Khalegh Barati

Dr. Khalegh Barati


Research Focus & Metrics

Academic Career Length

11Years (2016-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
7 December 2021 in Buildings
Verified
Journal Article
Open access
PDF file
LLLoizos Loizou
Loizos Loizou
KBKhalegh Barati
Khalegh Barati
XSXuesong Shen
Xuesong Shen
Binghao LiBinghao Li
Binghao Li
The construction industry is a significant source of waste generation in any economy, producing various greenhouse gases, releasing harmful substances into the natural environment, and requiring large areas of land for processing, treatment, and landfilling. The emerging field of off-site prefabrication and assembly is perceived as a viable method to reduce waste and improve sustainability. However, there is a lack of quantifiable research into the difference between off-site prefabrication and on-site, conventional construction for numerous sustainability criteria. This paper focuses on modular construction as an off-site production system, where a framework to compare waste generation of modular and conventional, in-situ construction methods is proposed. This paper aims to quantify these differences. The framework relies on a comprehensive literature review to estimate the waste rates of building materials, which are then applied to realistic case studies in order to determine the differences in waste generation. Overall, modular construction reduces the overall weight of waste by up to 83.2%, for the cases considered. This corresponds to a 47.9% decrease in the cost of waste for large structures. Care must be taken to keep modular wastage as low as possible for a reduced cost of waste to be also present in smaller structures. This reduces the research gap of quantifying the waste differences between conventional and modular construction, and provides thoroughly researched waste rates for future research, while also improving the knowledge of industry stakeholders, informing them of the benefits of modular construction. This allows stakeholders to make more informed decisions when selecting an appropriate construction method.

31 March 2023 in Buildings
Verified
Journal Article
Open access
PDF file
MIMohammad Hashim Ibrahimkhil
Mohammad Hashim Ibrahimkhil
XSXuesong Shen
Xuesong Shen
KBKhalegh Barati
Khalegh Barati
Cynthia Changxin WangCynthia Changxin Wang
Cynthia Changxin Wang
Traditional progress monitoring can be inaccurate and time-consuming, potentially causing time delay and cost overrun in construction projects. With development in technology, tools such as cameras, laser scanners, and building information modelling (BIM) have been used to overcome existing problems in the traditional approach. However, noise mitigation, extracting objects of interest from laser point clouds, and detailed progress measurement are problems that still exist. In this study a novel method of construction progress monitoring to measure the progress percentage is presented. The study integrates the simultaneous localization and mapping (SLAM) technique with as-built BIM to gather quick and accurate construction site progress information. The Hausdorff distance is utilized to extract objects of interest and filter out noise from site-scan data. As-built and as-planned BIM models are compared using Python and Dynamo, to obtain progress percentage. A case study was conducted on a residential building located in Sydney, Australia, to validate the application of the developed method. The outcome demonstrates that utilizing the SLAM technique and Hausdorff distance are effective in mitigating noise and extracting objects of interest from site-scan data, respectively. In addition, with an accuracy of 94.67 percent in estimation, the progress percentage was obtained based on material quantities. The obtained progress percentage could also be used in updating construction schedules and assisting decision-making.

25 June 2023 in Sensors
Verified
Journal Article
Open access
PDF file
YGYouheng Guo
Youheng Guo
XSXuesong Shen
Xuesong Shen
JLJames Linke
James Linke
ZWZihao Wang
Zihao Wang
KBKhalegh Barati
Khalegh Barati
Aging infrastructure has drawn increased attention globally, as its collapse would be destructive economically and socially. Precise quantification of minor defects is essential for identifying issues before structural failure occurs. Most studies measured the dimension of defects at image level, ignoring the third-dimensional information available from close-range photogrammetry. This paper aims to develop an efficient approach to accurately detecting and quantifying minor defects on complicated infrastructures. Pixel sizes of inspection images are estimated using spatial information generated from three-dimensional (3D) point cloud reconstruction. The key contribution of this research is to obtain the actual pixel size within the grided small sections by relating spatial information. To automate the process, deep learning technology is applied to detect and highlight the cracked area at the pixel level. The adopted convolutional neural network (CNN) achieves an F1 score of 0.613 for minor crack extraction. After that, the actual crack dimension can be derived by multiplying the pixel number with the pixel size. Compared with the traditional approach, defects distributed on a complex structure can be estimated with the proposed approach. A pilot case study was conducted on a concrete footpath with cracks distributed on a selected 1500 mm × 1500 mm concrete road section. Overall, 10 out of 88 images are selected for validation; average errors ranging from 0.26 mm to 0.71 mm were achieved for minor cracks under 5 mm, which demonstrates a promising result of the proposed study.

21 July 2016 in Proceedings of the 37th International Symposium on Automation and Robotics in Construction (isarc)
Verified
Conference Paper
Closed access
JKJacob Klein
Jacob Klein
XSXuesong Shen
Xuesong Shen
KBKhalegh Barati
Khalegh Barati
I.A.A.R.C. - International Association for Automation and Robotics in Construction Civil Engineering

29 March 2018
Verified
Conference Paper
Closed access
KBKhalegh Barati
Khalegh Barati
XSXuesong Shen
Xuesong Shen
Equipment operations account for more than 50% of fuel use as well as emission production in the construction industry. Currently construction firms have investigated into engine technologies and fuel attributes for reducing the fuel consumption, which may not be economical and can hardly be applied to the existing fleet of equipment. This paper aims to optimize the fuel use of on-road construction equipment through developing operational level fuel reduction strategies. Acceleration, speed, weight, and road slope have been investigated as main parameters influencing fuel use of on-road construction vehicles in this study. Field experimentations were conducted to collect real-world data from seven in-use heavy duty on-road construction trucks. Artificial neural network (ANN) analysis was applied to model the effect of investigated variables on fuel use rate. Considering operational factors and road conditions, optimal driving speed is determined to minimize the amount of fuel used per travelled distance. It is also verified quantitatively that fuel use will rise significantly by increasing the weight of vehicles and road slope. Mitigating idling time and reducing equipment stops are other effective means that are applicable to decrease the rate of fuel use. These operational level optimization measures can be readily used as a guideline for equipment operators to enhance the fuel efficiency of construction equipment while saving operational cost considerably.

27 July 2025 in Proceedings of the 37th International Symposium on Automation and Robotics in Construction (isarc)
Verified
Conference Paper
Open access
PDF file
MGMikael Gilbert
Mikael Gilbert
KBKhalegh Barati
Khalegh Barati
XSXuesong Shen
Xuesong Shen
The prevalence of prefabrication in the modern construction industry has highlighted the importance of sustainable management of these new construction materials. Despite reduced emissions through minimizing construction time and production waste, at the end of the building's life, the amount of construction waste produced remains constant. This paper aims to investigate the environmental and economical sustainability impacts from reusing prefabricated concrete and cross laminated timber panels sourced from buildings reaching the end of its service life. The main framework used focuses on applying a lifecycle assessment in terms of embodied energy to a unit of the selected prefabricated material. The results from this analysis are then further expanded to include varying distances between the donor and host building, allowing for a comparison between the embodied energy saved and additional energy consumption from transporting the construction materials. Furthermore, the economic sustainability of this construction practice are calculated. A case study was conducted using a 3D BIM model of a residential structure whereby the materials are quantified and paired with data obtained from the LCA. The results have shown that there are energy savings of 36,628.6 MJ/m 3 and 66.6 MJ/m 3 for concrete and cross laminated timber panels, respectively. Additionally, a trendline showing the correlation between distance and embodied energy savings for both materials were observed. The research contributes to providing alternatives for sustainable waste management and material selection policy in the construction industry.