School of Civil Engineering and Surveying, Faculty of Health, Engineering and Sciences, University of Southern Queensland, Darling Heights QLD 4350, Australia
Dr. David Thorpe
School of Civil Engineering and Surveying, Faculty of Health, Engineering and Sciences, University of Southern Queensland, Darling Heights QLD 4350, Australia
Purpose: The purpose of this paper is to investigate a set of risk-related factors influencing the earned value management (EVM) concept as an assessment technique in evaluating the progress of modern sustainable infrastructure construction projects. Design/methodology/approach: A qualitative research approach has been adopted for identifying risk-related factors influencing EVM concept from a literature review and through interviewing industry personnel, followed by an inductive process to form sets of key factors and their measuring items. Findings: EVM is a common method for assessing project performance. A weakness of this approach is that EVM assessment in its current form does not measure the impact of a number of project performance factors that result from the complexity of modern infrastructure construction projects, and thus does not accurately assess their impact in this performance. This paper discusses and explains a range of potential risk factors to evaluating project performance such as sustainability, stakeholder requirements, communication, procurement strategy, weather, experience of staff, site condition, design issues, financial risk, subcontractor, government requirements and material. In addition, their measuring items were identified. Practical implications: This research assists projects managers to improve the evaluation process of infrastructure construction performance by incorporating a range of factors likely to impact on that performance and which are not included in current EVM calculations. Originality/value: This research addresses the need to include in the EVM calculation a range of risk factors affecting the performance of infrastructure projects in Australia and therefore makes this calculation a more reliable tool for assessing project performance.
Purpose – Through investigating the innovation-adoption process in smaller construction industry firms, this paper aims to ascertain the drivers of innovation in Australian small residential building firms, and determine how such firms develop or adopt innovations. The research thus provides a more thoroughly nuanced understanding of the innovation-adoption process within these firms. Design/methodology/approach – The research described in this paper was conducted among small residential housing contractors in South-East Queensland, Australia. This was undertaken by means of a semi-structured interview process, based on a questionnaire requesting information from owners or managers. Findings – Innovation in this sector is driven by general business concerns pertaining to maintaining overall competitiveness rather than specific client needs. The same firms also utilize supply-chain relationships and broader industry associations as sources of external knowledge. Despite this, better pathways to transfer externally generated knowledge require implementation, especially as a means to ensure continued sector growth and deliver public goods such as enhanced worker health and environmental sustainability. Practical implications – The paper highlights the current communication and informational disjuncture between research institutions and practitioners. As a result, workable suggestions for enhanced and meaningful interaction among firms, peak bodies and key research institutions are advanced. Originality/value – The study complements previous research on innovation development and adoption. Given that there is little previous research on the innovation-adoption process in the residential building sector, the paper provides an important counterpoint to studies that generally focus on much larger construction firms.
22 June 2019 in International Journal of Managing Projects in Business
Purpose: This research examined how Australian construction projects perform in the area of client-led innovation. The purpose of this paper is to test the influence of a set of enablers in promoting the innovative performance of construction projects and examine how Australian construction projects perform in relation to innovation. Design/methodology/approach: A questionnaire was developed and distributed to over 300 construction industry practitioners to obtain perceptions of industry practitioners regarding client-led enablers to promoting innovation at the project level, with 131 valid responses received. The data from the survey were subjected to statistical analyses including mean comparisons, using the Mann–Whitney U-test and Kruskal Wallis Test. Findings: This research identified a number of enablers that clients can employ in construction projects to enhance innovative performance. It also revealed that the innovative performance of construction projects in Australia appears to be above average, although the perceived level is not too high. The main finding of the research is that Australian clients could achieve higher outcomes from construction projects by promoting innovativeness in their projects, especially by promoting innovativeness in their own organizations and providing incentives/rewards and other support for innovative activities in projects. Originality/value: Past research focusing on client-led enablers at the project level is limited. This research identified a number of enablers that clients can employ to achieve greater benefits from their projects through innovation.
The construction industry in the Kingdom of Saudi Arabia (KSA) is a significant sector in the Middle East, with annual expenditures exceeding USD 120 billion. It employs 15% of the workforce and consumes more than 14% of the country’s energy resources. Despite the significant growth in the Saudi construction sector, it faces various challenges due to the rapid launch of mega projects, such as the Line project engaged with the NEOM project, as well as other new projects as part of the Saudi Vision 2030. The challenges might be limited to a shortage of skilled labourers, rising costs, construction disputes, and material shortages. This study aims to investigate claims management procedures under traditional practice and compare them with a proposed BIM package as an alternative solution to mitigate construction disputes. The objective of the study focuses on reducing the time consumed when analysing claims against the level of accuracy of claims values. The proposed BIM model improves and streamlines the claims process through automation. This study presents prospective and retrospective methods in delay analysis under an accepted programme. A questionnaire survey was conducted, and out of a total of 123 practitioners, 79 replied. The findings in tables in this article reveal that there are demands and a growing awareness of BIM in the KSA construction industry. The results reveal that BIM can help to reduce potential disputes and can reduce overall project cost overruns.