Dalong Jin

Dr. Dalong Jin

School of Civil Engineering, Beijing Jiaotong University, Beijing 100044, China

Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
16 March 2023 in Urban Rail Transit
Verified
Journal Article
Open access
PDF file
XSxiang shen
xiang shen
Dajun YuanDajun Yuan
Dajun Yuan
Dalong JinDalong Jin
Dalong Jin
XWXiao Wang
Xiao Wang
XCXiangsheng Chen
Xiangsheng Chen
Based on a cross-river tunnel of Wuhan Metro Line 8, we present a two-dimensional discrete element model for shield attitude adjustment considering the effect of overbreak cutters. The shield shell mechanics under the influence of over-excavation rate, over-excavation orientations, and overburden load are simulated, and the tunneling mechanics law and the ultimate range during the adjustment of the shield attitude are investigated. The simulation results indicate the following: (1) The greater the over-excavation rate, the smaller the force exerted by the soil layer in the negative direction of the shield movement; therefore, increasing the over-excavation rate is helpful in expanding the range of shield attitude adjustment. (2) The shield is stressed symmetrically while conducting positive and negative horizontal adjustments in the soil layer, which has a symmetrical distribution, but vertical upward adjustment is more difficult than vertical downward adjustment. (3) With the increase in overburden load, the space of the shield attitude adjustment is gradually reduced at the same over-excavation rate. A good engineering application was achieved in this project using the simulation model. It is recommended to use the attitude adjustment method by controlling the tunneling parameters. In difficult situations such as high overlying loads, the over-excavation cutter can be used to assist in adjusting the shield attitude.

31 December 2021 in Applied Sciences
Verified
Journal Article
Open access
PDF file
XSxiang shen
xiang shen
Dajun YuanDajun Yuan
Dajun Yuan
Dalong JinDalong Jin
Dalong Jin
Chengyong CaoChengyong Cao
Chengyong Cao
The existing cutterhead torque calculation method usually simplifies the characteristics of the shield, which ignores the rolling angle. In this paper, the cross-river shield project of Wuhan Metro Line 8 is taken as the research focus. Firstly, the measured data of the cutterhead torque (CT), the rolling angle and rotation direction were analyzed. Then on this basis, the penetrability, tunneling thrust, and rolling angle were taken as the influential factors to analyze CT sensitivity. Finally, based on the theoretical calculation model, a modified solution of CT was obtained considering the rolling angle. The results show that the rolling angle can be reduced to zero by changing the direction of the cutterhead rotation; the rolling angle has a greater impact on CT than the other two factors as shown through the analysis of the range difference and Statistical Product and Service Solutions (SPSS) method. As the absolute value of the rolling angle increases, CT also increases, and the relationship between them is linear. To a certain extent, the rolling angle of the shield can reflect the difficulty of tunneling and the running status. By monitoring the rolling angle of the shield, the prediction of CT can be more in line with the actual construction conditions.

11 February 2025 in Acta Geotechnica
Verified
Journal Article
Closed access
PDF file
XSxiang shen
xiang shen
Dajun YuanDajun Yuan
Dajun Yuan
JWJun Wu
Jun Wu
TQTong Qiu
Tong Qiu
XCXiangsheng Chen
Xiangsheng Chen
JWJiuqi Wu
Jiuqi Wu

10 April 2026 in Applied Sciences
Verified
Journal Article
Open access
PDF file
HJHui Jin
Hui Jin
EWEnzhi Wang
Enzhi Wang
Dalong JinDalong Jin
Dalong Jin
ZXZhen Xu
Zhen Xu
Deep-buried tunnels in urban environments require careful evaluation of their long-term interactions with the surrounding ground to ensure structural safety and sustainability. Taking the Beijing Eastern Sixth Ring Road renovation project as a case study, this research employs a fully coupled fluid–solid numerical approach to elucidate the long-term disturbance mechanisms associated with deep-buried shield tunneling. Specifically, the research quantifies spatio-temporal ground responses and characterizes the consolidation settlement mechanisms exacerbated by potential tunnel leakage. The results indicate that ground deformation is primarily governed by the intensity of tunnel leakage. When the waterproofing grade of the tunnel meets Grade I or II, leakage and surface settlement remain negligible. However, when a tunnel’s waterproofing grade deteriorates to Grade IV or lower, consolidation settlement increases significantly, becoming the dominant deformation mode. In addition, both the extent and severity of ground movement are highly sensitive to the geometrical boundaries of the strata and the relative depth of the tunnel. Larger permeable domains and deeper tunnels lead to wider pore pressure and stress disturbance zones, ultimately leading to more pronounced long-term settlement. Furthermore, soil permeability dictates the temporal evolution of the ground response, with poorly permeable layers exhibiting delayed fluid–solid re-equilibration. A critical threshold is observed when leakage rates align with or exceed the soil’s permeability, leading to a significant escalation in both the amplitude of subsidence and the time required to reach equilibrium. These findings offer valuable insights for the design, waterproofing, and long-term management of deep urban tunnels.