Alexandre Moreira

Alexandre Moreira


Research Focus & Metrics

Academic Career Length

10Years (2017-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 June 2017 in IEEE Transactions on Power Systems
Verified
Journal Article
Closed access
AMAlexandre Moreira
Alexandre Moreira
GSGoran Strbac
Goran Strbac
RMRodrigo Moreno
Rodrigo Moreno
ASAlexandre Street
Alexandre Street
IKIoannis Konstantelos
Ioannis Konstantelos
The benefits of new transmission investment significantly depend on deployment patterns of renewable electricity generation that are characterized by severe uncertainty. In this context, this paper presents a novel methodology to solve the transmission expansion planning problem under generation expansion uncertainty in a min-max regret fashion, when considering flexible network options and $n-1$ security criterion. To do so, we propose a five-level mixed integer linear programming (MILP) based model that comprises: (i) the optimal network investment plan (including phase shifters), (ii) the realization of generation expansion, (iii) the co-optimization of energy and reserves given transmission and generation expansions, (iv) the realization of system outages, and (v) the decision on optimal post-contingency corrective control. In order to solve the five-level model, we present a cutting plane algorithm that ultimately identifies the optimal min-max regret flexible transmission plan in a finite number of steps. The numerical studies carried out demonstrate: (a) the significant benefits associated with flexible network investment options to hedge transmission expansion plans against generation expansion uncertainty and system outages, (b) strategic planning-under-uncertainty uncovers the full benefit of flexible options which may remain undetected under deterministic, perfect information methods, and (c) the computational scalability of the proposed approach.

27 August 2018 in IEEE Transactions on Power Systems
Verified
Journal Article
Closed access
DADiego Alvarado
Diego Alvarado
AMAlexandre Moreira
Alexandre Moreira
RMRodrigo Moreno
Rodrigo Moreno
GSGoran Strbac
Goran Strbac
Distributed energy resources (DER) have the potential to significantly contribute to network security and hence release latent capacity of existing transmission assets. In this context, we propose a distributionally robust approach to network security in order to recognize the limited data and knowledge associated with the underlying process behind the realization of system contingencies within the transmission expansion planning (TEP) problem, and thus determine the optimal portfolio of DER services necessary to displace, in a secure fashion, inefficient network investments. To do so, we propose a two stage optimization model where the first stage determines the transmission expansion plan and the scheduling of DER post-contingency services in coordination with further corrective control measures such as generation reserves. The second stage minimizes the expected cost of corrective actions under various contingencies. Through various case studies, we demonstrate the benefits of security services provided by DER and the advantages of our proposed distributionally robust approach (where outage rates are assumed ambiguous) against alternative n-k security and stochastic approaches, where outage rates are either ignored or assumed fully known, respectively.

12 January 2024 in IEEE Transactions on Power Systems
Verified
Journal Article
Closed access
AMAlexandre Moreira
Alexandre Moreira
FPFelipe Piancó
Felipe Piancó
Bruno Fanzeres dos SantosBruno Fanzeres dos Santos
Bruno Fanzeres dos Santos
ASAlexandre Street
Alexandre Street
RJRuiwei Jiang
Ruiwei Jiang
MHMiguel Heleno
Miguel Heleno
Wildfires can severely damage electricity grids leading to long periods of power interruption. Climate change will exacerbate this threat by increasing the frequency of dry weather conditions. Under these climate conditions, human-related actions that initiate wildfires should be avoided, including those induced by power systems operation. In this paper, we propose a novel optimization model that is capable of determining appropriate network topology changes (via switching actions) to alleviate the levels of power flows through vulnerable parts of the grid so as to decrease the probability of wildfire ignition. Within this framework, the proposed model captures the relationship between failure probabilities and line-flow decisions by explicitly considering the former as a function of the latter. The resulting formulation is a two-stage model with endogenous decision-dependent probabilities, where the first stage determines the optimal switching actions and the second stage evaluates the worst-case expected operation cost. We propose an exact iterative method to deal with this intricate problem and the methodology is illustrated with a 54-bus and a 138-bus distribution system.

4 May 2023 in IEEE Transactions on Power Systems
Verified
Journal Article
Open access
AMAlexandre Moreira
Alexandre Moreira
MHMiguel Heleno
Miguel Heleno
AVAlan Valenzuela
Alan Valenzuela
JEJoseph H. Eto
Joseph H. Eto
JOJaime Ortega
Jaime Ortega
CBCristina Botero
Cristina Botero
Distribution grid reliability and resilience has become a major topic of concern for utilities and their regulators. In particular, with the increase in severity of extreme events, utilities are considering major investments in distribution grid assets to mitigate the damage of highly impactful outages. Communicating the overall economic and risk-mitigation benefits of these investments to regulators is an important element of the approval process. Today, industry reliability and resilience planning practices are based largely on methods that do not take explicit account of risk. This paper proposes a practical method for identifying optimal combinations of investments in new line segments and storage devices while considering the balance between the risk associated with high impact and low probability (HILP) events and the reliability related to routine failures. We show that this method can be scaled to address large scale networks and demonstrate its benefits using a Target Feeder from the Commonwealth Edison Reliability Program.

8 May 2025 in IEEE Transactions on Power Systems
Verified
Journal Article
Closed access
FPFelipe Piancó
Felipe Piancó
AMAlexandre Moreira
Alexandre Moreira
Bruno Fanzeres dos SantosBruno Fanzeres dos Santos
Bruno Fanzeres dos Santos
RJRuiwei Jiang
Ruiwei Jiang
CZChaoyue Zhao
Chaoyue Zhao
MHMiguel Heleno
Miguel Heleno
The interaction between power systems and wildfires can be dangerous and costly. Distribution grids can be liable for the outbreak of wildfires during extreme weather. In wildfire-prone areas, investment planning should consider the impact of operational actions on wildfire-related uncertainties affecting line failure likelihood. In this case, endogenous-based uncertainty modeling should comprise the backbone of the investment planning model viz-a-viz the inability of standard exogenous-based uncertainty modeling. Therefore, we propose a decision-dependent uncertainty (DDU) aware methodology to optimize investment portfolios for distribution systems, considering that high power-flow levels in high-threat areas can ignite wildfires and increase line failure probability. The methodology identifies the best combination of upgrades (new lines, hardening existing lines, and placing switching devices). Methodologically, we propose a two-stage distributionally robust planning optimization problem with DDU that considers the distribution system's multiperiod operation. The first stage determines optimal switching actions and line investments, and the second stage evaluates the worst-case expected operational cost under a DDU framework designed to account for the endogenous impact of power-flow levels and hardening investment decisions in the line failure probabilities. An iterative method is tailored to handle the problem and numerical experiments demonstrate a more prepared grid to deal with wildfire risk.

15 July 2024 in Electric Power Systems Research
Verified
Journal Article
Closed access
AMAlexandre Moreira
Alexandre Moreira
Bruno Fanzeres dos SantosBruno Fanzeres dos Santos
Bruno Fanzeres dos Santos
PSPatrícia de Sousa Oliveira Silva
Patrícia de Sousa Oliveira Silva
MHMiguel Heleno
Miguel Heleno
AMAndré Luís Marques Marcato
André Luís Marques Marcato