Michael Kühn

Dr. Michael Kühn

GFZ German Research Centre for Geosciences, Fluid Systems Modelling, Telegrafenberg, 14473 Potsdam, Germany

Research Focus & Metrics

Academic Career Length

29Years (1998-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 December 2010 in International Journal of Greenhouse Gas Control
Verified
Journal Article
Closed access
HWHilke Würdemann
Hilke Würdemann
FMFabian Möller
Fabian Möller
Michael KühnMichael Kühn
Michael Kühn
WHWolfgang Heidug
Wolfgang Heidug
NCNiels Peter Christensen
Niels Peter Christensen
FSFrank R. Schilling
Frank R. Schilling

25 April 2012 in Environmental Earth Sciences
Verified
Journal Article
Open access
PDF file
SMSonja Martens
Sonja Martens
TKThomas Kempka
Thomas Kempka
ALAxel Liebscher
Axel Liebscher
SLStefan Luth
Stefan Luth
FMFabian Moller
Fabian Moller
Michael KühnMichael Kühn
Michael Kühn
The Ketzin pilot site, led by the GFZ German Research Centre for Geosciences, is Europe’s longest-operating on-shore CO2 storage site with the aim of increasing the understanding of geological storage of CO2 in saline aquifers. Located near Berlin, the Ketzin pilot site is an in situ laboratory for CO2 storage in an anticlinal structure in the Northeast German Basin. Starting research within the framework of the EU project CO2SINK in 2004, Ketzin is Germany’s first CO2 storage site and fully in use since the injection began in June 2008. After 39 months of operation, about 53,000 tonnes of CO2 have been stored in 630–650 m deep sandstone units of the Upper Triassic Stuttgart Formation. An extensive monitoring program integrates geological, geophysical and geochemical investigations at Ketzin for a comprehensive characterization of the reservoir and the CO2 migration at various scales. Integrating a unique field and laboratory data set, both static geological modeling and dynamic simulations are regularly updated. The Ketzin project successfully demonstrates CO2 storage in a saline aquifer on a research scale. The results of monitoring and modeling can be summarized as follows: (1) Since the start of the CO2 injection in June 2008, the operation has been running reliably and safely. (2) Downhole pressure data prove correlation between the injection rate and the reservoir pressure and indicates the presence of an overall dynamic equilibrium within the reservoir. (3) The extensive geochemical and geophysical monitoring program is capable of detecting CO2 on different scales and gives no indication for any leakage. (4) Numerical simulations (history matching) are in good agreement with the monitoring results.

1 December 2010 in International Journal of Greenhouse Gas Control
Verified
Journal Article
Closed access
ULU. Lengler
U. Lengler
MLMarco De Lucia
Marco De Lucia
Michael KühnMichael Kühn
Michael Kühn

1 February 2009 in Energy Procedia
Verified
Journal Article
Open access
FSF. Schilling
F. Schilling
GBG. Borm
G. Borm
HWH. Würdemann
H. Würdemann
FMF. Möller
F. Möller
Michael KühnMichael Kühn
Michael Kühn
The CO2SINK Integrated Project aims at in-situ testing of geological storage of CO2 in a saline aquifer. A field laboratory is developed with one injection well and two observation wells (50 m and 100 m distance). Focus of the project is on monitoring the fate of the injected CO2 using a broad range of geophysical, geochemical and microbiological techniques. Injection of CO2 in a depth of approximately 650 m started end of June 2008 and arrival has been determined in the nearer observation well as expected and predicted after an amount of 531 t CO2

1 January 2013 in Energy Procedia
Verified
Journal Article
Open access
SMSonja Martens
Sonja Martens
ALAxel Liebscher
Axel Liebscher
FMFabian Möller
Fabian Möller
JHJan Henninges
Jan Henninges
TKThomas Kempka
Thomas Kempka
KGKetzin Group
Ketzin Group
At Ketzin, located west of Berlin, the GFZ German Research Centre for Geosciences operates Europe's longest- running on-shore CO2 storage site. The Ketzin pilot site has been developed since 2004 and comprises three wells to depths of 750 m to 800 m and one shallow observation well, an injection facility and permanently installed monitoring devices. Since June 2008, CO2 is injected into 630 m to 650 m deep sandstone units (Upper Triassic Stuttgart Formation) in an anticlinal structure of the Northeast German Basin. Until mid of May 2012, about 61,400 t of CO2 have been stored safely. One of the most comprehensive monitoring concepts worldwide is applied and capable of detecting the behaviour of the CO2 in the subsurface. The Ketzin project demonstrates safe CO2 storage in a saline aquifer on a research scale and effective monitoring. This paper summarizes the key results obtained after four years of CO2 injection

1 December 2018 in Renewable and Sustainable Energy Reviews
Verified
Journal Article
Closed access
JMJianli Ma
Jianli Ma
QLQi Li
Qi Li
Michael KühnMichael Kühn
Michael Kühn
NNNatalie Nakaten
Natalie Nakaten