Non-hard-hat use (NHU) is related to many construction accidents, so NHU inspection is crucial to safety management, in which automatic NHU monitoring plays an essential role. Existing computer vision–based NHU inspection methods lack capabilities in identifying workers and helping take real-time action. Previous sensor-based NHU inspection methods require direct skin contact, which would be uncomfortable for workers. In addition, previous sensor-based methods could be deceived by objects other than human heads and could not achieve real-time alarms. This study aims to address these problems by implementing real-time alarming, monitoring, and locating for NHU in construction based on sensor, mobile, web, and cloud techniques. A smart hard-hat system is developed using an Internet of Things (IoT)-based architecture including (1) a hard hat with an infrared beam detector and thermal infrared sensor for nonintrusive NHU detection; (2) radio-frequency identification (RFID) triggers for locating NHU with an average detection error of less than 10 cm; (3) a smartphone application for personalized warnings; (4) a web application for data visualization and alarms for managers; and (5) a cloud sever for data storage and retrieval. The proposed system enables both workers and managers to take timely actions against NHU. The system performance is evaluated in a laboratory test and validated in a field application. It is indicated that the proposed system is accurate and reliable, showing potential to promote safety inspection and supervision in construction.
30 January 2020 in Computer-Aided Civil and Infrastructure Engineering
Struck‐by accidents often cause serious injuries in construction. Monitoring of the struck‐by hazards in terms of spatial relationship between a worker and a heavy vehicle is crucial to prevent such accidents. The computer vision‐based technique has been put forward for monitoring the struck‐by hazards but there exists shortages such as spatial relationship distortion due to two‐dimensional (2D) image pixels‐based estimation and self‐occlusion of heavy vehicles. This study is aimed to address these problems, including the detection of workers and heavy vehicles, three‐dimensional (3D) bounding box reconstruction for the detected objects, depth and range estimation in the monocular 2D vision, and 3D spatial relationship recognition. A series of experiments were conducted to evaluate the proposed method. The proposed method is expected to estimate 3D spatial relationship between construction worker and heavy vehicle in a real‐time and view‐invariant manner, thus enhancing struck‐by hazards monitoring at the construction site.
8 January 2021 in JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT
Delivery of the prefabricated components may be disrupted by low productivity and various of traffic restrictions, thus delaying the prefabricated construction project. However, planning of the prefabricated component supply chain (PCSC) under disruptions has seldom been studied. This paper studies the construction schedule-dependent resilience for the PCSC plan by considering transportation costs and proposes a multi-objective optimization model. First, the PCSC planning problem regarding schedule-dependent resilience and resultant transportation cost is analyzed. Second, a quantification scheme of the schedule-dependent resilience of the PCSC plan is proposed. Third, formulation of the resilience-cost tradeoff optimization model for the PCSC planning is developed. Fourth, the multi-objective particle swarm optimization (MOPSO)-based method for solving the resilience-cost tradeoff model is presented. Finally, a case study is presented to demonstrate and justify the developed method. This study contributes to the knowledge and methodologies for PCSC management by addressing resilience at the planning stage.
1 January 2018 in Journal of Management in Engineering
There are dynamic, interactive, and long-term relationships among the highway pavement performance, operator’s toll income and maintenance costs, the users’ satisfaction or willingness to travel, the government’s satisfaction, and decisions during the concession period of the public-private partnership (PPP) highway project. This study adopts a system dynamics (SD) model to simulate such complex interactions among the highway pavement performance and stakeholders’ relevant factors during the concession period of the PPP highway project, in which pavement maintenance is emphasized. The SD model is able to evaluate the rationality of the concession period and stakeholders’ impacts in terms of the net present value (NPV). Justification and demonstration of the proposed SD model are presented based on an example project and a series of simulation experiments. This study is aimed at providing a methodology to help either the public sector or the private investor evaluate concession decision-making by addressing pavement maintenance of the PPP highway project.
1 March 2015 in Journal of Management in Engineering
Whereas estimating emissions from construction processes is crucial to evaluating emission-reduction plans, current approaches can only estimate emissions from an average rather than operational perspective due to an inability to model uncertainties or randomness for reflecting application characteristics. A discrete-event simulation (DES) method is presented for estimating construction emissions by addressing existing problems. An investigation on the load factor reflecting the application characteristics of some construction equipment is performed, and then an emissions-calculating model able to consider uncertainties or randomness regarding various activities in the equipment duty cycle is proposed. To implement the emissions-calculating model, an available DES system is modified regarding the modeling capabilities for emissions-related factors and the simulation strategy incorporating the emissions-calculating model. The presented DES method is expected to help evaluate the emissions-reduction...