Naeim Roshan

Mr. Naeim Roshan


Research Focus & Metrics

Academic Career Length

4Years (2023-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
27 February 2023 in Journal of Building Pathology and Rehabilitation
Verified
Journal Article
Closed access
PDF file
NRNaeim Roshan
Naeim Roshan
Mansour GhalehnoviMansour Ghalehnovi
Mansour Ghalehnovi
SPseyed soroush Pakzad
seyed soroush Pakzad

27 June 2023 in Case Studies in Construction Materials
Verified
Journal Article
Open access
NRNaeim Roshan
Naeim Roshan
Mansour GhalehnoviMansour Ghalehnovi
Mansour Ghalehnovi

10 March 2025 in Construction and Building Materials
Verified
Journal Article
Open access
KDKambiz Daneshvar
Kambiz Daneshvar
MMM. Javad Moradi
M. Javad Moradi
NRNaeim Roshan
Naeim Roshan
Martin NoëlMartin Noël
Martin Noël
HHHamzeh Hajiloo
Hamzeh Hajiloo

1 March 2023 in Journal of Materials in Civil Engineering
Verified
Journal Article
Closed access
PDF file
Mansour GhalehnoviMansour Ghalehnovi
Mansour Ghalehnovi
HRHosseinali Rahdar
Hosseinali Rahdar
MGMohamad Ghorbanzadeh
Mohamad Ghorbanzadeh
NRNaeim Roshan
Naeim Roshan
SGSara Ghalehnovi
Sara Ghalehnovi
Bond behavior is the mutual effect and the force transmission between concrete and reinforcing bar that directly influence the behavior of reinforced concrete structures. Considering the silica fume (SF) and marble waste powder (MWP) could enhance the concrete matrix and improve its adherence, the bond-slip behavior of corroded reinforcing bar in concrete containing SF and MWP as ordinary portland cement (OPC) is examined in this work. Three of 16 concrete mixes were selected for this investigation: one control mix, a second mix containing 10% SF and 5% MWP as OPC replacements, and the third containing 10% SF and 20% MWP as OPC replacements. The pullout test was applied to the specimens with 0%, 2%, 5%, and 10% corroded reinforcement. According to the results of specimens with uncorroded reinforcement, replacing 10% of cement by SF and 5% or 20% by MWP, the bond strength between concrete and reinforcing bar increased by 27% and 13%, respectively, compared to that of the control specimens. Also, the samples containing SF and MWP showed higher corrosion resistance and their bond strength’s loss due to the corrosion of reinforcing bars was less than the control samples. The results also indicate that bond stress at low corrosion (2%) levels is partially increased because of the friction resulting from the accumulation of corrosion products on reinforcement’s surface. However, for higher corrosion levels (5% and 10%), the bond strength decreases. By comparing the two diameters of reinforcing bars (12 and 16 mm), it was recognized that the reduction of bond strength due to the corrosion is more severe in the reinforcements with greater diameters.

20 January 2026 in Engineering Structures
Verified
Journal Article
Open access
MHMajid Hamidi
Majid Hamidi
NRNaeim Roshan
Naeim Roshan
MAMasoud Adelzadeh
Masoud Adelzadeh
HHHamzeh Hajiloo
Hamzeh Hajiloo