7.8% and 8.9% higher than those of the SVIC-0, SVIC-5, SVIC-10, and SVIC-20, respectively.
Two-stage absorption lithium bromide (Li-Br) refrigeration technology can utilize low-temperature heat sources to achieve refrigeration, thus it holds promising application prospects in the utilization of low-temperature waste heat. However, the performance of two-stage lithium bromide absorption chillers during variable operating conditions is difficult to accurately predict, necessitating further research. Unlike existing simulation-based studies, this paper employs an experimental approach for the first time to investigate the variable-condition performance of a two-stage lithium bromide absorption chiller. A 10 kW two-stage absorption Li-Br chiller was tested under variable operating conditions, including variations in chilled water outlet temperature, cooling water inlet temperature, hot water inlet temperature, and hot water flow rate. The experimental results indicate that each 1 °C increase in the chilled water outlet temperature leads to an additional 0.282 kW in cooling capacity and a 0.0071 increase in coefficient of performance (COP). Similarly, a 1 °C decrease in the cooling water inlet temperature results in a 0.366 kW increase in cooling capacity and a 0.0055 improvement in COP. When the hot water inlet temperature rises by 1 °C, the cooling capacity increases by 0.324 kW, while the COP remains nearly unchanged. Furthermore, a 10% increase in the hot water mass flow rate enhances the cooling capacity by approximately 5% and improves the COP by about 1%.
A rapid prediction framework for multi-physics field distributions in coal mine airways of variable lengths is presented. The framework integrates a Computational Fluid Dynamics model, a Proper Orthogonal Decomposition model, and machine learning techniques. The study first obtains multi-physics field distributions of temperature, velocity, species mass fraction, etc., in mining airways using CFD simulations under various operating parameters. It then constructs a POD model to decompose the high-dimensional raw snapshot data into mean field and pulsation field components, performing singular value decomposition on the pulsation field to obtain POD spatial modes and corresponding POD coefficients. Machine learning algorithms, including GA-BPNN and Bayes-XGBoost, are employed to construct predictive models of the POD coefficients. The results show that after fitting the relationship between operating parameters and POD coefficients, the multi-physics field distribution within the training parameter range can be rapidly predicted. When the cumulative energy contribution of POD modes exceeds 0.99 of the total energy, the Bayes-XGBoost model achieves minimum R2 values of 0.9448, 0.9999, and 0.9996 for velocity, temperature, and oxygen mass fraction predictions, respectively. This work provides a practical engineering solution for real-time prediction of multi-physical fields in variable-length mine airways, and achieves fast and accurate prediction within the training parameter range.