Coal mining that applies the open pit method has the potential to generate acid mine drainage. Acid mine drainage (AMD) treatments must include processes to mitigate significant challenges; these treatments include active treatment with high costs and process uncertainty and passive treatment with its limitations. The new concept of the swampy forest system involves the development of passive treatment for AMD, which lowers costs, increases capacity, and provides a natural process to mitigate the AMD that has been generated. A laboratory simulation experiment was carried out to obtain the basic data required for the swampy forest system treatment. The basic reference data determined in this study, including the total volume of water, the water debt flows into the swampy forest scale laboratory system and the retention time, were obtained to bring the parameter values that failed to meet the quality standards into compliance, according to the applicable regulations. The AMD swampy forest treatment design in the pilot project at the treatment field can apply a scaled-up version of the basic data from the simulation laboratory experiment results.
Coal mining with the area of the potential acid-forming category can generate acid mine drainage. Acid mine drainage (AMD) that has been formed must be appropriately managed. There are two techniques to treat AMD by the challenge specificity, including the prohibitive cost of the conventional active treatment with an uncertain process and the passive treatment, which faces time constraints and a wider area for preparation. A novel swampy forest system is a development to overcome the weaknesses of conventional processing by naturally responsive mitigation, reducing cost and speed, which results in greater capacity in AMD treatment. The swampy forest system implemented in coal mining relies on three main components: empty fruit bunches as organic matter, grass, and selected tree species planted in the treatment pond. The system effectively changes the non-compliance parameters of wastewater when entered at the system’s inlet to meet the threshold value after processing. It allows for flowing to the public bodies references with the applicable regulation.
Coal mining is one of economic sector that requires forestry area in Indonesia. Most of coal mining concession are forestry area loan use from the government and during mining operation facing with acid mine drainage (AMD). AMD passive treatment can be integrated with revegetation process that related with better handling of overburden (OB) with potential acid forming (PAF) during reclamation processed. The most expensive methods and uncertainty process are the use of quick lime in treatment of AMD. During operation and preparing mine closure stage need to create the effective one to comply with the regulation. “Swampy Forest (SF) system” is an alternative method of sustainable and naturally process. Selecting the appropriate tree species as a preliminary process to develop a better SF system by batch experiment in the form of a forest constructed wetland. The tree species selected are Nauclea orientalis (lonkida tree) and Melaleuca cajuputi (kayuputih tree) as non-local species then Nauclea subdita (bangkal tree) and Melaleuca leucadendron (galam tree) as local species have been selected. Local species higher in Fe and Mn adsorption in pH of AMD 4 condition.
31 March 2024 in Journal of Ecological Engineering
AMD (acid mine drainage) with low pH and high heavy metals content is a serious environmental problem in mining activities. Proper AMD management is crucial to ensure compliance with the standards of environmental quality before allowing the flow to the public water system. The objective of this...
1 July 2025 in Journal of Degraded and Mining Lands Management
Open-pit coal mining temporarily alters natural landscapes, resulting in degraded overburden dumps and the formation of pit lakes. In Indonesia, post-mining landforms must undergo reclamation to support sustainable land use. This study evaluates the hydrological capacity of a reclaimed area functioning as the catchment for the Paringin pit lake by applying two hydrological models: the National Rural Electric Cooperative Association (NRECA) and the F.J. Mock model. Using an integrated approach that combines remote sensing, GIS-based spatial analysis, and field-based observations—including meteorological data, real-time inflow monitoring using aerial sensors, and Total Suspended Solids (TSS) measurement—both models successfully simulated monthly inflow and showed good agreement with field observations. Under a tropical climate with over 3,000 mm of annual rainfall and evaporation exceeding 1,000 mm, the catchment-to-lake area ratio of 6.4:1 was found to support sustainable inflow volumes ranging from 0.078 to 0.103 m³/s throughout the year. Although the estimated erosion rate of 3.51 t/ha/year remains within acceptable limits, average TSS levels (89.13 mg/L) exceeded the regulatory threshold of 50 mg/L for raw water supply and aquaculture use. The results affirm the effectiveness of the NRECA and F.J. Mock model in supporting post-mining water management where monitoring data are scarce. This study contributes to the growing need for hydrological connectivity assessment in post-mining landscapes and supports improved planning and sustainable management of pit lakes as integrated components of degraded post-mining land.
Cyperus rotundus L is a hyperaccumulator plant for decomposing heavy metals. High heavy metal content can inhibit its growth, thus reducing its removal efficiency. Using microorganisms in the phytoremediation process will likely improve their performance in decomposing heavy metals and increase...