Radhanon Diewvilai

Mr. Radhanon Diewvilai

Chulalongkorn University
orcid

Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
11 September 2021 in Energies
Verified
Journal Article
Open access
PDF file
Radhanon DiewvilaiRadhanon Diewvilai
Radhanon Diewvilai
Kulyos AudomvongsereeKulyos Audomvongseree
Kulyos Audomvongseree
This paper proposes a methodology to develop generation expansion plans considering energy storage systems (ESSs), individual generation unit characteristics, and full-year hourly power balance constraints. Generation expansion planning (GEP) is a complex optimization problem. To get a realistic plan with the lowest cost, acceptable system reliability, and satisfactory CO2 emissions for the coming decades, a complex multi-period mixed integer linear programming (MILP) model needs to be formulated and solved with individual unit characteristics along with hourly power balance constraints. This problem requires huge computational effort since there are thousands of possible scenarios with millions of variables in a single calculation. However, in this paper, instead of finding the globally optimal solutions of such MILPs directly, a simplification process is proposed, breaking it down into multiple LP subproblems, which are easier to solve. In each subproblem, constraints relating to renewable energy generation profiles, charge-discharge patterns of ESSs, and system reliability can be included. The proposed process is tested against Thailand’s power development plan. The obtained solution is almost identical to that of the actual plan, but with less computational effort. The impacts of uncertainties as well as ESSs on GEP, e.g., system reliability, electricity cost, and CO2 emission, are also discussed.

27 May 2022 in Energies
Verified
Journal Article
Open access
PDF file
Radhanon DiewvilaiRadhanon Diewvilai
Radhanon Diewvilai
Kulyos AudomvongsereeKulyos Audomvongseree
Kulyos Audomvongseree
To avoid the potential adverse impacts of climate change from global warming, it is suggested that the target of net zero emissions should be reached by this mid-century. Thailand is aiming to achieve carbon neutrality by 2050. Since electricity generation is one of the largest producers of carbon dioxide emission, the associated emissions must be greatly reduced to achieve the targets mentioned above. Thus, new generation expansion plans must be well developed. This paper discusses the development of generation expansion plans considering Thailand’s latest policies along with enhancement of the existing multi-period linear programming model, allowing new electricity generation technologies having low emissions, e.g., solar PV with battery and hydrogen blending in natural gas, to be integrated into generation expansion planning. Then, four generation expansion plans with different levels of hydrogen blending in natural gas are proposed and discussed. It is found that Thailand can achieve carbon neutrality by 2050 by promoting more use of renewable energy altogether with trade-off between land for solar PV installation and amount of hydrogen blended in natural gas. The lesson learned from this study provides crucial information about possible pathways to achieve carbon neutrality in the electricity sector for policy makers in other countries.

13 July 2022 in Energies
Verified
Journal Article
Open access
PDF file
Siripha JunlakarnSiripha Junlakarn
Siripha Junlakarn
Radhanon DiewvilaiRadhanon Diewvilai
Radhanon Diewvilai
Kulyos AudomvongsereeKulyos Audomvongseree
Kulyos Audomvongseree
In power system planning, the growth of renewable energy generation leads to several challenges including system reliability due to its intermittency and uncertainty. To quantify the relatively reliable capacity of this generation, capacity credit is usually adopted for long-term power system planning. This paper proposes an evaluation of the capacity credit of renewable energy generation using stochastic models for resource availability. Six renewable energy generation types including wind, solar PV, small hydro, biomass, biogas, and waste were considered. The proposed models are based on the stochastic process using the Wiener process and other probability distribution functions to explain the randomness of the intermittency. Moreover, for solar PV—the generation of which depends on two key random variables, namely irradiance and temperature—a copula function is used to model their joint probabilistic behavior. These proposed models are used to simulate power outputs of renewable energy generations and then determine the capacity credit which is defined as the capacity of conventional generation that can maintain a similar level of system reliability. The proposed method is tested with Thailand’s power system and the results show that the capacity credit depends on the time of day and the size of installed capacity of the considered renewable energy generation.

