Amílcar Arantes

Prof. Amílcar Arantes

Civil Engineering Research and Innovation for Sustainability Unit – CERIS, Lisbon, Lisboa, Portugal
orcid

Research Focus & Metrics

Academic Career Length

27Years (2000-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 December 2013 in Journal of Purchasing and Supply Management
Verified
Journal Article
Closed access
António Aguiar CostaAntónio Aguiar Costa
António Aguiar Costa
Amílcar ArantesAmílcar Arantes
Amílcar Arantes
LTLuís Valadares Tavares
Luís Valadares Tavares

22 September 2022 in Buildings
Verified
Journal Article
Open access
PDF file
ARAdriana Machado Ribeiro
Adriana Machado Ribeiro
Amílcar ArantesAmílcar Arantes
Amílcar Arantes
Carlos Oliveira CruzCarlos Oliveira Cruz
Carlos Oliveira Cruz
Modular construction is the most advanced method of off-site construction available, generating fully-fitted modules with up to 80% of the work completed in a controlled environment prior to their transportation and installation on-site. The adoption of modular construction (AMC) has increased in several countries worldwide. However, in smaller construction markets, the adoption rates remain low, and the industry is still heavily reliant on traditional labor-intensive methods. The main research question for this study is: What are the main barriers (including the root barriers) to the adoption of modular construction in Portugal? The methodology used was a mixed methods research (MMR) approach, trying to understand if there are any specificities in the Portuguese (European Union) markets compared with the more well-documented North American and Asian markets. First, a literature review followed by a survey were used to prioritize a list of 15 critical barriers to the AMC. The results and interrelations between the barriers were analyzed through an interpretive structural modeling (ISM) approach and an impact matrix cross-reference multiplication applied to a classification (MICMAC) analysis. The combined analyses show that the main barriers are low levels of R&D, a lack of accredited organizations to certify the quality of the manufactured components and the industry’s unwillingness to innovate.

1 October 2016 in Transportation Research Part D: Transport and Environment
Verified
Journal Article
Closed access
PAParisa Ahani
Parisa Ahani
Amílcar ArantesAmílcar Arantes
Amílcar Arantes
SMSandra Melo
Sandra Melo

17 February 2020 in Production Planning & Control
Verified
Journal Article
Closed access
Amílcar ArantesAmílcar Arantes
Amílcar Arantes
LFLuis Ferreira
Luis Ferreira
The aim of the present study is to present a methodology for the development of delay mitigation measures in construction projects. The proposed methodology, based on the identification of the underlying causes of delays and the stages of the construction project at which their observed causes take place, comprises four steps namely, questionnaire design, data collection, data analysis and development of delay mitigation measures in a focus group discussion. The application of this methodology in the Portuguese context, based on 94 surveys completed by clients, consultants and contractors, resulted in the identification of six underlying causes of delays in construction that were used to develop a set of mitigation measures. The results, on one hand, confirm the value of the methodology in helping to develop delay mitigation measures; on the other hand, they provide guidelines for the application of the methodology. Thus, this study contributes to the literature on project management by presenting an innovative methodology for the development of effective and practical delay mitigation measures in construction projects.

3 January 2023 in Production Planning & Control
Verified
Journal Article
Closed access
Amílcar ArantesAmílcar Arantes
Amílcar Arantes
LFLuis Ferreira
Luis Ferreira
Construction delays are recurrent worldwide, regardless of the type of work, and can result in severe impacts, such as time and cost overruns and conflicts. This work aims to present a methodology to develop mitigation measures for the causes of Delays in Construction Projects (DCPs). Prior works have explored strategies to develop these measures but systematically failed to consider that the interrelationships among causes affect the significance of the impact of each cause. The methodology proposed combines the Interpretative Structural Modelling (ISM) and Matrix Cross Impact Matrix Multiplication (MICMAC) analyses approaches and is grounded on the opinions of construction experts collected during Focus Group Interviews (FGI). First, the critical causes of DCPs are identified. Second, the ISM model is built, representing the interrelationships between the causes and their hierarchy. Third, the MICMAC analysis is performed, revealing the strengths of the relationships among the influencing causes. Fourth, mitigation measures are developed to address the root causes identified in the previous steps, but they are designed to target and mitigate other causes, given their hierarchical relationships, driving power, and levels of dependence. Applying this methodology to the Portuguese context revealed 16 critical causes, which were then hierarchized into six levels of influence. Inadequate bidding and contract award processes and deficient communication between parties were deemed root causes, and 23 measures were put forward to mitigate DCPs. Therefore, this study contributes to the body of knowledge by designing an innovative and practitioner-wise methodology to develop mitigation measures in relation to DCPs and revealing some measures for the Portuguese context.

22 May 2024 in Sustainability
Verified
Journal Article
Open access
PDF file
SMSANDRA MARIA BRITO MONTEIRO MELO
SANDRA MARIA BRITO MONTEIRO MELO
RGRui Gomes
Rui Gomes
RAReza Abbasi
Reza Abbasi
Amílcar ArantesAmílcar Arantes
Amílcar Arantes
Transport-on-demand services, such as demand-responsive transport (DRT), involve a flexible transportation service that offers convenient and personalised mobility choices for public transport users. Integrating DRT with mobile data and data analytics enhances understanding of travel patterns and allows the development of improved algorithms to support design-optimised services. This study introduces a replicable framework for DRT that employs an on-demand transport simulator and routing algorithm. This framework is supported by a mobile data set, enabling a more accurate service design grounded on actual demand data. Decision-makers can use this framework to understand traffic patterns better and test a DRT solution before implementing it in the actual world. A case study was conducted in Porto, Portugal, to demonstrate its practicality and proof of concept. Results show that the DRT solution required 135% fewer stops and travelled 81% fewer kilometres than the existing fixed-line service. Findings highlight the potential of this data-driven framework for urban public transportation systems to improve key performance metrics in required buses, energy consumption, travelled distance, and stop frequency, all while maintaining the number of served passengers. Under specific circumstances, embracing this approach can offer a more efficient, user-centric, and environmentally sustainable urban transportation service.