The working environment of underground mines is complicated, making it difficult to construct an underground mine production plan. In response to the requirements for the preparation of a short-term production plan for underground mines, an optimization model for short-term resource planning was constructed, with the goal of maximizing the total revenue during the planning period. The artificial bee colony optimization algorithm is used to solve the model using MATLAB. According to the basic requirements of underground mine ore haulage and ore hoisting, a haulage equipment inter-stopes dispatch plan model was constructed, with the primary goal of minimizing the haulage equipment wait time. A non-dominated sorting genetic algorithm is used to solve the optimization model. An underground mine is examined using the two models, and the optimization results are compared and verified with the scheme obtained by using traditional optimization algorithms. Results show that based on the improved optimization algorithm, the use of short-term production planning schemes to guide mine production operations can increase the haulage equipment utilization rate, thereby increasing mine production revenue.
Due to production space and operating environment requirements, mine production equipment often breaks down, seriously affecting the mine’s production schedule. To ensure the smooth completion of the haulage operation plan under abnormal conditions, a model of the haulage equipment rescheduling plan based on the random simulation of equipment breakdowns is established in this paper. The model aims to accomplish both the maximum completion rate of the original mining plan and the minimum fluctuation of the ore grade during the rescheduling period. This model is optimized by improving the wolf colony algorithm and changing the location update formula of the individuals in the wolf colony. Then, the optimal model solution can be used to optimize the rescheduling of the haulage plan by considering equipment breakdowns. The application of the proposed method in an underground mine revealed that the completion rate of the mine’s daily mining plan reached 83.40% without increasing the amount of equipment, while the ore quality remained stable. Moreover, the improved optimization algorithm converged quickly and was characterized by high robustness.