18 March 2024 in IEEE Access
Verified
Journal Article
Open access
Radhanon DiewvilaiRadhanon Diewvilai
Radhanon Diewvilai
Kulyos AudomvongsereeKulyos Audomvongseree
Kulyos Audomvongseree
This paper proposes a method for generation expansion planning that incorporates full-year hourly multiple load levels balance constraints, providing sufficient flexibility to address load fluctuations and intermittency associated with variable renewable energy sources. Typically, ensuring that the generation system possesses enough flexibility to manage this intermittency involves considering the operational characteristics of generators within unit commitment constraints. However, to mitigate the substantial computational burden caused by the number and type of variables, various approximation techniques are often employed. Unfortunately, these techniques can introduce unrealistic elements into the problem. Instead of considering the operational characteristics of generators, this approach classifies the system’s demand into three levels: base load, intermediate load, and peak load, using the proposed load classification method. The multiple load-level balance constraints are then applied to ensure that the capacity of generation units in each level is sufficient to meet their corresponding demand, with particular emphasis on matching fast-response generation units and their corresponding demand. The resulting generation expansion plan can be obtained with significantly reduced computational effort. The proposed load classification method and generation expansion planning approach have been tested using the latest power development plan of Thailand. Compared to another method that is not taken flexibility into account, 5 Gigawatts of fast-response generation capacity are selected instead of base load generation units. With the improved computational time achieved by the proposed generation expansion planning method, it can account for input data uncertainty by solving multiple generation expansion planning problems with varying input data and distinct individual probabilities.

23 October 2022 in Energies
Verified
Journal Article
Open access
PDF file
Radhanon DiewvilaiRadhanon Diewvilai
Radhanon Diewvilai
Kulyos AudomvongsereeKulyos Audomvongseree
Kulyos Audomvongseree
In generation expansion planning, reliability level is the key criterion to ensure enough generation above peak demand in case there are any generation outages. This reliability criterion must be appropriately optimized to provide a reliable generation system with a minimum generation cost. Currently, a method to determine an optimal reliability criterion is mainly focused on reserve margin, an accustomed criterion used by several generation utilities. However, Loss of Load Expectation (LOLE) is a more suitable reliability criterion for a generation system with a high proportion of renewable energy since it considers both the probabilistic characteristics of the generation system and the entire load’s profile. Moreover, it is also correlated with the reserve margin. Considering the current fuel supply situation, a probabilistic model based on Bayes’ Theorem is also proposed to incorporate fuel supply unavailability into the probabilistic criterion. This paper proposes a method for determining the optimal LOLE along with a model that incorporates fuel supply unavailability into consideration. This method is tested with Thailand’s Power Development Plan 2018 revision 1 to demonstrate numerical examples. It is found that the optimal LOLE of the test system is 0.7 day/year, or shifted to 0.55 day/year in the case of considering the fuel supply unavailability.

30 October 2024 in IEEE Access
Verified
Journal Article
Open access
Radhanon DiewvilaiRadhanon Diewvilai
Radhanon Diewvilai
Kulyos AudomvongsereeKulyos Audomvongseree
Kulyos Audomvongseree
A typical power system consists of a network of generation, transmission, and load spanning a wide area, with varying spatial characteristics crucial for realistic problem-solving. Traditional generation expansion plans (GEP) often treat the generation system as a single area, specifying types and sizes of new power plants to meet future demand without designating specific locations. This approach leads to generation-demand imbalances, unnecessary transmission expansions, and other issues. Incorporating regional constraints like local demand, tie-line capacity, and available resources is essential in GEP. Considering the entire transmission network can address spatial characteristics but presents challenges due to extensive data preparation and computational complexity. This paper proposes a GEP approach that accounts for spatial characteristics such as primary energy sources, renewable energy potential, and feasible locations for future units. With the proposed method, the power system is divided into multiple zones, each represented by a single bus connected by interzonal transmission lines. This zonal approach simplifies the transmission model by focusing on interzonal data, making it more practical for actual power systems. An area-based reliability index is used to evaluate each area’s reliability level, aiding in the suitable placement of future generation units. The proposed method was tested using Thailand’s latest power development plan, PDP2018 revision 1. Results show that accounting for spatial characteristics alters the generation expansion plan. Additionally, new units are distributed across the system to maintain area reliability. Improved computational efficiency of this proposed method allows for addressing uncertainty by solving multiple scenarios with varying input data and probabilities.