Vuko Kovijanić

Vuko Kovijanić


Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
3 September 2021 in Water
Verified
Journal Article
Open access
PDF file
VVVidosava Vilotijević
Vidosava Vilotijević
Uroš KaradžićUroš Karadžić
Uroš Karadžić
Radoje VujadinovićRadoje Vujadinović
Radoje Vujadinović
VKVuko Kovijanić
Vuko Kovijanić
Ivan BožićIvan Božić
Ivan Božić
Designing a small hydropower plant (SHPP) necessitates fulfillment of energy and ecological constraints, so a well-defined design flow is of the utmost significance. The main parameters of each SHPP are determined by appropriate techno-economic studies, whereas an improved approach to defining more precise SHPP installed parameter is presented in this paper. The SHPP installed parameter is the ratio of the design flow and averaged perennial flow obtained from the flow duration curve at the planned water intake location. Previous experiences in the design of SHPPs have shown that the SHPP installed parameter has a value in a wide range without the existence of an unambiguous equation for its determination. Therefore, with this aim, the thirty-eight (38) small watercources in the territory of Montenegro, denominated for the construction of SHPPs, have been investigated. SHPPs are divided into two groups depending on the installed capacity and the method of calculating the purchase price of electricity. For both groups, the range of SHPP installed parameter is determined according to the technical and economic criteria: the highest electricity production, the highest income, net present value (NPV), internal rate of return (IRR), and payback period (PB).