Thiemo Pesch

Dr. Thiemo Pesch

orcid

Research Focus & Metrics

Academic Career Length

14Years (2013-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
14 September 2022 in Nature Communications
Verified
Journal Article
Open access
PDF file
BSBenjamin Schaefer
Benjamin Schaefer
TPThiemo Pesch
Thiemo Pesch
DMDebsankha Manik
Debsankha Manik
JGJulian Gollenstede
Julian Gollenstede
GLGuosong Lin
Guosong Lin
MTMarc Timme
Marc Timme
The ongoing energy transition requires power grid extensions to connect renewable generators to consumers and to transfer power among distant areas. The process of grid extension requires a large investment of resources and is supposed to make grid operation more robust. Yet, counter-intuitively, increasing the capacity of existing lines or adding new lines may also reduce the overall system performance and even promote blackouts due to Braess’ paradox. Braess’ paradox was theoretically modeled but not yet proven in realistically scaled power grids. Here, we present an experimental setup demonstrating Braess’ paradox in an AC power grid and show how it constrains ongoing large-scale grid extension projects. We present a topological theory that reveals the key mechanism and predicts Braessian grid extensions from the network structure. These results offer a theoretical method to understand and practical guidelines in support of preventing unsuitable infrastructures and the systemic planning of grid extensions.

24 June 2014 in The European Physical Journal Special Topics
Verified
Journal Article
Closed access
PDF file
TPThiemo Pesch
Thiemo Pesch
HAH.-J. Allelein
H.-J. Allelein
JHJ.-F. Hake
J.-F. Hake

1 May 2015 in New Journal of Physics
Verified
Journal Article
Open access
PDF file
TPThiemo Pesch
Thiemo Pesch
SSS Schröders
S Schröders
HAH J Allelein
H J Allelein
JHJ F Hake
J F Hake

16 November 2021 in Energies
Verified
Journal Article
Open access
PDF file
YLYifei Lu
Yifei Lu
TPThiemo Pesch
Thiemo Pesch
ABAndrea Benigni
Andrea Benigni
Due to the increasing share of renewable energy sources in the electrical network, the focus on decarbonization has extended into other energy sectors. The gas sector is of special interest because it can offer seasonal storage capacity and additional flexibility to the electricity sector. In this paper, we present a new simulation method designed for hydrogen-enriched natural gas network simulation. It can handle different gas compositions and is thus able to accurately analyze the impact of hydrogen injections into natural gas pipelines. After describing the newly defined simulation method, we demonstrate how the simulation tool can be used to analyze a hydrogen-enriched gas pipeline network. An exemplary co-simulation of coupled power and gas networks shows that hydrogen injections are severely constrained by the gas pipeline network, highlighting the importance and necessity of considering different gas compositions in the simulation.


12 June 2025 in IEEE Transactions on Power Systems
Verified
Journal Article
Open access
CHCarsten Hartmann
Carsten Hartmann
JZJunjie Zhang
Junjie Zhang
CCCarlos D. Gonzalez Calaza
Carlos D. Gonzalez Calaza
TPThiemo Pesch
Thiemo Pesch
KMKristel Michielsen
Kristel Michielsen
ABAndrea Benigni
Andrea Benigni
Graph partitioning has many applications in power systems, from decentralized state estimation to parallel simulation. Focusing on parallel simulation, optimal grid partitioning minimizes the idle time caused by different simulation times for the sub-networks and their components and reduces the overhead required to simulate the cuts. Partitioning a graph into two parts such that, for example, the cut is minimal and the sub-graphs have equal size is an NP-hard problem. In this paper, we show how optimal partitioning of a graph can be obtained using quantum annealing (QA). We show how to map the requirements for optimal splitting to a quadratic unconstrained binary optimization (QUBO) formulation and test the proposed formulation using a current D-Wave QPU. We show that the necessity to find an embedding of the QUBO on current D-Wave QPUs limits the problem size to under 200 buses and notably affects the time-to-solution. We finally discuss the implications of quantum hardware non-ideality on near term implementation in the simulation loop.