There is a lack of awareness and knowledge among the Malaysian construction industry about waste management reduction. Numerous nations worldwide have understood and have incorporated the concept of the 3R (reduce, reuse, and recycle) in waste management, and it has worked out well. This study investigated construction waste issues and developed a model for sustainable reduction by applying 3R using a partial least squares structural equation modeling PLS-SEM in Malaysia. The research methodology adopted the quantitative and qualitative approaches by sending a survey questionnaire to the relevant stakeholders to obtain their views or perceptions and interviewing an expert in the related field about waste reduction in the Malaysian construction industry. Three hundred thirty questionnaires were collected within six months of submission. The significant factors are determined using mean ranking for the reduce, reuse and recycle elements. Based on the results, the exploratory power of the study model is considered sustainable with R2 values of 0.83%. At the same time, the results of relationships between improving factors, policy-related factors, construction waste generated, and sustainable construction waste reduction were significant. Also, the findings revealed that the top factors for waste generation on reducing, reusing, and recycling are lack of design and documentation, and lack of guidance for effective construction waste-collecting. The paper will explore different and dynamic practices, such as recycling, reuse of construction waste management cost reduction, enabling stakeholders and managers to estimate and quantify the actual size of CWM costs and benefits for sustainable development goals.
As the construction industry grows, it produces large volumes of construction waste, which has a tremendous environmental impact and generates public concern in the neighbouring towns. The construction industry generates a significant volume of waste and faces a challenge with poor construction waste minimisation in order to prevent adverse environmental and dumping impacts worldwide. In developing countries, regional waste management systems have increased problems. Environmental pollution (air, water, and soil) and human health issues are caused by waste produced in a country as a result of different cultural, social, and religious activities. Prior studies were reviewed to choose dimensions and items for the data gathering instrument. A pilot test was conducted to identify potential questionnaire adjustments, and hypotheses were tested using structural equation modelling (SEM). A total of 220 Malaysian construction professionals answered the survey, which yielded the results. Five hypotheses have direct correlations based on the findings, three of which have a significant effect. Furthermore, the findings reveal that policy-related factors mediate the relationship between improving factors and sustainable construction waste minimisation. In contrast, they did not mediate the relationship between current practices/generation and sustainable construction waste management. The established framework can help improve construction waste management and help achieve global sustainable development goals. The data reveal that adopting preventive plans to reduce construction waste is one of the most important aspects of enhancing profitability. This study could aid construction industry players in evaluating waste management components during the construction and design stages of a building project.
This study aims to assess the barriers impeding cloud computing (CC) applicability in sustainable construction. A total of 11 barriers in the use of CC were identified for the literature review. A questionnaire survey was used to collect the data from construction stakeholders. In total, 101 valid responses were obtained and analyzed using mean ranking, normalized value (NV), overlapping analysis, Kruskal–Wallis H test, exploratory factor analysis (EFA), and fuzzy synthetic evaluation (FSE). The EFA extracted four interrelated components: social, economic, expertise, and connectivity. These components were exported for mathematical analyzing using the FSE technique. As a result, the FSE indicated that connectivity is the highest-impacted component, while the overall impact level of barriers is inclined to high regarding CC applicability in sustainable construction. This is due to other components having an average to high impact level. In this regard, the findings reflect the actual current status of developing countries in using CC in sustainable construction. These research findings will allow construction stakeholders to take proactive steps toward increasing the use of CC in their current and future sustainable construction. Decision-makers could also make accurate decisions that are well-informed in managing CC barriers. This paper provides stakeholders, researchers, and decision-makers with a list of CC barriers that hinder developing countries.
The sustainable building concept must be implemented throughout the project lifecycle to achieve the highest proceeds without lowering the standard. Although implementing green walls in emerging nations is partial, such studies have concentrated on drivers for implementing green walls. Conversely, there is less proof to comprehensively study the impact of implementing green walls’ overall sustainable success (OSS) concerning the lifecycle of projects. This research focuses on the green wall adoption barriers in construction projects in third-world nations. It assesses the effect of addressing green wall (GW) adoption obstacles on OSS throughout the project lifespan. Therefore, a broader review of the literature is needed for conceptual model development. Structural equation modelling and partial least square (SEM-PLS) have been developed employing a survey evaluation tool (i.e., questionnaire). Information was derived from one hundred and five building professionals in Nigeria. The model output revealed that eradicating GWs barriers had a slight to intermediate influence on OSS during the construction scheme’s lifespan. These results offer the foundation for policymaking in third-world nations regarding successful project completion through evading barriers to green wall adoption. Similarly, green walls implementation will enhance the building project’s success.
Sustainability concepts should be adopted via new technologies to achieve the greatest possible gains without compromising the objectives of projects. In this research, we empirically investigated the influence of identified drivers on the implementation of robotics in the building sector of developing countries. To this end, with a view to sustainable building projects, the drivers of robotics were derived from the literature, which were subsequently contextually adjusted using a survey method through the exploratory factor analysis (EFA) method. The results of EFA revealed that the drivers of robotics can be classified into three primary constructs: technology, industry, and culture. However, the benefits of implementing robotics can be grouped into two primary constructs: resources and environment. Therefore, in this study, we employed partial least squares structural equation modeling (PLS-SEM) to evaluate the connections amongst drivers and applications of robotics in Nigeria’s building industry. The results indicated that the input to the implementation of robotics in Nigeria’s building industry via the drivers of robotics has a considerable influence at a small scale, with an impact of 14.5%. The findings of this study can serve as a guide for policymakers looking to improve their projects and increase sustainability by using robotics in the building sector.