Abdelhady Hosny

Mr. Abdelhady Hosny

orcid

Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
4 October 2021 in Fire
Verified
Journal Article
Open access
PDF file
SASeyedeh Tannaz Shams Abadi
Seyedeh Tannaz Shams Abadi
NTNojan Moniri Tokmehdash
Nojan Moniri Tokmehdash
AHAbdelhady Hosny
Abdelhady Hosny
MNMazdak Nik-Bakht
Mazdak Nik-Bakht
Construction renovation projects increase the risk of structural fire, mostly due to the accumulation of combustible construction materials and waste. In particular, when the building remains operational during such projects, the redistribution of occupants and interruptions with access corridors/exit egress can exponentially increase the risk for the occupants. Most construction projects are, however, planned and scheduled merely based on the time and budget criteria. While safety is considered paramount and is meant to be applied as a hard constraint in the scheduling stage, in practice, safe evacuation considerations are reduced to rules of thumb and general code guidelines. In this paper, we propose simulation as a tool to introduce safety under structural fire, as a decision criterion, to be mixed with time and budget for selecting the best construction schedule alternative. We have used the BIM (building information model) to extract the building’s spatial and physical properties; and have applied co-simulation of fire, through computational fluid dynamics (CFD), and occupants’ evacuation behavior, through agent-based modeling (ABM) to estimate the average and maximum required safe egress time for various construction sequencing alternatives. This parameter is then used as a third decision criterion, combined with the project’s cost and duration, to evaluate construction schedule alternatives. We applied our method to a three-floor fire zone in a high-rise educational building in Montreal, and our results show that considering the fire safety criterion can make a difference in the final construction schedule. Our proposed method suggests an additional metric for evaluating renovation projects’ construction plans, particularly in congested buildings which need to remain fully or partially operational during the renovation. Thus, this method can be employed by safety officers and facility managers, as well as construction project planners to guide accounting for fire incidents while planning for these types of projects.

1 July 2022 in Journal of Computing in Civil Engineering
Verified
Journal Article
Closed access
PDF file
AHAbdelhady Hosny
Abdelhady Hosny
MNMazdak Nik-Bakht
Mazdak Nik-Bakht
OMOsama Moselhi
Osama Moselhi
The COVID-19 pandemic has impacted how the construction industry operates around the world. To fight the risk of transmission, new health, safety, and environmental (HSE) protocols have been put in place. Among these protocols are social distancing and limiting the number of workers per area, where social distancing acts as a so-called protective bubble for each worker. Contractors are now required to attempt to achieve (and be prepared to keep) social distancing among their workers whenever needed and possible. Otherwise, they could be forced to halt operations due to having an unsafe environment. Accordingly, construction plans, and corresponding workspace assignments, should be revised in a four-dimensional (4D) environment to ensure fulfillment. Even after the end of this pandemic, the new HSE awareness achieved during this experiment is expected to reshape the so-called new normal of construction. Therefore, this paper presents a novel workspace simulation and management solution comprising a theoretical framework and a semiautomated tool to incorporate physical distancing during 4D planning. The semiautomated tool creates a 4D building information model, loaded with workspaces and social distance bubbles as stochastic variables, and utilizes Monte Carlo simulation to model uncertainties occurring onsite. The uncertainties considered are both temporal and spatial, i.e., changes in productivity and workspace sizes, respectively. This tool surpasses existing workspace management solutions in that (1) it has a schedule generation module to recompute schedule projections based on temporal uncertainties, (2) its workspace generation module can automatically create physical distance buffers around selected workspaces, as per site conditions, (3) its 4D simulation can realistically mimic the work progress on the site, and (4) its 4D clash detection module can smartly detect and report both soft and hard operational clashes. Additionally, the proposed analytics target three levels of clash resolution: site, workspace, and activity level. The framework and developed tool were tested against a residential building case study. Over the course of 155 days, 26 activities with 257 workspace assignments were examined. The proposed solution was able to capture the critical schedule duration (21 out of 155 days), the impactful 4D clashes (44 out of 2,900), and the activities involved in the most sever clashes (5 out of 26). Hence, the proposed method and the developed software tool will help planners/construction managers understand the space requirements for construction operations considering social distancing and other required safety buffering, identify critical spatiotemporal zones, and suggest resolution strategies for the resulting clashes based on the analytics.