Khaled Ali Elnagdy

Dr. Khaled Ali Elnagdy


Research Focus & Metrics

Academic Career Length

15Years (2012-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
11 May 2012 in Journal of King Saud University – Engineering Sciences
Verified
Journal Article
Open access
TATariq F. Al-Fariss
Tariq F. Al-Fariss
FEFarag A. Abd El-Aleem
Farag A. Abd El-Aleem
KEKhaled Ali Elnagdy
Khaled Ali Elnagdy
Phosphoric acid industry is expected to develop in Saudi Arabia in the near future. This is ascribed to the discovery of phosphate in AI-Jalamid area located in the northern region of Saudi Arabia, the availability of sulfur as a by-product from petrochemical industries and the construction of phosphate fertilizers required by the growing agricultural sector. The discovered Saudi phosphate ores are of sedimentary origin with calcite and dolomite as the main impurities. The beneficiation of this type of ores is a key factor for the successful production of phosphoric acid by the wet process. In the present work, a flotation column has been designed and applied in the beneficiation of Al-Jalamid Saudi phosphate ores of the calcareous type by reverse scheme. The significant parameters like superficial gas velocity, slurry feed rate, particle size of processed ore, wash water consumption and collector dosage of flotation process are investigated to achieve the best recovery and quality of the beneficiated ores. The results of this study revealed that column flotation technology is a promising tool for beneficiation of calcareous phosphate ores. A high purity ore of 35% P2O5 can be easily achieved at a high recovery value of 95% starting from a rock contains 25% P2O5, high calcite content (52.7% CaO) and CaO:P2O5 ratio equals 2.1.

27 November 2015 in International Journal of Coal Science & Technology
Verified
Journal Article
Open access
PDF file
KEKhaled Ali Elnagdy
Khaled Ali Elnagdy
ASAbeer Mahmoud Shoaib
Abeer Mahmoud Shoaib
In underground constructions, a good ventilation design not only delivers fresh air to establish good working environment, but also provides a scientific and reliable basis to prevent disasters. In emergency cases, unexpected closure of the main airways may occur, providing the workers with alternative airways is substantial. This is important not only to sustain personnel lives, but also to prevent the mine ventilation system from damage. In this research, alternate solutions were introduced in case of failure in the underground construction to keep a pre-assigned fixed quantity in a working place for mine ventilation network. Eight different collapse scenarios were proposed to study their effect on the air quantity distribution among the branches in the ventilation circuit. From these scenarios, it is found that providing a sufficient air quantity in the working places could be achieved through modification of the network topology and adjusting the values of the regulators pressure. It is also indicated that the distance between the collapse and working places has a great effect on the amount of air delivered to it. A reduction in the power consumption could be done by re-arrange the installed regulators and decreasing the number of nodes and branches inside the network. A relationship representing the effect of changing the network topology on the total network power consumption was deduced through regression analysis. It is found that the total network power is quadratic dependent on the number of regulators and number of branches while it is directly dependent on the regulator power.