Bongjoo Jeong

Dr. Bongjoo Jeong


Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
3 November 2021 in Algorithms
Verified
Journal Article
Open access
PDF file
BJBongjoo Jeong
Bongjoo Jeong
JHJunhee Han
Junhee Han
JLJu-Yong Lee
Ju-Yong Lee
This study considers a scheduling problem for a flow shop with urgent jobs and limited waiting times. The urgent jobs and limited waiting times are major considerations for scheduling in semiconductor manufacturing systems. The objective function is to minimize a weighted sum of total tardiness of urgent jobs and the makespan of normal jobs. This problem is formulated in mixed integer programming (MIP). By using a commercial optimization solver, the MIP can be used to find an optimal solution. However, because this problem is proved to be NP-hard, solving to optimality requires a significantly long computation time for a practical size problem. Therefore, this study adopts metaheuristic algorithms to obtain a good solution quickly. To complete this, two metaheuristic algorithms (an iterated greedy algorithm and a simulated annealing algorithm) are proposed, and a series of computational experiments were performed to examine the effectiveness and efficiency of the proposed algorithms.

17 October 2021 in Applied Sciences
Verified
Journal Article
Open access
PDF file
JHJunhee Han
Junhee Han
JLJu-Yong Lee
Ju-Yong Lee
BJBongjoo Jeong
Bongjoo Jeong
This study considers a production planning problem with a two-level supply chain consisting of multiple suppliers and a manufacturing plant. Each supplier that consists of multiple production lines can produce several types of semi-finished products, and the manufacturing plant produces the finished products using the semi-finished products from the suppliers to meet dynamic demands. In the suppliers, different types of semi-finished products can be produced in the same batch, and products in the same batch can only be started simultaneously (at the same time) even if they complete at different times. The purpose of this study is to determine the selection of suppliers and their production lines for the production of semi-finished products for each period of a given planning horizon, and the objective is to minimize total costs associated with the supply chain during the whole planning horizon. To solve this problem, we suggest a mixed integer programming model and a heuristic algorithm. To verify performance of the algorithm, a series of tests are conducted on a number of instances, and the results are presented.

19 June 2023 in Processes
Verified
Journal Article
Open access
PDF file
SSSangoh Shim
Sangoh Shim
BJBongjoo Jeong
Bongjoo Jeong
JBJune-Young Bang
June-Young Bang
JPJeongMin Park
JeongMin Park
In this paper, we address a two-stage hybrid flowshop scheduling problem with identical parallel machines in each stage. The problem assumes that the queue (Q)-time for each job, which represents the waiting time to be processed in the current stage, must be limited to a predetermined threshold due to quality concerns for the final product. This problem is motivated by one that occurs in the real field, especially in the diffusion workstation of a semiconductor fabrication. Our objective is to minimize the makespan of the jobs while considering product quality. To achieve this goal, we formulated mathematical programming, developed two dominance properties for this problem, and proposed three heuristics with the suggested dominance properties to solve the considered problem. We conducted simulation experiments to evaluate the performance of the proposed approaches using randomly generated problem instances that are created to closely resemble real production scenarios, and the results demonstrate their superiority over existing methods. Furthermore, we applied the proposed methods in a real-world setting within the semiconductor fabrication industry, where they have exhibited better performance compared to the dispatching rules commonly used in practical applications. These findings validate the effectiveness and applicability of our proposed methodologies in real-world scenarios.

1 January 2026 in Journal of Industrial and Management Optimization
Verified
Journal Article
Open access
PDF file
JLJu-Yong Lee
Ju-Yong Lee
BJBongjoo Jeong
Bongjoo Jeong
This study addresses the complex 2-stage hybrid flow shop (HFS) scheduling problem, which involves urgent and normal jobs in a multi-agent context. The goal is to simultaneously minimize the makespan for normal jobs and the total tardiness for urgent jobs. Our proposed approaches include a Mixed-Integer Programming (MIP) model, list scheduling algorithms (MEDD, MEDD2), constructive algorithms (MNEH, MN-NEH, MFL, MN-MFL), and a simulated annealing (SA) metaheuristic to find practical solutions. Extensive experiments, using randomly generated instances which reflect real manufacturing environments, validate the algorithms' performance. The SA algorithm consistently exhibits a superior and robust performance across all scenarios, finding solutions remarkably close to the optimal. Additionally, MFL and MN-MFL show noteworthy efficiencies and stable performances, indicating their potential for practical applications in rapid decision-making environments.